Experience in Brief
Electrical Project Engineer with extensive 11 years’ experience in Construction, Testing & Commissioning of Oil and Gas Sector.
Approvals from Kuwait Oil Company
Approved as Electrical Engineer for KOC Project “Fuel Gas Tie Ins to Feed 42” HP Lean Gas Lines to MF/X and MF/SH-01”
Approved as Electrical Engineer for KOC Project “New Tanks Along with Associated Facilities at GC 17
& APS.
Approved as Electrical Engineer for KOC Project “Construction of West Kuwait Mega Complex”.
Approved as Electrical Engineer for KOC Project “Electrical Work for Integrated Security System & C3 Building.”
Approved as Electrical Engineer for KOC Project “Construction of Core Store & Laboratory # 3”.
Approved as Electrical Engineer for KOC Project “Improvement and Modification of Power and Distribution System at GC 23”.
Knowledge Domain
Conversant with KOC, KNPC, IEC, IEEE, NFPA, API Standards
Equipment Installation & Testing and Commissioning – Transformers, RMU, MCC, UPS, Battery Chargers, Lightening Protection System, Capacitor Banks, PDB, LDB, Light Fittings etc.
HV & LV Switchgears, Cables, Compressors, Pumps, Induction Motor, EOT Cranes etc.
Earthing of Substation, Equipment’s, Panels and Structure.
12.5 MVA and 1 MVA Emergency Diesel Generator.
Key Result Areas:
Leading project team and participate in overall Planning, Scheduling and Execution.
Study of all types of drawing, technical specification and BOQ.
Preparation of Cost estimate and Tendering for all Electrical works.
Attend meeting with clients for negotiation and work finalization.
Preparation of BOQ for Material Planning.
Selection and ordering of materials required for execution of project.
Coordinating with the Client and Vendors for material approval.
Coordinate with client to resolve field construction queries interfacing with engineering
Responsible for monitoring execution of work as per the Drawing, Specification and Work Method Statement
Maintain Quality at site.
Following up with the Consultant to process shop drawings promptly to avoid delays in the scheduling and delivery of the various construction materials.
Monitoring daily work progress and giving targets to complete the work within budgeted time and cost.
To carry out weekly meeting with sub-contractor for setting up the target and goals.
Checking of sub contractor’s invoices.
Project Documentation.
Academic Qualification
Bachelor of Electrical Engineering from Aligarh Muslim University, India in 2010.
Diploma in Electrical Engineering from Aligarh Muslim University, India in 2006. Engineering Society Membership
Member of Kuwait Society of Engineers.
Work Experience
S. No Company Designation Country From To
1 Qainan General
Contracting Co.
Sr. Electrical Project
Engineer
Kuwait January 2018 Present
2 Gulf Energy Company Electrical Project
Engineer
Kuwait September 2016 December 2017
3 O&G Engineering Co.
W.L. L
Electrical Engineer Kuwait March 2012 August 2016
4 Vista Construction
Work
Electrical Engineer INDIA August 2010 February 2012 Projects Executed
1. Fuel Gas Tie Ins to Feed 42 Inch HP Lean Gas Lines to MF/X and MF/SH-01. Location- BS 180 & Shuaiba.
Client- GPM KOC
Description of Work:
Installation, Testing and Commissioning of 440 V Flame Proof PDB, LDB Junction Box, MOV Actuators, Isolators, Socket Outlets etc.
Installation, Testing and Commissioning of Lighting, Earthing & Cathodic Protection System.
Power & Control Cables Laying, Cable Tray Installation and Glanding and Termination etc. 2. New Tanks Along with Associated Facilities at GC 17 & APS. Location- GC 17 & Abdalliyah Pump Station
Client- PMWK KOC
Description of Work:
Installation, Testing and Commissioning of 440 V Flame Proof PDB, LDB, Junction Box, Isolators, Socket Outlets etc.
Installation, Testing and Commissioning of Lighting, Earthing & Cathodic Protection System.
Power & Control Cables Laying, Cable Tray Installation and Glanding and Termination etc. 3. Sabah Al Ahmed City Housing Project.
Location- Sabah Al Ahmed City
Client- Public Authority of Housing Welfare
Description of Work:
Installation, Testing and Commissioning of two nos. Low Tension Panel, two nos. 400 KVAR Power Factor Capacitor Bank, two nos.1600 KVA Generator and two nos. 450 KVA Generator. two nos. 2500 A ATS and 600A two nos. ATS.
Installation of MSB, SMSB and DBs.
Power & Control Cables Laying, Cable Tray Installation and Glanding and Termination etc. 4. New Booster Station BS-171 at West Kuwait.
Location-West Kuwait
Client- KOC
Description of Work:
Power & Control Cable Laying of different sizes. (around 240,000 KM)
Cable Tray Installation of various sizes. (around 10 KM) 5. Construction of Core Store and Laboratory No 3. Location- Ahmadi
Client- CP3 KOC
Description of Work:
Installation, Testing and Commissioning of 1250 KVA Transformer,12KV RMU,440 V MLTP, UPS, Battery Charger etc.
Installation, Testing and Commissioning of Lighting, Power, Earthing and Lightening Protection System. Power & Control Cables Laying, Cable Tray Installation and Glanding and Termination etc. 6. Electrical Work for Integrated Security System & C3 Building. Location- STF Ahmadi
Client- PMWK KOC
Description of Work:
Installation, Testing and Commissioning of 650 KVA Transformer,11KV RMU, 6 Nos. 60 KVA, 1 No 635 KVA Diesel Genset, 1 No. 1000 A and 12 Nos each 250 and 100 A ATS.
Installation of 70 Nos. DBs for power supply to Cameras.
Power & Control Cables Laying around 14 KM & Cable Tray Installation and Glanding and Termination etc.
7. New 72 MW Main Bulk in take Substation at Sabriya ‘B’ and Rawdhatain ‘D’. Location- North Kuwait
Client- PMNK KOC
Description of Work:
Installation, Testing and Commissioning of 11 KV Switchgear,1 MVA Transformer, 440 V Switchboards, Power & Lighting DBs etc.
Installation of Light Fittings, Cables, Power Sockets, Cable Tray and Trunking.
Installation, Testing and Commissioning of Lightening & Earthing Protection System. 8. Improvement and Modification of Power and Distribution System at GC 23. Location- North Kuwait
Client- PMNK KOC
Description of Work:
Installation, Testing and Commissioning of 12.5 MVA,1 MVA DG. 2 Nos. 440 V Switchboard, 4 MW and 400 KW Load Bank.
Installation of Light Fittings, Power Sockets, Cable Tray and Trunking.
Installation, Testing and Commissioning of Lightening & Earthing Protection System.
Power & Control Cable Laying.
9. Construction of Work Shop
Location- Barauni, India
Client-IOCL
Description of Work:
Installation, Testing and Commissioning of Light Fittings, Power Sockets, Cable Tray and Trunking.
Power & Control Cable Laying, Conduit and Cable Tray Installation.
Installation, Testing and Commissioning of Earthing Protection System.
Personal Dossier
Nationality: Indian
Date of Birth: 01/10/1988
Language Known: English, Hindi
Marital Status: Married
Passport Details: U0746847
Driving License Details: Valid Kuwait Driving License Number of Dependents: 2
Declaration
I hereby declare that the details mentioned above in my resume are correct to the best of my knowledge and belief. I bear the responsibility of any error or mistake in the data if occur in the future. Place: Signature
Date: