WADE STOKER
**** ******* **. *, ******, CA ***** M: 559-***-****
**********@*****.***
SKILLS
Experienced plant and floor manager (ranging from three to 27 employees)
Shop machinery – Lathe and Mill
Electrical and Electronic assembly
Welding – MIG, TIG, Arc and Oxy-Acetylene
Laser Cutting
Plasma Cutting
25+ years of operating of multiple lift devices (scissor, forklift, extended lift)
20+ years using hand tools, including Dial Caliper and Micrometer
EXPERIENCE
PRODUCTION MANAGER, sage industrial – clovis, CA – 7/2018 to 4/2021
Functions including material planning for warehouse inventory control, shipping, receiving, and purchasing
Developed workflow policies and procedures that improved efficiency without compromising safety or quality
Ensured all safety and health standards are kept and organized accident-free
Ensured adequate scheduling of staff
Provided guidance to staff and prepared goals for each manufacturing team
Communicated regularly with upper management regarding all production issues
Evaluated machine resources to ensure that production continued with minimal downtime
Inventory management, scheduling, and material planning
UNION CARPENTER, Foley Company – Kansas City, MO – 6/2011 to 6/2015
Managed multiple teams of multiple trades
Organized teams to avoid production timing issues to meet and beat deadlines
Repaired massive water tanks to prevent leakage
Prevented new fractures from future critical leaks
CARPENTER, Strongform – Deer Creek, MI – 6/2009 to 6/2011
Symon and gang forming for concrete walls, up to 40 feet tall
Shoring for buildings of multiple floors/stories
Repaired massive water tanks to prevent leakage
Prevented new fractures from future critical leaks
Lift Director of cranes by sight or by radio
CARPENTER, Mulbauer enterprises – Vermillion, SD – 6/2008 to 6/2009
General contracting for commercial and residential
Siding, roofing, framing, windows, doors, and various other carpentry
Concrete work (interior and exterior)
SELF EMPLOYED CARPENTER/HANDY MAN – FRESNO, CA – 9/2004 TO 6/2008
Masonry including brick, block, and stone
Electrical installation and repair
Plumbing installation and repair
General carpentry
SKILLED CRAFTSMAN, arsi corporation – Santa Fe, CA – 5/2003 to 9/2004
Arc welding
Overhead crane operation
Skip loader operation
Front end loader operation
Lift operation (scissor, forklift, extended lift)
BRICKLAYER, McMcurley and day masonary – Fresno, CA – 6/2002 to 4/2003
Built Lowes in Clovis, CA in 90 days
Scaffolding assembly
Concrete pumping
Rebar installation
Masonry including brick, block, and stone
Lift operation (scissor, forklift, extended lift)
BRICKLAYER, madera masonary – Madera, CA – 7/1998 to 5/2002
Built Cesar E. Chavez National Monument in Keene, CA
Form and pour footings
Scaffolding assembly
Concrete pumping
Rebar installation
Masonry including brick, block, and stone
Lift operation (scissor, forklift, extended lift)
EDUCATION
INDUSTRIAL TECHNOLOGY, kings river community college
Graduated 11/8/1989
Student Body Council Representative
LOCAL 587 CARPENTER UNION
Attended multiple training certification classes to become proficient in all skills related to the carpentry trade
HIGH SCHOOL, sanger high school
Graduated