Post Job Free

Resume

Sign in

Electrical Power Engineer

Location:
Dubai, United Arab Emirates
Salary:
15000
Posted:
June 27, 2021

Contact this candidate

Resume:

AMR HOSNY ABDELHAMEED ABDELHAMEED

Address: Talha Ibn Obayd Allah St, Al Fayhaa, Riyadh-KSA

Mobile: +966*********, +966*********&+201********* E-mail: adnea6@r.postjobfree.com

Nationality: Egyptian. Birthday: NOVEMBER, 29th, 1988 Objective :

To obtain a suitable position within the functional structure where I can apply my experience, education and skills.

Education

• University: HELWAN

• Degree: B.Sc., Degree in Electrical Power & Machines Engineering,2011

• Grade: GOOD

• Graduation Project: Electrical distribution in HOSPITAL BUILDING.

• Project grade: Excellent.

Employment History:

Electrical Engineer at (Al Babtain C.C) ABC from 2014 Till Now.

Protection Design Engineer at BCG from 2012 Till 2014.

Al Babtain Company Projects Link: - http://www.albabtain-contracting.com/projects/ Performing technical electrical design for control, protection and metering System of high voltage and medium voltage substations in Saudi Arabia based on the signed contract.

Scope of Work: AS Electrical Engineer

Project (01) 2014

Project Name: - (WADI AL-DAWASSER (9701) S/S 380/132/13.8KV) Saudi Arabia - COA (Central Operational Area)

Position: - Electrical Site Engineer

Site Responsibility:

1) Reinforcement Earthing, Equipment Earthing & Main Grid Erection in Substation. 2) Duct Bank, Communcation Duct Bank & PVC Piping Erection in Substation. 3) Outdoor Lighting Pole & Lighting cum Lightning Mast Erection in Substation. Project (02) 2015

Project Name: - (DHAHRAN AL-MARKAZ) S/S

Saudi Arabia - EOA (Eastern Operational Area)

Position: - Electrical Site Engineer

Site Responsibility:

* Laying for 2000mm2 of 115kv underground cables 2 circuits from DHAHRAN SOUTH 380/115KV BSP to AL MARKAZ 115/13.8KV Substation.

* Supervision on all testing stages (Electrical Test & HV Test) after Cable pulling finish. Project (03) 2016 - 2018

Project Name: - (IRQAA) S/S (9034 BSP)

Saudi Arabia - COA (Central Operational Area)

Position: - Electrical Site Manager

Site Responsibility:

* Supervision for all electric activities in site (Erection, fabrication & Coordination with all activity)

*Make all installations in site & Supervision on Subcontractors. Remote End Work: -

* 9034 S/S TO 9005 A&B Install new PSE Panels but make modification in the protection panels.

* 9034 S/S TO 9035 A&B Install new PSE Panels but make modification in the protection panels.

* 9034 S/S TO 9004 Install new PSE Panels but make modification in the protection panels.

* 9034 S/S TO 9002 Install new PSE Panels but make modification in the protection panel Project (04) 2018 - 2020

Project Name: - Replacement of Existing 132kv DC OHL 8015-8104 by 1200mm2 XLPE U/G cable circuits and Diversions of existing U/G cable circuit 8015-8049A at N.G area Saudi Arabia - COA (Central Operational Area)

Position: - Electrical Site Manager

Site Responsibility:

* Supervision on all electric activities in site (Cable Pulling, Jointing, Termination, Erection, fabrication, Coordination between all drawings, Electrical Test & HV Test)

*Make all installations in site & Supervision on Subcontractors

*Check with Consultancy and make (RFI & MIR for materials)

Scope of Work: AS Protection Design Engineer

Full Electrical Base and Detail Design for substations.

Prepare Single Line Diagram.

Prepare Protection Single Line Diagram & Relaying and Metering One Line

Prepare Scada Function Diagram.

Panel Modifications (Changing relays, Analog & Digital signals wiring).

Review and revise Manufacturer (ABB, Siemens etc.) Base Design.

Reviewing Manufacturer Offers & Project PTS (Project Technical Specification)

Prepare total substation Point List (Alarm, Fault Recorder, SOE and SCADA Point List).

Full Substation Cable Schedules and Final Termination.

Preparing CT& VT sizing & Protection Relays Calculations & Cable Sizing Project (05)

Project Name: Supply and Installation Automatic meter reading system (AMRS) for high substations

Project Location: Saudi Arabia, Contractor: AUVA

Scope of work and technical specifications:

Work in the field of protection and metering devices at high voltage substations (calculations- drawings-designs),

Installation (AMRS) for (301) substations in various parts of Saudi Arabia (Eastern area & central area)

Eastern area:(Dammam PP, Qatif BSP, Sanyayah BSP, Doumat Al Jandal, Al mazawy, Ain najm, Ain Dar, Abqiq central 49, Shadgam pp,19 BD, Al hassa sang, ashyaay, Rc 45 BC, AL jishah, al masuodi, wasia, khopar BSP, Lisafah, New Rahema. Central area: (8606,8904,8919,8802,8812,8760,8809,8811,8814 Substations) Site Responsibility: Site visit to Substations to Collect data and Supervise Installation and Technical Problems.

Project (06)

Project Name: *Replacement and Protective Relays on 13.8KV SWGR at (TABUK S/S#2, 3, 4, 6)

Contractor: ABB Service.

Scope of work and technical specifications: Work in the field of protection and metering devices at high voltage substations (calculations drawings designs), Installation (O/C & EF Relay, Trip Circuit Supervision Relay and Under Frequency Relay) for (TABUK#2, 3, 4, 6) substations in Saudi Arabia (western area) Site Responsibility: *Site visit to Substations to Collect data and Supervise Installation and Technical Problems, Modified and Replacement the existing electromechanically relays to the numerical relays.

Project (07)

Project Name: Replacement and Protective Relays on 13.8KV SWGR at (AL ShuhadaS/S), Contractor: ABB Service.

Scope of work and technical specifications: Work in the field of protection and metering devices at high voltage substations (calculations drawings designs scada& annunciation point list AC & DC Calculation & Cable Sizing), RELAY SETTING. Site Responsibility: *Site visit to Substations to Collect data and Supervise Installation and Technical Problems.

Project (08)

Project Name: - (Shadeed Iron & Steel Plant in Oman) Sultanate Of Oman – Sohar, Contractor: ABB Service. Design Secondary Engineering for 33kv Installation (O/C & EF Relay, Transformer Differential) interfacing between new modification & other panels, CT & PT Calculation & Control cables. Project (09)

Project Name: - (8135 S/S)

Saudi Arabia - COA (Central Operational Area), Contractor: ABB Service. Modification, added new section including new power transformer & new 11 outgoing feeders make (Base design, CT&PT Calculation, cable schedule, interfacing between panels & Bill of Quantity of cables. Site Responsibility: *Site visit to Substations to Collect data and Supervise Installation and Technical Problems, Added the new extinction for Section –C & Transformer GT 3. Project (10)

Project Name: - (LPOF S/S)

Saudi Arabia - WOA (Western Operational Area), Contractor: ABB Service. Modification in 35 substations in (JEDDAH, MAKAH, MADINA) WAZIRYAH, JABAL AL NOUR, SHISHAH, KANDRA OLD, CITY, JARWEL SUBSTATIONS Modification in set (1&2) Protection Panels. And complete (Base design, CT&PT Calculations & Point List SCADA, ANNUNCIATION) & Detailed design: - interfacing between protection panel & other panels, cable schedule Site Responsibility: *Site visit to Substations to Collect data and Supervise Installation and Technical Problems.

Project (11)

Project Name: - (AL-SHATEA S/S)

Saudi Arabia - WOA (Western Operational Area), Contractor: AECC. New substation 110/13.8KV Complete operational SLD, Fault recorder Point list, CT/VT Calculation and Protection logic diagram, Interlocking Logic Diagram and remote end Base Design.

Remote End: - (JEDDAH NORTH WEST S/S)

Saudi Arabia - WOA (Western Operational Area)

Modification in Substation 380/110/13.8 KV in two lines Toward AL SHATEA S/S. Project (12)

Project Name: - (Thuwal Town S/S)

Saudi Arabia - WOA (Western Operational Area), Contractor: AECC. New substation 110/13.8KV Complete operational SLD, Fault recorder Point list, CT/VT Calculation and Protection logic, Interlocking Logic Diagram diagram and remote end Base Design.

Remote End: - (THUWAL BSP S/S)

Saudi Arabia - WOA (Western Operational Area)

Modification in Substation 380/110/13.8 KV in two lines Toward THUWAL TOWN. S/S. Site Responsibility: *Site visit to Substations to Collect data and Supervise Installation and Technical Problems & Added the two new protection panels for the two lines Toward Thuwal Town S/S.

Project (13)

Project Name: - (AL-SHARAIAI S/S)

Saudi Arabia - WOA (Western Operational Area), Contractor: AECC. New substation 110/13.8KV Complete operational SLD, Fault recorder Point list, CT/VT Calculation and Protection logic diagram, Interlocking Logic Diagram and remote end Base Design.

Remote End: - (WADI JALEEL S/S)

Saudi Arabia - WOA (Western Operational Area)

Modification in Substation 380/110/13.8 KV in two lines Toward AL-SHARAIAI S/S. Project (14) 2014

Project Name: - (Power Transformer replacement in 33-13.8kV S/S Musadiyah - Qarrah - Al Adarah and Hudaib)

Saudi Arabia - EOA (Eastern Operational Area), Contractor: TAQAAT. The Saudi Electricity Company requires up gradation / reinforcing the existing Substations AL MUSADDADIYAH, QARYAT, AL-ADARA and HUDAIB. Site Responsibility: *Site visit to Substations to Collect data and Supervise Installation and Technical Problems & Upgrade the rating for each transformer Language Skills:

• Native language Arabic.

• Good English

TRAINING

August 2008, Electronic Factory in Arab British Dynamics (ABD).

August 2009, Cairo South Power Station.

August 2009, Khaleda Petroleum Company in (field)

Summer training in Helwan University (2008).

August 2010. Rash Petco

SKILLS:

Computer Skills:

• Proficient user of MS Office applications, excellent knowledge of the Internet.

• Excellent in Micro station, Foxit reader, Acrobat reader.

• Professional knowledge with higher production in AUTOCAD 2D.

• Very Good knowledge of DIALUX LIGHTING Soft ware

• Printing out for SIEMENS Relays on DIGSI Software.

• Printing out for SEL Relays.

• Micro station Program.

COURSES

1. Electrical Distribution course

This course include electrical design for low voltage system, we made complete designs passing through all design procedures then making all the necessary design calculations then performing all the required drawings for approved & Implementation. We do all requirement design for the project:

a Lighting design. b Power design

c Light current design. d Medium voltage system design. 2. Successfully Completed the " AutoCAD 2D” course 3. Programmable logic controller (Siemens 300) at ITC institute 4. PMP Course

5. First Aid Course

6. Leader Ship and Effective Supervisory Skills Course. Personal Skills:

• Self-confidence, Self-motivated., Self-learning.

• Team work& ability to communicate with the team

• Problem solving and communication skills.

• Ready to travel.



Contact this candidate