Post Job Free

Resume

Sign in

Technical Assistant Control Room

Location:
Dubai, United Arab Emirates
Salary:
USD 8000/- PM
Posted:
August 05, 2021

Contact this candidate

Resume:

CV of Muhamed Ashraf pg. * of *

P.M. Muhamed Ashraf

Technical Office Manager

Mobile: +91-956******* (India)

Mobile: +971-**-******* (U.A.E)

Email: adn2av@r.postjobfree.com

Objective

To deliver any job assignment in max professional and accurate way by dedicating and utilizing my qualification and leadership skills. This will obviously ensure meeting or exceeding the satisfaction of my employer and respective clients as well as enhancing my aptitude to deal with any other upcoming challenges with ease and speed. Experience Summary:

Over 25 years’ experience in Electrical & ELV Services Designing, Project Management and MEP Services coordination in UAE, India and Kenya. Academic Qualifications:

B.S. Engineering Technology - Electrical

Birla Institute of Technology & Science, Pilani, India. Electrical Engineering : Diploma in Electrical Engineering from State Board of Technical Education, Govt. of Kerala

Higher Secondary : from University of Calicut, Kerala Computer Skills:

General Drafting Tools: AutoCAD, Naviswork (3D Model Review), Bluebeam and etc. Project planning Tools: MS Project.

Miscellaneous Tools: Microsoft Office Packages, and various design software. Recent Employment

Company Designation Term Duration

CKR Consulting Engineers,

Dubai. U. A.E

(U.A.E, India & Kenya)

Technical Office Manager/

PMC Team leader

Aug 2005 till date 15 years

WS Atkins (Abu Dhabi &

Dubai)

Electrical Design Engineer April 2000 – Jul 2005 5 years EMCO – Ascon ETA (Abu

Dhabi)

A&P Paraskevaides &

Partners LLC, Abu Dhabi

Electrical Engineer

Technical Assistant

June 1995 – March 2000

April 1994 – May 1995

5 years

1 year

CV of Muhamed Ashraf pg. 2 of 3

Key Responsibilities:

As Project Management Team Leader

Establishing Standard Operating Procedures for MEP projects.

Monitored and evaluated the quality of planning, design, and construction activities accomplished by Client, Project Management Consultant, Services consultants, vendors, and contractors.

Provided direction and leadership to assigned resources for effective and timely execution of the projects.

Conducting the periodical coordination meeting with client, Services Consultant and Contractor and its follow-ups.

Supporting the project team to obtain the various Statutory Authority NOC’s and approvals.

Coordination with specialist contractor and vendors to provide necessary services provisions timely and accurately.

Reviewed preliminary project concepts and schematics (drawings, specifications, calculations).

Monitored construction/implementation for conformity with approved design, including detailed scheduling and coordination.

Review and approval of all Electrical, IT, Security Systems, BMS and Audio Visual shop drawings and Material Submittals.

Quality assurance and reporting the non-conformity (NCR).

Attending request for informations (RFI) in coordination with Design team.

Establishing the testing, commissioning and project handing over documentations procedures.

Ensured QHSE requirements are performed in job-related activities

Participated in QHSE audits and workplace inspections.

Coordination with Statutory authority to obtain the services connections.

Review and approval of variation claimed by contractor.

Certification / Verification of contractors running bill. As Technical Office Manager

Interface with client to develop schematic design scope and preliminary budgetary parameters.

Leading the design team to develop MEP services design drawings in coordination with Structural, Architectural and ID consultants.

Obtaining the Statutory authority approvals like DEWA, Dubai Civil Defense, DPS, JAFZA, Etisalat, Tecom, Du, DCA and etc.

Conversant in the use of engineering software packages covering single line diagrams, load schedules, small power and lighting layouts, panel sizing, fire detection, ELV systems and electrical equipment selection, luminaires, circuit breakers and cables.

Thorough knowledge of relevant local and international standards and codes of practice with particular reference to NEMA, NEC, EN and IEC standards.

Coordination & Supervision of Design engineers and CAD technicians to enable them to get maximum productivity by adopting company working environmental policy.

Provide necessary technical information required for design team & share new ideas opinions.

Develop & implement Company’s Cad standards to maintain uniform data storage & Retrieval.

Communicating with the vendors, subcontractors & clients for the technical clarifications & queries.

CV of Muhamed Ashraf pg. 3 of 3

Coordination with various specialist subcontractors to integrate all the MEP systems including BMS.

Creating reports for the management about the day to day activity & progress about the ongoing projects for the timely completion.

Releasing the Tender documentation and preparing Tender Evaluation reports to finalize the services contractors.

Major Projects Involved:

CKR Consulting Engineers (PMC)

Radisson Blu Hotels & Resorts, Nairobi, Kenya

Banyan Tree Resorts Kerala, Alappuzha, Inida

CKR Consulting Engineers (Design office)– Dubai & India

The Island, Hospitality & Leisure - wasl Hospitality & Leisure.

BlueWaters Island, Hospitality, Residence and Mosque – Meraas, Dubai.

Burj Dubai-OTCI, Dubai.

Marriot Hotel and Executive Apartments – 28 floors, DHCC, Dubai.

Al Tayer Motor Showrooms.

Number of towers with 30 to 60 floors Residential and commercial buildings for ARIISTO (Atithi Builders) Mumbai, India.

Marriot Courtyard Hotel, Kochi Airport (Lulu Group International) Kerala, India.

Madura Meenakshi Hospital at Thanjavur, Tamil Nadu, India. WS Atkins – Abu Dhabi & Dubai

47 Storeys Residential Tower at Dubai Marina.

51 Storeys Residential Tower (Salam Tower) at Sheikh Zayed Road.

Dubai Autodrome & Business park for Union Properties.

50 Storeys Bahrain World Trade Center.

40 Storeys Residential Tower at Jumeirah for Damac Properties.

Extension to Sheraton Jumeirah Beach (18 Storey).

Barr al Jissah Resort for Zubair Group at Muscat. EMCO – Ascon -ETA, Abu Dhabi

ADNOC Ruwais Pacs phase 1 (Renovation of Main Control Room Building & Utility Control Room Building)

SHAIL Field Development project (ADCO – Project No.: P 16038)

Substation for Bab-Asab 132 kV Interconnector. (ADCO – Project No.: P 12201)

Ruwais Refinery Expansion Project (ADNOC – Project No.: 1214) A&P Paraskevaides & Partners LLC, Abu Dhabi

Amiri Flight facilities at Abu Dhabi International Airport, Abu Dhabi. Additional Exposure

Attended ISO 9001 Internal Auditing training by Lloyds.

Valid UAE & Indian Driving License.

Personal Details:

Date of Birth : 1ST June 1971

Nationality : Indian

Marital Status : Married



Contact this candidate