Post Job Free

Resume

Sign in

Electrical Engineer

Location:
Dubai, United Arab Emirates
Posted:
August 15, 2021

Contact this candidate

Resume:

John Martinez Calica

GF Room *, **st street Soufiq Building #12 Muraqqabat. Dubai UAE Mobile No.: +971-**-***-****/+971-**-***-****

E-mail Add: adn6z1@r.postjobfree.com / adn6z1@r.postjobfree.com

POSITION DESIRED: QA/QC ELECTRICAL ENGINEER

(With ADNOC Approval / Driving License – Manual)

CAREER OBJECTIVE: To be a part of a dynamic organization, particularly in a highly competitive

areas and responsibilities wherein I can utilize and enhance my experiences as well as my skills, hence to prove myself eligible/competent for the company and position. With more than 13 years of professional experience on Electrical Power and Instrumentation System both on Industrial and Commercial projects across GCC and home country.

WORK EXPERIENCES:

QA/QC Electrical & Instrumentation Inspector

China Petroleum & Engineering Construction Corporation

ADNOC GAS PROCESSING

Habshan 5 De-bottlenecking Project Al Dhafra Region, Abu Dhabi March 15, 2021 – July 29, 2021

Preliminary/Final inspection and approval of instrumentation works for equipment and installation together for any changes in location and prepares report for any deviation arising from the equipments. Issuing of Non- compliance reports (NCR) and Incident reports (IC) as per the conducted inspection and/or surveillance.

Conducts verification and inspection of instrumentation systems that includes Analyzers, Detectors, Flow Measuring Devices, Level Measuring Devices, Pressure Measuring Devices, Temperature Measuring Devices and Switches (Pressure, Limit Flow and Float operated)

Verify and review the Project Quality Plan, Project Execution Plan, Inspection & Test Plans, QA / QC Procedures, other Project Procedures and documents submitted by contractors Plan and conduct Quality Audits on contractors and subcontractors to ensure that the QA requirements are properly identified and implemented in the Project execution phase.

Responsible for monitoring work of Project Contractor / Subcontractors to ensure compliance with project- specific QA / QC requirements. Conducts Site visit and Inspection as per Request for Inspection (RFI). Ocular and routine surveillance of all electrical and instrumentation works on site for any quality deviation on material and workmanship. Performs review on material submittal and inspection to verify the compliance prior to installation on the project.

Review Owner’s Technical Specifications (OTS). Review and/or modify Method of Statement (MOS) and Inspection Test Plans (ITP) according to the International Standards (BS EN / IEC) and Local Authority regulation for final approval of Department Managers. Analyzes documents for any deviation against approved drawings, bill of quantities (BOQ) and Specifications.

QA/QC Electrical Engineer

China Energy Engineering Group -TEPC

Mohammed bin Rashid Al Maktoum Solar Park – Phase IV 950MW Hybrid Project

May 23, 2019 – January 25, 2021

Responsible for Inspection and approval of electrical materials and works on power systems HV, MV and LV (Cables, Switchgears, Bus Bar Systems, MDB, SMDB, FDB Transformers, Control Panels, VCD’s, Motors, Cable Management System and Earthing Systems). Responsibility includes ELV systems (Fire Alarm, Access System, CCTV, Data and Communication System)

Preliminary/Final inspection and approval of instrumentation works for equipment and installation together for any changes in location and prepares report for any deviation arising from the equipments. Issuing of Non- compliance reports (NCR) and Incident reports (IC) as per the conducted inspection and/or surveillance.

Conducts verification and inspection of instrumentation systems that includes Analyzers, Detectors, Flow Measuring Devices, Level Measuring Devices, Pressure Measuring Devices, Temperature Measuring Devices and Switches (Pressure, Limit Flow and Float operated)

Review Owner’s Technical Specifications (OTS). Review and/or modify Method of Statement (MOS) and Inspection Test Plans (ITP) according to the International Standards (BS EN / IEC) and Local Authority regulation for final approval of Department Managers. Analyzes documents for any deviation against approved drawings, bill of quantities (BOQ) and Specifications.

Verify and review the Project Quality Plan, Project Execution Plan, Inspection & Test Plans, QA / QC Procedures, other Project Procedures and documents submitted by contractors Plan and conduct Quality Audits on contractors and subcontractors to ensure that the QA requirements are properly identified and implemented in the Project execution phase.

Responsible for monitoring work of Project Contractor / Subcontractors to ensure compliance with project- specific QA / QC requirements. Conducts Site visit and Inspection as per Request for Inspection (RFI). Ocular and routine surveillance of all electrical and instrumentation works on site for any quality deviation on material and workmanship. Performs review on material submittal and inspection to verify the compliance prior to installation on the project.

QA/QC Electrical Engineer

Style Engineering Bureau Consultant – Design and Supervision

P.O. Box 676 – Abu Dhabi, United Arab Emirate

Email: adn6z1@r.postjobfree.com

Tel. No.: +971-*-***-****, Fax No.: +971-*-***-****

February 23, 2015 to March 16, 2019

Prepares tender documents for local authority approvals. Reviewing all technical submittals, shop drawings and other documentation presented by contractor before and during construction period for approval, re-submission or rejection of the said documents. Dealing with the client/authorities for technical queries, submittals and approvals regarding the projects concerned. Conducts quality inspection, approval / rejection for the works done by all project contractors according to approved plans, specification and other tender documents.

Responsible for Inspections and review of Electrical & Instrument Plans, Drawings and designs for proposed RFI according to installation or alterations to verify compliance with applicable Standards and Codes.

Review, inspect, approved/disapproved Electrical material and/or installation workmanship for Electrical as HV, MV ELV Systems (Cables, Switchgears, Bus Bar Systems, MDB, SMDB, FDB Transformers, Control Panels, VCD’s, Motors, Cable Management System, Earthing System, Fire Alarms, Access System, CCTV, Data and Communication System according to Project Specification, Bill of Quantities (BOQ), Tender documents, Issued for Construction (IFC) Drawings.

Review, inspect, approved/disapproved Electrical material and/or installation workmanship for Instrumentation system such as Analyzers (Liquid & Gas), Detectors (Gas, Combustion/Flame, Heat & Smoke), Flow Measuring Devices (Liquid & Gas), Level Measuring Devices, Pressure measuring Devices, Temperature Measuring Devices (Thermocouples & Infrared type), Switches (Pressure and Temperature Switches, Limit Switches, Flow Switches and Float Operated Switches)

Inspection of Instrumentation cables (approval/rejection) for armored and non-armored as per project specification and requirement such as Control cables, Heat detection .cables, Thermocouple cables and Fiber optic instrumentation cables.

Maintaining all test documents for internal quality audits in accordance with Quality Management System. Responsible for the verification of the installation of the Electrical & Instruments by performing inspections as per the Inspection and Test Plan (ITP) and Method of Statements (MOS) as approved.

Issuing and monitoring Incident reports (IC) and Non-compliance Reports (NCR) that arises in the project due to deviation and non-conformity from Owner Technical Specification (OTS) and according to local and international standards norms ranging from materials and workmanship of the installation on site.

Confirming that the Calibration of the instruments matches with the specifications in the Instrument Data Sheet. Accompanying the owner’s representative to carryout routine inspection and release hold points by signing and obtaining the client representative approval signature on the various Quality and Test record as proof of inspection confirming to specification

QA/QC Electrical Engineer

Abraji Holdings LCC Illoura Project, Riyadh Email: adn6z1@r.postjobfree.com Mobile: +966-***-***-***

October 2014 – January 2015

Responsible for Inspections of Electrical & Instrument Installation, Plans, Drawings and designs for proposed installation or alterations to verify compliance with applicable Standards and Codes. Preliminary inspection of instrument works together with Contractor’s Inspector for any changes in location and prepares punch list items. Daily site surveillance of instrument works which are in progress. Checking if construction is working according to Client’s specifications, details and drawings.

Verify via physical inspections, assessments, witness of Contractor and Subcontractor inspections / activities and by reviewing / initiating documented objective evidence that confirms the E & I installations are completed in accordance with approved IFC documents, Project Quality and Test Plans, industry best practices, work methods and quality documentation records are in place.

Receipt inspection of materials to ensure compliance with purchase order and specification requirements and ensure material has proper storage requirements identified, assist warehouse personnel in completion of OS&D damage reports, review and approval of documentation submitted from suppliers and subcontractors during receipt inspection activities.

Witnessed Visual & Dimensional, Functional Testing for Process control equipments (Panels, Instruments etc.), Electrical equipments (Switchgear, MCC, Lighting and Small power DBs etc.). Witnessed Visual & Dimensional, Functional Testing for Process control equipments (Panels, Instruments etc.), Electrical equipments (Switchgear, MCC, Lighting and Small power DBs etc.).

Ensure all work is correctly prepared prior to any inspection being undertaken and after inspection review all reports for compliance. Ensure that all inspection reports are accurate and that all attached documents are current status. Issue NCRs on identification of nonconformities and Monitor the effectiveness of Corrective actions.

QA/QC Electrical Engineer

Contracting and Construction Enterprises LTD. (CCE)

P.O. Box 250991, Riyadh 11391 Kingdom of Saudi Arabia

Tel. : (+966 11) 416 1122 / (+966 11) 464 2991

Fax : (+966 11) 416 1948

Email: adn6z1@r.postjobfree.com June 2010 – July 2014

Conducts Inspections of Electrical & Instrument Installation, Plans, Drawings and designs for proposed installation or alterations to verify compliance with applicable Standards and Codes. Carrying out inspection of materials to make sure it meets the requirements of project specifications. Ensuring that all installations have been carried out as per project’s specifications and standards.

Responsible for preparation of External RFI for the Final Inspection in site together with the Client Inspector. Ensuring that the non-conformities, inspection records and outstanding issues are checked for completeness and signed off to proceed to final inspection.

Coordinate with the Company representative as well as Contractor QC inspectors for the resolution of site problems and to ensure that communications exist and are maintained. Liaise between the Company and Contractor Engineering, Site construction & Pre-commissioning Teams (including Vendors) and provide assistance when requested.

Generate RFIs where required providing sufficient notice for Hold, Witness and other Inspection levels and Coordinate with client representatives to ensure that inspections are carried out accordingly. Ensures that Safety Policies and Procedures are applied diligently to all E & I works, including by other discipline.

Prepare / develop and review QA/QC procedures, ITPs etc. to sustain effective QA/QC system on the project and to assure adequate quality verifications are identified.

Monitor, check and sign-off E & I completion dossiers, Inspection & Test Records and check sheets for Pre- commissioning / Commissioning. Participate in Walk through and surveillance activities. Identify non- conformities, and ensure any corrections and any corrective actions are implemented and verification takes place.

Plant Engineer (Electrical)

Cargill Animal Nutrition Phils. (Maker of PURINA Chow Feeds) Cargill Villasis Plant

Villasis, Pangasinan, Philippines Tel. Number: +637*-***-****

CP Number: +639**-***-**** / +639**-***-****

(Under 4JQ Employment Sevices-Mob. No.: +639**-***-****)

June 2008 to January 2010

Responsible for Inspections of Electrical & Instrument Materials & Equipments for installation inside the plant. Issue Quality Alerts (QA) and Non-Compliance Reports (NCR) in case of any QA/QC observation during site audits. Perform and periodic construction quality analysis and conduct interviews to evaluate competency of contractor’s QC personnel.

Perform inspection and testing of all installation activities as per approved relevant ITP’s during all phases of project ensuring implementation & conformance to approved drawing & specifications and relevant industrial codes & standards

Material Receiving inspection of Electrical and Instrumentation System such as Cables, Switchgears, Bus Bar Systems, MDB, SMDB, FDB, Transformers, Control Panels, VCD’s, Motors, Cable Management System, Earthing System, Fire Alarms, Access System, CCTV, Data and Communication System, Analyzers (Liquid), Detectors (Gas, Combustion/Flame, Heat & Smoke), Flow Measuring Devices (Liquid & Gas), Level Measuring Devices, Pressure measuring Devices, Temperature Measuring Devices (Thermocouples & Infrared type), Switches (Pressure and Temperature Switches, Limit Switches, Flow Switches and Float Operated Switches).

Witnessing test of Circuit Breakers, such as CB Tripping by Thermal, Magnetic Trip and Timing Trip. Conducting Insulation resistance test of cables. Transformer testing & battery Bank charging & discharging Test. Conducting Fire alarm and Detection test inside office and production area.

.

Electrical Supervisor

ARKI Construction & Supply

Del Prado Village, Urdaneta City 2428 Pangasinan, Philippines

2000-2008

Planning, estimation and installation of electrical system on designated projects. Installation of wiring and electrical devices such as panel board, circuit control board and power supply and overcurrent protection devices following designated IFC drawings and standards for Villas and High Rise building projects.

PERSONAL DATA:

Age: 39

Civil Status: Married

Sex: Male

Citizenship: Filipino

Weight: 80 Kilos

Height: 5’4”

Religion: Christian

Blood Type: “B+”

Birth Date: May 15, 1981

In case of Emergency please contact:

Spouse: Maribel Saribay Calica Registered Nurse

Sultan Al Olama Medical Center – Al Barsha Branch. Dubai

Mobile No.: +971-**-***-****

Tel.: +971-*-***-****

EDUCATIONAL BACKGROUND:

Bachelor of Science in Electrical Engineering

Pangasinan State University-College of Engineering and Technology

San Vicente, Urdaneta City, Pangasinan 2428. Philippines Year Graduated: 2005

CHARACTER REFERENCE:

Engr. Rami Hassan Hashem Engr. Mohammad Salim Kadduora

Electrical Manager Projects Manager

Contracting and Construction Enterprises Ltd. Style Engineering Bureau

Mobile No.: +966-***-***-*** Mobile No.: +971-**-***-****/ Tel. No.: +971-*-***-****

Email: adn6z1@r.postjobfree.com Email: adn6z1@r.postjobfree.com

Engr. Pedro Mendonca Engr. Rajendran Thankappann

QA/QC PT Manager – Lloyd’s Register ADNOC Senior E&I Engineer

Mohammed bin Rashid Al Maktoum Solar Park Habshan 5 De-bottlenecking Project

Mobile No.: +971-**-***-**** Mobile No.: +971-**-***-****

Email: adn6z1@r.postjobfree.com Email: adn6z1@r.postjobfree.com

Skills and other qualifications: Driving and basic troubleshooting of computer hardware and software applications.

Knowledge on Microsoft office applications (word, excel, power point, outlook, access). AutoCad Operation. I certify that the above information is true and correct to the best of my knowledge and belief.

John Martinez Calica



Contact this candidate