Profile

Over a wide and varied career in general engineering I have had success as a Resident Technical Officer in Singapore, Site Engineer and Survey Engineer on a number of major projects in the Middle East and the Philippines. This diversity has led to a detailed knowledge of all aspects of construction of buildings, extra high voltage substations, roads & bridges, tunnelling, underground oil storage (Caverns), pipelines, marine & earthworks, dredging & reclamation, Airport Taxiways & Runway. Computer literate knowledge in Auto Cad and Terra model Surveying Software.

Education and Professional Qualifications

Registered Civil Engineer (Philippines Professional Regulation Commission Reg # 98957)

Occupational Safety and Health Administration # 001377213

Institute of Engineers Singapore, Resident Technical Officer Registration #. 5828

Tunnelling & Underground Construction Society (Singapore) Membership #. 1507

Key Achievements

Sep 15 – Oct.20 Resident Technical Officer

WSP Consultancy Pte Ltd

Changi Airport Runway 3 Ext. Project, Phase-1&2

Singapore

May 12 - Aug 15 Resident Technical Officer

Parsons Brinckerhoff Pte Ltd

Jurong Rock Cavern Project Phase-1

Singapore

Oct 07 – Dec 11 Site Engineer

Abu Dhabi Ports Company

Khalifa Port & Industrial Zone Project

(Abu Dhabi, UAE)

Apr 06 – Sep 07 Senior Survey Engineer, Cowi A/S Consulting Engineer's Lusail Dev't. Project, Marine and Earthworks (Doha, Qatar)

May 04 – Mar 06 Civil Inspector, Hyder Consulting Middle east Limited Qatar Museum of Islamic Art Project (Doha, Qatar)

Mar 94 – Mar 03 Supervisor, ABV Rock Group KB, Site 5, (Jeddah, KSA) SSSP/Aramco Project (Caverns for Underground Oil Storage)

Mar 91 – Mar 94 Surveyor, ABV Rock Group KB., Site 5, (Jeddah, KSA.) SSSP / Aramco Project (Caverns for Underground Oil Storage)

Aug.87 – Feb 91 Site Engineer / Surveyor, Asian Construction Development Corporation (ASIAKONSTRUKT, Philippines) Clarion Electronic and Sansei Electric Factory Project., Kalayaan 500 KV EHV Substation Project., Philippine Trade & Training Centre Building Project.

May 84 – May 86 Surveyor

National Steel Corporation (Philippines)

Special Project Group

Detailed Summary

Resident Technical Officer – WSP Consultancy Pte Ltd, Singapore

Proposed Development of Changi East to Effect 3 Runway Operations (Package1 & 2):

-Full time supervision, Inspection and monitoring of daily activities on site.

-Assist and take instructions/directions from QP (supervision) or its assignee in carrying out supervision works on site.

-Supervise and keep records of day works.

-Attend site/ co-ordination meetings.

-Carry out other duties as directed by the QP(Supervision) or his representative.

-Sign and endorse as the responsible person for the works under my care/supervision.

-Ensure that the contractors carried out the work as per Specification and Approved drawings in a safe manner.

-Piling Works: Inspection & Monitoring in RC Pile Driving and Bored Piling.

-Civil Works: Inspection & Monitoring of Ancilliary Buildings, Main Drainage & Box culvert construction.

-Pavement Works: Inspection & Monitoring in Construction of Runway and Taxiways (Flexible Pavement & Rigid Pavement).

-Testing Works: Witness & Monitoring of concrete, HMAC, GGAB & CTB trial mix. Including material sampling and testing as per contract requirement.

Resident Technical Officer – Parsons Brinckerhoff Pte Ltd., Singapore

Jurong Rock Cavern Project Phase 1:

-Full time supervision, Inspection and monitoring of daily activities on site.

-Assist and take instructions/directions from QP (supervision) or its assignee in carrying out supervision works on site.

-Supervise and keep records of day works.

-Attend site/ co-ordination meetings.

-Carry out other duties as directed by the QP(Supervision) or his representative.

-Sign and endorse as the responsible person for the works under my care/supervision.

-Ensure that the contractors carried out the work as Specification and approved drawings in a safe manner.

-Tunneling Works: Monitor and witness long investigation (Deep Investigation) works, short investigation (Probe Hole) cored drilling works to confirm local geological and hydrological condition ahead of the face of tunnel, pattern blast hole drilling, charging, blasting, mucking out, scaling (mechanical and manual), survey and mapping works.

-Rock Support Works:

-Rock bolting: Monitor and witness rock bolt hole drilling (spacing and depth) rock bolt installation and its grouting method by either wet and dry.

-Shotcreting: Testing of slump and temperature of every batch of shotcrete and its application as to specified thickness requirements.

-Grouting Works: Monitor and check pattern drilling and grouting on face of tunnel as per result of deep investigation and probe hole drilling depending on water flow rate and pressure (water ingress criteria)

-Testing Works: Conducts / recommend tests at specified frequencies; for rock bolts (pull out test), for shotcrete, compressive strength test from cubes taken and rebound test on applied shotcrete.

-Civil Works: Supervise in Construction of Temperature Controlled Reinforce Concrete Plug in Caverns and Water Gallery, Instrument Shelter Building, Substation Building, Concrete paving and Pipe Rack foundation.

-Steel Works: Supervise in Structural Steel Assembly, Erection, including Welding and painting inspection for Pipe guiding frame at Shaft and Pipe Rack underground.

Site Engineer – Abu Dhabi Ports Company

Khalifa Ports & Industrial Zone Project:

-Supervision & Monitoring in the construction of Khalifa Port and Industrial Zone Project, responsible for in survey works including Topographic and Bathymetric survey, dredging & reclamation during site development.

-Supervise and verify all Breakwater and Revetment works in addition to the Landfill of Causeways.

-Inspection & monitoring during Construction of Main Berth and Temporary Contractors Jetty.

-Inspection & monitoring during Construction of Roads, Highway Bridges & Trestle Bridge.

-Inspection & monitoring during Construction of Warehouses, Terminal Buildings & Container Terminal.

-Ensured all Work was in accordance with Quality Assurance procedures as defined in the Project Quality Plans.

-Review and comment on contractor’s Method Statements and drawing submittals.

-Liaise with the Resident Engineer to ensure that contractor’s submittals/letters relevant to dredging, reclamation and marine works are answered within the target timetable.

-Review Quantity Survey report and monthly invoice.

-Ensure that the WHSE policy strictly implemented on site.

Senior Survey Engineer (Cowi A/S Consulting Engineer's)

Lusail Site Development & Marine Works Project:

-As a member of the Project Supervision team in the construction of Lusail Site Development and Marine works, I was responsible for monitoring & Inspection of all survey works of the project including topographic and bathymetric surveys.

-Review and comment on contractor’s Method Statements and drawing submittals.

-Ensured all Works was in accordance with Quality Assurance procedures as defined in the Project Quality Plans.

-Supervise and verify Revetment and Quay wall construction including reclamation works.

-Assumes direct “on-site” responsibility for verification/certification of all Quality test and as-built survey.

-Download and plots in Auto cad all data collected using GPS-RTK such as: as-built of setting out, Reclamation, Excavation and Dredging.

-Review Quantity Survey report and monthly invoice.

-Ensure that the WHSE policy strictly implemented on site.

Civil Inspector (Hyder Consulting Middle East Limited)

Qatar Museum of Islamic Art Project:

-Inspection & Supervision during construction of Qatar Museum of Islamic Art project to Ensure the work was done as per Project Quality Plan.

-Supervision & Inspection in Erection of Atrium Steel Structure.

-Checking of rebars, formworks alignment and elevation prior for concreting.

-Check and verify installation of Rock Revetment, Seawall units, Revetment Slab and Toe Blocks on marine works.

-Check and Recommends testing on rock grading and reclamation compaction as per specified frequency.

-Assumes direct “on-site” responsibility for verification/certification of all Quality testing and as-built survey.

-Ensure that the WHSE policy strictly implemented on site.

Supervisor (ABV Rock Group KB Site-5, Jeddah, K.S.A.)

Saudi Strategic Storage Program Project:

-Updating daily blasting progress.

-Provide coordinates and elevation of all rock bolt locations, blasting holes, Cavern ribs bolt, drainage strips, kicker plate for cavern lining.

-Prepare tunnel cross section and volume calculation using Geosecma Surveying software

-Supervise in road construction and earthworks underground.

-Supervise the Subcontractor in laying of Supply pipeline and Distribution pipeline from site to Jeddah Refinery.

-Updating pipeline daily accomplishment in ‘as-built’ drawings, including pipe bends, pipe weld ID, cathodic protection location & all utilities crossing pipeline by auto cad.

-Supervised in construction of Substation Building, Pump rooms, Firewalls and pipe sleepers underground.

Surveyor (ABV Rock Group KB Site – 5, Jeddah, K.S.A.)

Saudi Strategic Storage Program Project:

-Execute all types of surveying works particularly tunnelling, roads, and pipeline survey. Handled and operated all variety of surveying instruments and equipments, i.e. GPS, total station, level, etc.

-Supervised the team in the work execution.

-Established vertical and horizontal control. Calculates and prepares setting-out sketches for excavation works, steel lining and concrete works.

-Setting out of rock bolt location, blasting hole, drainage strip, ribs bolt.

-Setting out of all equipment foundation in underground power generation area.

-Alignment of raise boring machine and monitoring.

-Setting out of utility corridor and provide elevation for excavation.

-Check ‘as built’ all buried utilities prior for backfilling such as high voltage and low voltage cable, telecom cable, fibre optic cable, potable water pipe, firewater pipe, irrigation water pipe, sewage pipe.

-Setting out of all cable and pipe duct on road crossings.

-Setting out of all equipment foundation, electrical substation inside Jeddah Refinery pumping station and North Jeddah Bulk Plant distribution station.

Site Engineer / Surveyor (ASIAKONSTRUKT, Philippines, Various Project)

-Supervised the construction of two factory buildings, including building lay-out, site development, rebar works, formworks, and concreting works.

-Ensure everything is on schedule and in accordance with the plans and specifications.

-Prepare daily and weekly accomplishment reports

-Assist in preparing monthly progress report and weekly schedule

-Initiates change order procedures in case of plan revisions.

-Execute all types of survey works, relocation of property lines, topographic survey, setting-out of tower foundation and equipment foundation, underground cable tray, anchor bolt setting, tower alignment etc., and established vertical and horizontal control.

-Prepare survey plans, and data’s, which include the computation of volumes for, cut and fill areas.

Surveyor (NATIONAL STEEL CORP. Iligan City, Philippines)

-Check and verify contractor’s setting out of Piles in the construction of finger pier and warfs.

-Check and verify contractor’s setting out of building foundation, anchor bolt setting for machineries foundation.

-Setting out of shoreline protection in the plant reclamation area.

-Executes profile levelling, topographic and hydrographic surveys.

-Levelling and align machineries during maintenance and repair.

Training & Seminar

* Understanding Formwork - November 21, 2018

And Supervision Training Star Academy, Singapore

* Engineering Safety in Building - November 14, 2018

And Structures Training Star Academy, Singapore

* Challenges in the Design and - April 6-7, 2017

Construction of Tunnels & (By GeoSS / SRMEG / TUCSS, Singapore)

Underground Structures

* Safety Management Training - Mar. 07,2017

For Aerodrome operator Changi Airport Group, Singapore

* Safety in Deep Excavation - Nov. 23, 2016

Star Academy Pte Ltd, Singapore

* Supervision of Piling Works - Nov. 14-15, 2016

Star Academy Pte Ltd, Singapore

* Building Construction - Nov. 6-27, 2016

Supervisors Safety Ever Safe Consultants Pte Ltd, Singapore

Course

* Aerodrome Operation Safety - May 27, 2016

Training Changi Airport Group, Singapore

* Airside Safety Induction Briefing - May 27,2016

Changi Airport Group, Singapore

* Safety in Precast Construction - Feb. 19,2016

Star Academy Pte Ltd, Singapore

* Non-Destructive Testing - Feb.15-16,2016

Of Concrete Star Academy Pte Ltd, Singapore

* Work at Height Course For - Oct. 10, 2014

Site Supervisors Parsons Brinckerhoff Pte Ltd, Singapore

* Building Control Regulation For - May 21, 2014

Site Supervisors BCA Academy, Singapore

* WSQ Apply Workplace Safety and - Feb. 28, 2014

Health in Process Plant Avanta Global Pte. Ltd, Singapore

* Quality Insitu Concrete -Jan. 16, 2014

Construction IES Academy, Singapore

* Safety Leadership Training - Nov. 12,19,26 & Dec. 17, 2008

International Bechtel Company Limited

Abu Dhabi, UAE

* KPIZ GIS Application Training - March 24, 2008

Environmental System research Institute INC.

Abu Dhabi, UAE

* Contract Formation and - Nov. 19 – 20, 2007

Management Seminar International Bechtel Company Limited

Abu Dhabi, UAE

* OSHA Construction Health - Apr. 26, May 24, June 7, 2007

And Safety Course Parsons International Limited

Doha, State of Qatar

* Work Permit Receiver Course - Jan. 19, 2003, Aramco Jeddah Refinery

Jeddah, Kingdom of Saudi Arabia

*Fundamentals of Supervision - Dec. 6-9, 1997, Riyadh Quality Institute.

Riyadh, Kingdom of Saudi Arabia

* Modern Surveying Methods - Oct. 19-21, 1996, Riyadh Quality Institute.

And Instruments Riyadh, Kingdom of Saudi Arabia

*Management By Results - Oct. 19-21, 1995, ABV Rock Group Site-5

Jeddah, Kingdom Saudi Arabia

*Auto CADD Basic Training Course - July 5-30, 1994, ABV Rock Group Site-5

Jeddah, Kingdom Saudi Arabia

*First Aid Training - July 4, 1993, ABV Rock Group Site-5

Jeddah, Kingdom of Saudi Arabia

*Fire Fighting and Safety training - March 16, 1991, ABV Rock Group Site-5

Jeddah, Kingdom of Saudi Arabia