Post Job Free

Resume

Sign in

Electrical Supervisor Mysore

Location:
Mysore, Karnataka, India
Posted:
June 30, 2021

Contact this candidate

Resume:

SUNIL KUMAR

Mobil no:876-***-****, adnf4z@r.postjobfree.com

CAREER OBJECTIVE

To continuously learn and utilize the knowledge for the growth of self and the organization. Worked in Amazon under Sabari as Electrical Supervisor (July 2018 to May 2020) Responsibilities:

Responsible for provide on the job training as per plan for technician safety, EHS guideline, assign work and motivate to Electrician and Indent and inventory management.

Oversee the operational status of Heating, Ventilating air conditioning, water, Electric Room, UPS and other system to ensure efficient operation.

Responsible for various type of UPS maintenance of 500KVA(2Nos),175 KVA (2Nos),160 KVA(1Nos),120KVA (1 Nos,60 KVA(1Nos) rating for work station, IDF, MDF, Emergency lights.

Responsible OF SERVER ROOM, Router OS installation, checking power connection of POE, switch, Mux, Router installation, converter connection from Antenna, Alignment of antenna take help of blacken team support, Replacing& Routing patch Cord, RJ 45 connector IDF, MDF, Emergency lights.

Antenna maintenance their rectification, port testing. DCDB power tapping, MCCB labeling

Responsible for maintenance HVAC system worked in chiller, AHU (21 Nos), PAC (6 Nos), motor capacity 5 H.P. Temperature maintains in work station (22 C to 25 C), Temperature maintains in IDF & MDF (19 C to 21 C), high rating of MCCB, MCB, ACB, DG maintenance of 2000 KVA and do daily routine check and PM works, maintenance like fire indicator, fire panel, lighting, switch and sockets.

Responsible for UPS reading, KWH, Temperature reading of UPS, IDF, MDF &AHU room, WTP, STP and calculate power consumption and maintenance of Electrical Panel like Rising Mains, Popup box. Main incomer etc.

Ensure BMS system, SCADA & PLC monitoring system function are check for issue and follow up for closure of same.

Track the energy consumption on daily basis & observe the deviation and check report.

The carry out walkthrough of all the technical areas on random basis to check issues.

Check for status of equipment’s under break down condition & fallow up closure of same.

Ensure critical spare parts for Equipment’s are available – List to shared and fallow up for closure of all pending issues and abnormalities.

Coordinate for additional project – Sop small project testing and commissioning manpower planning, Coordinating with various contractor for project completion. Taking round of facility regularly to identify issue in Engineering and initiating immediate rectification action.

Be well versed with predictive maintenance activities like thermography.

Ensure technician fallow call when performing routine activities.

Analyze and preparing the documents such as check list of electrical room, Electrical DB, UPS room daily and weekly check list.

Worked is Schneider Electric under Teamlease as Associate Test Engineer (Oct2015-July 2018)

Responsibilities:

Directly Report to Test Manager

Responsible for UPS testing by Automatic & Manual Test in 3-phase Lab. There are following testing to do:

(a)Physically Inspection. (b) Hi Pot Test. (c) RS 232 Communication test.

(d) Low load Test (e) Auxiliary Power test (f) PFC performance test (g) Load transfer test

(h) Non-Linear Test (i) Overload Capacity test (j) Short Circuit test (k) Burin test Measuring value Harmonic to input and output side, Input and Output Voltage & Current, Crest factor, Observe spike and other distortion.

Since I am worked in 3 phase labs using of High rating of MCCB, ACB

Familiar of using ScopeCorder DL850V, CT.

Responsible for start-up, troubleshooting, preventive maintenance of electrical equipment.

Responsible for daily and monthly preventive maintenance of Labs, Battery bank and Load bank.

Responsible and fallow the Electrical safety rule SE425, LOCK OUT AND TAG, PPE.

Responsible for preparation of Testing document as per ISO standard with knowledge in 5S etc

Responsible for analyzing, diagnosing, troubleshooting test fixture related problems.

Experience in handling and testing of Hi-power rating UPS ranging from 20 KVA to 500KVA Worked in Smartedge Automation as PLC programmer (March 2014 to April 2015)

. RESPONSIBITIES:

Hands-on Experience for Panel Layout & Schematics and selection of PLC, HMI, push button, Relay etc.

Prepare Electrical Control Panel drawings with respect to specification & customer requirement Such as Control Schematic, Relay diagram, Panel Layout, terminal layout, Power layout etc. Worked in Quantum Aeon as Service Engineer (Oct 2011- Jan2014) RESPONSIBITIES:

Ensured Electronic Ticket machine functionality through Repairing.

Trouble Shooting Knowledge to Solve complex problem EDUCATION:

BACHELOR OF ENGINEERING in (Electronic & Telecommunication) from DR BABASAHED AMBEDKAR MARATHWADA UNIVERSITY -2010.

CERTIFICATION COURSE:

To continuously learn and utilize the knowledge for the growth of self and the organization.

AUTOCAD IN ELECTRICAL from CAD POINT INSTITUTE & DEVELOPMENT RAMASWAMY CIRCLE MYSORE

Post Graduate Diploma in Industrial Automation (PGDIA) Course (3 Months) from. Prolific Systems Technologies Pvt. Ltd., Bangalore which is recognized by National Skill Development Corp – Govt of India.

PLC’s: Allen Bradley (MicroLogix, SLC 500 Series), Siemens (S7-200&S7-300) SCADA: Wonder ware (In touch version 9.5), Siemens (Win CC) Drives : Siemens (Micromaster 440) DCS: ABB AC 800F COMPUTER SKILL

C - Programming, ladder diagram, VLSI Verilog, plc programming PERSONAL DETAIL ADDRESS

FATHER NAME: JAGAT PRAKASH #20 LEO JANANI

DATE OF BIRTH: 13 APRIL 1988 LAKSHMIKANTHAN NAGAR HEBBAL 2ND PASSPORT NO: R127170 MYSORE- 570016

Date : Yours sincerely

Place : Mysore SUNIL KUMAR



Contact this candidate