Post Job Free

Resume

Sign in

Electrical Engineer Energy Conservation

Location:
Dubai, United Arab Emirates
Posted:
July 08, 2021

Contact this candidate

Resume:

Name: M. Pattabhi Ramakrishna

Mobile: +971-**-*******, 056-*******

E-mail: adnlsg@r.postjobfree.com

Year of Birth:

**-**-****

Present Position: Sr. Electrical Engineer

Nationality: Indian

Profession: Electrical Engineer

Specialization: Electrical

Qualifications: BS-Eng., MIET, LEED Green Associate.

Engineering from Birla Institute of Technology and Science- Pilani, India

Profile

Electrical Engineer with over 18 years of experience in the areas of Design, Execution, Project Management, Installation, Commissioning & Testing, Operations & Maintenance. Now based with Arcadis.

Expertise & Experience in overall site operations and project management activities including working out various requirements with respect to utilities, manpower & monitoring overall project operations for ensuring timely completion. Hands on exposure in managing resources to perform project activities within the budget in cost effective manner ensuring that operations are carried out smoothly with commissioning & procurement operations. Instrumental in handling high rise Building projects, hospitality projects, Retail/ Commercial, Health care/ Pharma/Biotech projects, process oriented, School projects, LEED Projects, infrastructure complete Electrical system (High Voltage /Medium voltage/ Low Voltage Systems), Low current Systems, ICT systems, Security Systems, RMS, Lighting control systems, AWL, Generators, UPS, BMS, Earthing & Lightening Protection, ELV systems, Automated Car park System, HVAC systems, Clean air Systems, utility infrastructure etc.

Considerable experience in Design, execution, planning & management, Contract management & reviews.

Excellent relationship management & technical writing skills.

Certification & others:

MIET

LEED Green Associate

Trakhees- Accredited- MEP Engineer

Member-PMI

Possess a valid UAE driving license.

Over All Responsibilities: In All Projects

Overseeing of Electrical services Infrastructure construction process to ensure that the design documentation is safely and accurately implemented on site.

To ensure all materials proposed and selected to be used with in the project shall be subject to Authorities’ approval and shall comply with the technical specification and defined standards.

Review of drawings for substations above & below 11kv, cable basements, raised modular flooring of control stations, Telephone & LV station supply rooms.

Review of drawings for underground cable routing, and ducts.

Well versed in the review of drawings for water, wastewater treatment facilities and pumping stations.

Knowledge on review and troubleshooting of PLC (programmable Logic Controllers) and Motor drive controls.

Well versed with power, instrumentation, control automation, of infrastructure projects.

Verification of voltage drop and discrimination studies.

Experience in (MV switchgear, MV cables, Transformers, MCC panels, LV cables, Street lighting, Earthing, Lightening protection) installations etc.

Review of electrical drawings, review of all electrical related documents submission, be able to monitor the work progress, participate and coordinate with the Contractor to ensure a timely response to all submissions, inspections, and other required actions.

Review of shop drawings pertaining to LV & MV network of the infrastructure.

Review of shop drawings pertaining to Low current systems infra network like, Telecommunication, Security systems etc.

Review of coordinated shop drawings consisting of various MEP services like, Chilled water, water line, Fire hydrant, LV network, MV network, Feeder pillars, telecommunication system, manholes, Street lighting, pumping stations etc.

Review of shop drawings of various public amenities services like retail units, Mosques, townhalls etc.

Review of material submittals, method statements, and other contractual documents.

Liasoning with authorities.

Coordinate effectively with other architects and engineers throughout project lifecycles (planning, concept, preliminary, final etc.); review and understand drawings and specifications to ensure that adequate provisions in electrical IFC are made based on the designs provided by the other sections.

Developing a trusted relationship with the client’s counterpart staff and establishing an appropriate working relationship with the contractors.

Emphasis on safe construction practices (Zero tolerance) and on maintaining a high quality of construction.

Tender reviews and PTCs

Installation inspections.

Material Inspections.

Factory inspections.

Review of technical activities.

Raising Sis, & NCNs

Site program.

Monthly payments.

Progress reports.

Variations.

Testing & Commissioning.

Snagging & De snagging

Final Handing over

DLP

Value Engineering

Selected Experience

Since Sep-2014- To Date Arcadis- as Sr. Engineer-Electrical

Project:

The Cove on Plot A-20-DCH

Client: Emaar

A waterfront community project consisting of 3 Blocks (Block D with G+21+R, Block C with G+MEZ. +9+R and Block J with G+6+R) total 276 flats, 73 one-bedroom type, 116 two- bed rooms type, 79 three-bedrooms type and 8 four-bedrooms type + Two basement levels on an amalgamated plot as a car parking (402 Nos.) and swimming pool area @ Floor level.

Also consisting of stylish boutiques, F&B units, lushly landscaped pathways, parks, promenades, other amenities like Gym and yoga.

New Deira Fish Market:

Client: Dubai Municipality

The project consists of a new building housing market area, retail shops-843, F&B areas-22, Cold rooms-73, freezer storage areas, Automatic car parking areas etc.

Index Tower Retail Development @ DIFC:

Client: Emirates-REIT

It encompasses the rearrangement of podium retail section of the building; this includes extension of F&B units etc

Project:

Emerald Palace Kempinski Hotel & Villas:

Client: Sun rise properties

Kempinski Hotel is a classically designed 5-star Hotel consisting of a single level basement, lower ground, ground floor plus 6 floors (with roof top restaurants). Basement is designed to serve for car parking and MEP plant rooms. Upper levels include mainly Guest Rooms, Restaurants, and other Public Areas.

The Hotel features a 500-metre private beach, a large, landscaped area with swimming pool and water features, a beach restaurant, a state-of-the-art fitness facility and Spa with indoor pool, business centre, roof top restaurants, kids club, international shopping arcade and several themed signature restaurants and bars including a cigar bar and private dining options.

In addition, there are 8 high end Villas which also form part of the development.

Associated Projects:

Dubai Hills Mall, Dubai, UAE

Client: Emaar

La Mer Jumeirah Open Beach

Client: MERAAS Development

Emaar Boulevard Towers in Downtown-Dubai- PMC activities

Since March-2013 to Aug-2014 Foreman Roberts as Sr. Engineer-MEP

Projects:

GEMS Nations Academy School Project.

Client: GEMS School

A high-end school in a total area of approx. 66445sq.mt, known to be one of the iconic schools in Dubai offering American curriculum, having all the facilities (Interactive classrooms, Play areas, Sports fields, Gymnasium, 600 seating capacity auditorium, Black box& Digital theaters, Swimming pools, Dining hall, Laboratories with world class facilities,, Recreation spaces etc)

School using the latest technology in HVAC systems- Termodeck cooling, implementing sustainable solutions in energy conservation. Like solar water heating.

Title: GEMS Nations Academy School- Al Barsha

Client: GEMS

Architect: Aedas

Design & Supervision of following short term projects Completed:

Prime Minister’s Office Fit out- Emirates Towers- Aedas

Autodesk Fit Out- Tecom- (LEED Project)

Standard Charted Bank-Bur Dubai

Richemont-DIFC

Met Life Fit out project- Client- DAFZA (LEED Project)

Gems Royal Academy- Aedas

Emirates Financial Tower Fit Out- DIFC

Gems Baku

Standard Charted Bank Qurum- Oman

Deutch Bank Fit Out- Riyadh

SAS Office Fit Out- Riyadh

From March’ 2011 to Feb’2013 W.S. Atkins- As Engineer-Electrical

Projects:

Worked in Ghayathi 786 Villas Project- Western Region, Abu Dhabi

Client: Musanada

Worked in AlFalah community development project consisting of 2000 Villas- Abu Dhabi

Client: AlDar

Worked in LEED project at Abu Dhabi International Shooting Club.

Client: PPM

Projects:

ADISC Residential Leisure & Commercial Compound (RLCC)

Consisting of Twin Towers A, B, C, D( G+M+1to7+RF1+RF2) and Towers E,F,G,H and a Community center. And 385 villas.

Al Forsan Hotel- B+G+ 1to5+RF

Sports themed and a 5-star rated hotel with 400 guest rooms. The hotel includes meeting rooms, business centres, retail spaces and Spa etc.

Staff city accommodation consisting of 6 cluster villas and a club house.

Project:

Rocco Forte Hotel, Abu Dhabi, and Boutique Retail mall (previously known as the Bridge way mixed use development) At present Known as Hilton Hotel

A 5 Star rated Hotel includes meeting rooms, business centers, retail spaces, Spa, Restaurants (Asian and European styles), Ball room, Function room, Swimming pools, Atrium etc.

Client: TDIC/ Al Farida Investments

Associated Projects:

PPM Conrad Hotel- Dubai

53 storey towers with 13 level automated car park building.

Yas Island Water Theme Park.

Oct’07- Feb’2011 Bader Almulla & Brothers co- Dubai, as Project Engineer- MEP

Projects Undertaken: Residential & Commercial Tower- -3B+G+CF+MF+40+R

Title : Sky Gardens Tower

Client : Al Mazaya

Consultant: Atkins

Title : Al Bassam Tower-Office Building- -2B+G+5P+23+Mech+R

Client : Al Bassam

Consultant: Al Ajmi

Title : Villa Projects @ Shk. Mansoor Villa @ Al Barsha and Shk.Amar Villa @ Al Sufouh-1B+G+R

Client : EO Office

Title: Al Sondos Tower/ Hotel- G+23+R

Responsible for Building MEP maintenance.

Responsible for DLP period of all above projects.

Jan’07- Oct’07 GVK Industries. Ltd., Hyderabad as Asst. Manager- Projects

Highlights

Associated with construction, execution, and supervision activities of GVK-One mall-Hyderabad.

Initiated new Bio tech project involving design of shop drawings in line with HVAC & Plumbing systems. Construction of R&D units involving research and medical equipment.

Jul’04-Dec’06 Gland Pharma Ltd., Hyderabad as Deputy Manager- Projects

Highlights

Instrumental in implementing FMS system.

Handled both Electrical & Instrumentation projects in Gland Pharma and HVAC equipment’s efficiently. Well versed with clean air systems. Providing utility Services (Electrical, HVAC, Instrumentation etc) to all generic manufacturing equipment. In line with USFDA regulations.

Actively involved in calibration and validation of control panels, involving various process instruments.

Adroitly carried out new expansion projects of electrical with a total load of 2.5 MVA and actively involved in commissioning of synchronization of 2 x 750 KVA DG sets and installation of 2 x 1600 Kva Transformers, Power Panels, Cabling, etc.

Aug’03-Jul’04 Hindustan Seals Ltd., Hyderabad as Sr. Engineer

Highlights

Successful in implementing in house making of Power &control panels, for the new projects & ‘5S’ activities.

Apr’02-Aug’03 Hwashin Automotive India Pvt. Ltd., Chennai as Sr. Engineer- Projects

Highlights

Instrumental for overall Project execution and finalization of load details.

Successfully charged the 33 & 11Kv systems and secondary distribution system.

Apr’98-Mar’02 Matsushita Air Conditioning India Ltd., Chennai as Engineer- Projects

Highlights

Actively involved in

oInstallation & commissioning of LV switchgear, cables, Power panels, Utility equipment.

oCommissioning of 33kv system along with TNEB.

Sep’95-Mar’98 Electrolux- Voltas Ltd., Kadapah, AP as Supervisor

Responsibilities

Assisting in the development of project proposals, cost estimates and budgets, timelines, and schedules.

Preparing reports for Project Managers on status of all services provided for projects.

Assisting in the coordination of all personnel: vendors, contractors, etc., necessary to complete the project.

Highlights

Taking up in house projects, modifications in operational systems.

Upgradation of operational & utility equipment time to time.

Handling first of its kind refrigerator plant located in south India.

Jun’94-Aug’95 Andhra Petrochemicals Ltd., vizag as Technician-Projects

Responsibilities

Managing testing and commissioning activities.

Troubleshooting the systems within the project to ensure smooth operation after handover to the client.

Highlights

Installation

o33kv/132 kv system

oDCS instrumentation system

oUtility equipment

Employment History

2014 to date Arcadis Consulting-Dubai

2013 to 2014 Foreman Roberts Building Consultants-Dubai

2011 to 2013 W.S. Atkins & partners Overseas- Abu Dhabi

2007 to 2011

Bader Al Mulla & Bros Co WLL, Dubai

2006 to 2007

GVK Group Of industries, India

2004 to 2006

Gland Pharma Ltd, India

2003 to 2004

Hindustan Seals, India

1998 to 2003

1995 to 1998

Matsushita Air conditioning, India

Voltas Ltd, India

References:

1.Raja Mohamad Mohideen- Emaar- projects Dept

Mob: 050*******

2.Suresh- MEP Resident Engineer- AECOM

Mob: 050*******



Contact this candidate