Post Job Free

Resume

Sign in

Mechanical Engineer Pipeline Construction

Location:
Hyderabad, Telangana, India
Posted:
July 05, 2021

Contact this candidate

Resume:

Syed Azeemuddin

Mechanical Engineer

Mob (India): +91-837*******

: +91-949*******

Email: adnjky@r.postjobfree.com

** ***** *** & Gas (Onshore and Offshore) Projects Experience as Projects & Construction Engineer

OBJECTIVE:

Dynamic, qualified and experienced Mechanical Engineer with expertise in providing Project & Construction Engineering & Maintenance support for various operations and projects pertinent to Oil and Gas sector in both Onshore and Offshore.

Experience Summary in Oil & Gas Projects (Onshore & Offshore):

10 years’ experience in Construction Engineering, Project Engineering, Logistics coordination, Subcontract Engineering and Maintenance Turnaround Projects:

Oil & Gas Construction Projects (Green and Brown Field):

-Piping Construction (Process and Utility Services) as per ASME B31.3

-Pipeline Construction as per ASME B31.4 & B31.8

-Non-Metallic Piping GRE, GRP, GRV as per ISO 14692

-Building Services Piping B31.9

-Mechanical Equipment Installation

Oil & Gas Maintenance Projects:

-Piping Refurbishment as per R&R (Repair and Recommendation) packages

-Hydro-jetting for cleaning of Heat Exchangers

-Chemical Cleaning of process equipment

-Catalyst Handling works of Dryer Packages

-Major Machinery Overhauling

-Liquid Nitrogen Leak testing of equipment

-Coordination for Manual and Control Valves Overhauling

- Reinstatement works

Summary of Projects Executed:

Project Title

Client

Location

Year of Execution

Salalah Liquefied Petroleum Gas (SLPG Project)

OGC

Salalah, Oman

2018-2020

Upper Oakum 750KProject (UZ-750)-Artificial Island surface facilities- EPC 2

ZADCO (ADNOC)

Zakum Field (Offshore), Abu Dhabi

2015-2018

ADGAS LNG Plant Maintenance shutdown Contract

ADGAS (ADNOC)

Das Island (Offshore), Abu Dhabi

2013- 2015

Qatar Gas LNG plant shutdown project

QATAR GAS

RasLaffan, Doha

2012

BAB Gas compression project in BAB field

ADCO (ADNOC)

Habshan, Abu Dhabi

2011-2012

Implementation of VRC modification and miscellaneous plant modifications including WAG clusters in NEB field

ADCO (ADNOC)

Dabbiya and Rumaitha Field, Abu Dhabi

2010 - 2011

Work Experience History

Sr. Construction Engineer

Petrofac E&C

Salalah, Oman

Oct 2018 – July 2020

-Prepares a plan for execution of site activities as per sequential site works

-Ensures construction Subcontractor performs contracted scope work in accordance with Project quality requirement, specifications and project schedule and HSE standards

-Ensures latest engineering revisions are being followed all times

-Ensuring Standards, specification and local codes and regulations compliance

-Coordinating with engineering and design discipline team members for the required interfaces

-Coordinates with Project teams for issuance of job cards

-Supervises Construction activities pertinent to Underground and Above ground piping works (Metallic and Non-metallic)

-Reviewing and monitoring all piping deliverables

-Sets the Pressure test limits as per commissioning systems and subsystem limits

-Responsible for construction mechanical activities through subcontractor’s supervision in respect of HSE, quality standards

-Monitoring Painting & Insulation work progress for piping.

-Expediting ITRs & Punch closure activities to clear the stages of handover Systems for commissioning as per priorities

-Responsible as Area Authority for signing the area permits

-Coordinates with Field Engineering for the design changes deemed necessary as per site conditions

-Assessed the variation works beyond the contracts & Prepares Site Instruction for early execution.

-Ensures and encourage site team for 100% safety implementations.

-Recommends individual for Monthly HSE awards for good safety performance at site.

Construction Engineer

Petrofac Emirates

Abu Dhabi, UAE

May 2015 – Oct 2018

-Provides engineering, construction resources, materials expediting, logistics support to site construction team.

-Managed Subcontractors manpower and equipment mobilization to work site.

- Reviews/approves construction method statements and fabrication drawings (weld map) for subcontractors.

-Manage and Supervises site activities and ensures construction activities are following project QHSE requirement.

-Verifies and Issues site instructions for additional site works that may arise due to new revisions or site modifications

-Attends daily mechanical completions meeting with client and subcontractors to review the ITR close out progress

- Supervises UG (Non-Metallic) and AG (Metallic) Piping Construction works

-Led daily site coordination meeting with all subcontractors for the required interface among the subcontractors for the sequential activities.

-Reviews and approves the test packs for hydro-testing limits and performs line pre-walk downs prior Hydro-test and post walk down for final mechanical completions after reinstatement.

-Classifies the Punch categories and follow-up for timely closeout

-Lead the Mechanical Completion and Handover walk-downs with client

-Coordinates and monitors vendor activities and verifies the time sheets

Project Engineer

Qatar Engineering and Construction LLC

Abu Dhabi, UAE

Jan 2013 - May 2015

-Developing and directing project plans with the Engineering Project Manager (e.g. project budget, schedules, and Management of Change (MOC) requirements etc.)

-Provided Managerial Support throughout the project phases that include tendering, finalization of subcontracts, Logistics management of manpower and equipment, Operational Services and Construction and technical Support.

-Conducted Site visits for new tenders

-Audits the ongoing Project sites to ensure Compliance with Project QHSE requirements

-Audits Subcontractors for finalization of subcontracts.

-Actively Involves in Techno-Commercial negotiations

-Worked as Area Engineer during Oil & Gas Plants Maintenance Shutdown works

-Reviews and Approves Subcontractors Invoices

- Compiles Lesson Learnt Points and Conducts meeting to agree on mitigation plan and with action dates &actioner and ensures effective implementation from all involved parties

-Cost Management and Subcontracts Budgeting

Area Engineer

Qatar Engineering & Construction WLL.

Ras Laffan, Qatar

Aug 2012 – Dec 2012

-Led a team of 5 Supervisors for Mechanical and Piping works during QG plant Train-3 shutdown

-Arrange and manages all construction resources required for timely execution of shutdowns

-Coordinates with planners for sequential execution of Repairs and Recommendations (R&R) packages

-Coordinates with Specialized contractors (Hydro-jetting, Catalyst Handling, Chemical cleaning, N2-He leak testing) for execution of their respective works in sequence

-Reporting the daily progress and plans the forth coming activities with shutdown manager

-Ensured proper handover of work to counter shift team

-Attends daily stand-down meeting with client for Area work progress status

-Ensured all site activities are executed in compliance with Quality and Safety requirements

Workshop & Site Engineer

Alsa Engineering and Construction Co. LLC

Abu Dhabi, UAE

September 2010 - May 2012

-Responsible for preparing Isometric weld map drawings for fabrication works, Prepare Bill of Materials

-Calculate Inch-Dia and Inch-meter of scope Piping works

-Coordinates site team for possible site constraints related to erection and accordingly plans the fabrication.

-Prepares daily fabrication reports.

-Coordinates QC team for NDT of fabricated spools

-Quantify hydro-test tools, equipment and resources requirement and perform Hydro testing

-Preparing Spools transfer reports to painting yard

-Coordinates for the final inspection of furnished spools and arranges packing for delivery to site.

-Supervised Construction of Pipeline works as per Alignment sheets and IFC drawings

-Ensured work is progressing in accordance with project specification and HSE requirements.

-Ensured Progress is in accordance with project base line schedule.

Trainee Engineer

Associate Engineering

Hyderabad, India

August 2009 - June 2012

-Worked as a trainee engineer for execution of project on fabrication of pressure vessel, NDT and hydrotesting

-Coordinating with subcontractor for their respective scope of work

-Ensuring fabrication is in accordance with engineering drawings and quality standards

-Compiling the testing and painting reports

-Daily progress reporting to Project Manager

EDUCATION

Bachelor of Engineering

Osmania University

Hyderabad, India 2009

-Completed 4 years (2005-2009) bachelor’s degree in mechanical engineering in first division

-Accomplished successfully final year project on Fabrication, NDT and Hydro-testing of Pressure vessel from Associate Engineering Services.

Additional Trainings and Courses:

-Piping Engineering with Manual Drafting from IPEBS in according with ASME B31.3 (Nov 2009- Jan 2010), Hyderabad

-Quality Control in Piping Engineering from MS Institute of Engineering (Nov 2012 – Dec 2012), Hyderabad

SKILLS

-Contracts Administration, Subcontracts Management

-Construction Management, Project Management, Logistics Management

-Budget forecasting and Cost management

-Project Coordination, Planning Resources, manpower control

-Innovative, Cost Conscious

-Good Communicator, Team Player

-Efficient Microsoft Office Tools user

Personal Information:

Father’s name : Syed Sultan Mohiuddin

Date of birth : 02-10-1987

Place of birth : Hyderabad, India

Religion/ doctrine : Islam/Sunni

Marital Status : Married

Nationality : Indian

Languages : English, Hindi, Urdu, Arabic (Beginner)

Passport No. : P3452554

Expiry Date : 10-April-2027

Driving License : UAE & Oman



Contact this candidate