E- mail adn0l2@r.postjobfree.com
ANTHONY GINETE ABUTAL
Age: 51 yrs old
Date of Birth: February 10, 1969
Place of Birth: St. Joseph’s Hospital
Status: Married
Religion: Roman Catholic
Contact #1: +633********
Contact #2: +966*********
Passport #: P1359035A
Iqama #: 246-***-****
POSITION APPLIED FOR: ELECTRICAL SUPERVISOR
OBJECTIVES:
Seeking a responsible position in the company and become a valued member of the team by sharing my skills and abilities based on my professional experience and expertise as ELECTRICAl supervisor
SKILLS, KNOWLEDGE AND ABILITIES
Long experience installation of electrical equipment in oil and gas, Petrochemical, Refinery,Power plant,distribution line,solar panel installation and precommissioning activities Trouble shooting, Solo run test,Functional test fire alarm system and local control switch.
Certified MV/LV Splicing and Termination job in different type of kits 3M Cold Shrink, ellastimold, euro mold, Raychem.
Ability to read blue print, schematic design, Diagram and solve electrical problem.
Ability to use electrical test equipment, megger, voltmeter, clamp tester phase sequence meter, vibration meter, tempeture meter, taco meter and able to operate hi-pot test equipment, rotating equipment.
Willing to perform others duties specially preparation for testing
Able to work outside in adverse weather condition.
Excellent Communication skills and verbal skills.
Have an operational medium voltage experience.
WORK EXPERIENCES AND RESPONSIBILITIES:
Company ; KHALID S. ALSHARANI EST.
Position ; ELECTRICAL SUPERVISOR
Duration ; feb 20, 2020 up to present
Client ; SAUDI ARAMCO
Project ; Haradh & Hawiyah Field Gas Compression Project TECHNICAREUNIDAS
Company ; Midong Engineering & Construction Co Ltd
Duration ; jan 9,2019 up to feb 13,2020
Client ; SAUDI ARAMCO
Project ; Ethylen Deep Recovery Facilities (EDRF)
Yhundai Engineering
Company : SAM YOUNG SAUDI ARABIA CO. LTD
Duration : Oct 1,2017 up to May 31,2018
Electrical Precomm technician
Main Contractor :JGC/ DEC
Client : SAUDI ARAMCO
JIZAN REFINERY &TERMINAL PROJECT EPC 12
Company : Dongyeong Engineering & Construction Company Ltd.
Khalid S. Alsharani Est.
Position : Electrical technician
Duration : January 29, 2010 up to May 18, 2017
Client #1 : SAUDI ARAMCO / SUMITOMO
Project : PETRO RABIQH Phase ll, OIL & GAS Project (CP3&4)
GS Engineering and Construction Arabia
Mecca, Kingdom Saudi Arabia
Client #2 : SADARA
Project : SADARA TANK FARM PROJECT
Daewo Engineering CO. Ltd.
Abuhadriyah,Jubail ll Kingdom Saudi Arabia
Client #3 : IPC-International Petrochemical Company
Project : (SIPCHEM) EVA /LDPE Project
GS Engineering & Construction Arabia
Jubail, Kingdom Saudi Arabia
Client #4 : SAUDI ARAMCO
Project : KHURSANIYAH KARAN GAS PLANT FACILITIES
GS Engineering & Construction Arabia
Khursaniyah, Kingdom Saudi Arabia
Duties and Responsibilities:
• Read and interpret blueprints, schematics diagram.
• Install and fabricate cable trays such as offset, raiser and elbow.
• Install GI and PVC conduits for lighting and small power system.
• Erection of panels such as Protection panel, Switchgear panel, GIS panel and etc.
• Pulling cables from point to point.
• Conduct insulation resistance test of cable.
• Glanding, crimping and terminate the cable.
• Termination of control cables for protection panel, switch gear panel and GIS panel
• Assisting Engineer for the testing and commissioning of all relays
• Lay outing of fiber cable inside the substation using proper tools.
• Splicing fiber optic using Inno Fusion Machine and troubleshoot its losses using Optical Time Domain Reflectometer (OTDR) Visual Fault Locator (VFL) Optical Power Meter (OPM) Optical Light Source (OLS) and other testing tools like Optical microscope.
• Install all electrical devices of all electrical system such as Fire alarm system (smoke light fixtures.)Small power system (sockets and isolator switch) Data system, CCTV and BMS
• Troubleshoot alarm and faulty signals.
• Testing and troubleshoot all the electrical system prior of energizing.
• Repair and replace any defective components of any electrical devices if needed.
• Evaluate electrical problems also during operations.
• Knowledgeable about HVAC installation and troubleshooting.
Company : JAL International Contracting Company
Position : Electrical tech/cable terminator
Duration : October 29, 2002 up to November 12, 2009
Client #1 : NATIONAL CHEVRON PELLETS (NCP)
Project : Saudi Polymers South Plot Project
DAELIM Engineering & Construction Arabia
Jubail Industrial City, jubail, Kingdom Saudi Arabia
Client #2 : YANBU SAUDI BASIC COMPANY (YANSAB)
Project : YANBU Petrochemical plant
Foster wheller / TECHNIP
Alsinayah, yanbu Kingdom Saudi Arabia
Client #3 : SAUDI ARAMCO (Riyadh)
Project : Pre-Commissioning and Commissioning Phase
B-10-00114, Replacement of Obsolete Switchgears and electrical
Equipment of Substation.
Client#4 : SAUDI ARAMCO (Exploration Computer Network Operation Division
Project : ECC,UPS Upgrading project
Dharan, Saudi Arabia
Duties and Responsibilities:
• Read and interpret blueprints, schematics diagram.
• Install and fabricate cable tray such as offset, raiser and elbow.
• Install GI and PVC conduits.
• Install panels or switch boards such as Light Control Panel (LCP), Building Management System Panel (BMS), Fire Alarm Control Panel (FACP), Sub Main Distribution Panel (SMDB) and other Panels.
• Pulling cables from point to point
• Conduct insulation test resistance test.
• Glanding, crimping and terminate the cable.
• Install all electrical devices of all electrical system such as Fire alarm system (smoke detector, break glass, fire horn and lights,) Lighting system (2 way and 3 way switch, light fixtures.)Small power system (sockets and isolator switch) Data system, BMS
• Testing and troubleshoot all the electrical system prior of energizing.
Company : Saudi Electrical Contracting Company
Position : LINEMAN/MV CABLE SPLICER
Duration : July 2000up to August 2002
Client #1 : Saudi Electricity Company (Eastern Region Branch)
Project : Power Transmission and Distribution Project
DUTIES RESPONSIBILITIES:
Erection of steel pole / wooden pole.
Cable termination in transformer and splicing.
Cable pulling, Sagging of ACSR Power Cable.
Banking of transformer and termination.
Tested electrical system and modification.
Disconnected equipment, electrically and mechanically for interference and provided temporary power 480V, 120V for work to be completed in numerous areas.
Hands-on termination of hv/mv cable and splicing.
Operated Hi-pot equipment test up to 69kv.
Company : Mohammad Almojil Group Construction Division
Position : ELECTRICAL LEADMAN / MV CABLE SPLICER
Duration : August 26, 1997 up to May 1999
Client #1 : LINARCO Arabian Contractors
Project : Air Seperation Plant
Yanbu Kingdom Saudi Arabia
Client#2 : YANPET EXPANSION PROJECT
Project : Yanpet Polymers Project
MHI -MitsubishI Heavy Industry
Yanbu Kingdom Saudi Arabia
DUTIES AND RESPONSIBILITIES:
Performed difficult or routine installation, repaired motors and generator, replaced brushes make connection, and termination.
Planted equipment tripping to provide and assist immediate route line trouble shooting and remedial action for recovery.
Received and adhered daily operating instruction from work supervisor and give feedback immediately to address the problem and issues.
Checked line and IR test of control and power cable prior for termination
Hands-on cable termination of local control switch MCC, MOV motors switchgears, control gears, battery and UPS.
EDUCATIONAL BACKGROUND:
North Elementary School Graduated, 1981
Elementary Central Manapla, Manapla Negros Occidental, Philippines
Saint Roch Academy Graduated, 1985
Secondary Manapla, Negros Occidental, Philippines
Institute of Integrated Electrical Engineers of the Philippines Incorporated
Eastern Region Chapter, Saudi Arabia
November 20,2015
Course: REGISTERED MASTER ELECTRICIAN (RME) LICENSE #0052359
MFI Technology Institute
MFI Building Ortigas Avenue, Pasig City, Philippines
March 7, 2009
Course: INDUSTRIAL ELECTRICIAN
Thomson Education Direct.
Bloomingdale Plaza Shaw Boulevard 1606, Pasig City, Philippines
April 15, 2014
Course: INDUSTRIAL INSTRUMENTATION AND PROCESS CONTROL TECHNICIAN
TRAINING/SEMINAR ATTENDED:
Philippine Society of Safety Practitioner, Middle East Region
Course: Basic Occupational Safety and Health (BOSH)
Philippine Society of Safety Practitioner, Middle East Region
Course: Electrical Safety
Philippine Society of Safety Practitioner, Middle East Region
Course: Industrial Hygiene
Philippine Society of Safety Practitioner, Middle East Region
Course: Scaffold Safety
Saudi ARAMCO
Course: Permit Receiver (Hot, Cold, Confined Space)
MohammadAl-Mojil Group
Course: Construction Safety and Health Management
OTHER ELECTRICAL TRAININGS:
Certified Cable Jointer-Terminator Up to 36 Kilo volts
Protection Relay principle operation testing and calibration.
Grounding system and power system protection and coordination.
Hand on training course or 3M Cold shrink technology of electrical procedure.
Cable splicing development program.
REFERENCES:
YUN HOI HYUN Ethane Deep Recovery Facility Project
CONSTRUCTION MANAGER SAUDI ARAMCO
Email :adn0l2@r.postjobfree.com
MIDONG ENGINEERING SAUDI ARABIA
HERMINIO CONTI JIZAN REFINERY & TERMINAL PROJECT EPC 14
QC MANAGER SAUDI ARAMCO
Email :@herminio.conti
MIDONG ENGINEERING SAUDI ARABIA
J.S. Cho Dongyeong Engineering
Site Manager Khalid S. Al-Shahrani Est .
P.O.Box 34 Rahima 31541 K.S.A
+966********)- Jubail Office
I hereby certify that all above information stated is true and correct based on the experience and knowledge. Any false statement written in this application may cause for a termination.
ANTHONY G. ABUTAL
Applicant