NARENDRAN . P
Electrical Engineer Contact number:
Kuwait:+965********
India :+91-735*******
E-mail : *****.***@*****.***
SUMMARY
** *****’ of experience in Power Sector (16 years in Middle East).
Leadership quality in attaining best quality output for Testing & Commissioning activities.
Approved as Protection engineer for 300v/132kv/11.5kv Preventive maintenance (PSMD )MEW by Hitachi
Approved for MEW Commissioning engineer substation for PAHW mutla for M/s NCC,M/s L&T
Expertise in Testing & Commissioning of :- 400/132/11 KV AIS & GIS substation, 100 MVA Transformer, Reactors HV, MV, LV Equipment’s, Capacitor bank’s Substation,DC chargers, Battery banks systems.
Sound knowledge in Electrical Protection Scheme and Logics.
Expertise to clear technical variances with O&M support.
Solid management skills, demonstrated proficiency in leading and monitoring individuals to work effectively as a team.
CAREER PROFILE
oOrganization : M/s Energy solution llc, Kuwait
oDesignation : Testing and Commissioning Engineer
oPeriod : jan 2019 to till date .
oOrganization : M/s PDCS PROJECTS INDIA PVT LTD
oDesignation : Senior Testing and Commissioning Engineer
oPeriod : Oct 2013 to Oct 2018.
oOrganization : M/s INEL PROJECTS INDIA PVT LTD
oDesignation : Senior Testing & Commissioning Engineer
oPeriod : Apr 2009 to Jun 2013.
oOrganization : M/s SYSPRO AUTOMATION PVT LTD
oDesignation : Testing supervisor
oPeriod : Apr 2008 to Apr 2009.
MAJOR WORK EXECUTED COUNTRIES
India, Kuwait, Qatar, UAE(Abu Dhabi )
TESTING AND COMMISSIONING ACTIVITIES PERFORMED:
Testing & Commissioning of Indoor / Outdoor packaged substations and substation equipment’s with all type of switchgears including SF6, VCB & ACB’s from 400V to 400kV.
Testing & Commissioning of LCC & Protection panels for 400kV to 33kV GIS.
Testing & Commissioning of 11kV Capacitor panel and Power Transformer.
Generator SC, Stability tests performed and Synchronization with Grid.
Busbar Stability and Sensitivity tests performed for Switchgear
Differential and REF Stability tests performed for Power Transformer.
Trouble shooting of various electrical systems including Oil & Gas sector, Thermal power plants.
Design, Configuration, Testing and Commissioning of Alstom make protection relays in compliance with ANSI/IEEE standards.
Performing all FAT & SAT activities.
Testing and Commissioning of various types of relays including Areva, Siemens likely-, Transformer protection,, Motor protection, Switchgear feeder protection, and Load Shedding function, LBB protection, Synchronizing Scheme, and SCS signal simulation. Breaker and calibration of Digital Meters, Energy Meter.
Preparation of pre-commissioning check lists, test reports, as built drawings, cable schedules and detailed commissioning schedules for above mentioned systems.
Modification of schemes as per Customer and Site requirement.
Preparation of detailed work schedule, drawings, cable schedules to carry out the shutdown work for modifying or upgrading the existing electrical systems such as additional bays in existing substations, additional panels to existing switchgears. Annual maintenance testing of relays and substation equipment’s.
Responsible to arrange and attend the design review meetings with the clients and vendors.
Maintaining Test Report documents and submitting to clients
MAJOR PROJECTS EXECUTED IN KUWAIT
Project : Preventive maintance for Primary Substations
Client : MEW Kuwait 300/132/11.5kV
Contractor : ABB/HITACHI ENERGY Kuwait
Job Responsibility :
Testing of protection Relays
Testing of all Primary equipment like CT, Meters,, functional Trip test, Bus bar Trip.
Project : Public housing board muthla Substations
Client : MEW
Contractor : L&T
Project : Clean Fuel Project - Packaged substation
Client : KNPC (Kuwait national Petroleum Company)
Contractor : JGSK
Project : Elevated Substations
Client : KOC (Kuwait oil company)
Contractor : SK
Job Responsibility :
Elevated substations commissioned GC01,GC02,GC04,GC06,GC07,GC11,GC17,GC19,GC20,GC21,GC22, BS140, BS151,BS171
Project :MEW substations Kuwait .
Client : MEW (Ministry of Electricity and water ) Kuwait
Contractor : Al Ahleia, Kharafi national,
Working as a testing and commissioning Engineer for the following 132KV S/S projects in MEW kuwait.
·Sabah al ahmed F s/s.
·Sabah al ahmed H s/s
·Sabah al ahmed 2A,2K,2B s/s
·Abu Faterra E s/s
MAJOR PROJECTS EXECUTED IN QATAR
Working as a Testing & Commissioning Engineer for the following,
·Ezdan housing project ezdan 1 Substation (220/132/11KV), KAHRAMAA (Through M/s Siemens)
·Ezdan housing projects Ezdan 2,3,4 Substations (132/66/11KV), KAHRAMAA (Through M/s Siemens)
·Mesaieed industries E Substations (220/132/33KV), KAHRAMAA (Through M/s Siemens)
MAJOR PROJECTS EXECUTED IN ABU DHABI
Worked as Testing and Commissioning Engineer for the following,
Takreer oil refinery Ruwais RRE –exp3- 7 Substaions,Takreer (Through M/s Samsung)
MAJOR PROJECTS EXECUTED IN INDIA
Working as a Testing Engineer for the following project.
400 KV Adani power S/S, Sami, Gujarat.
400kv APTRANSCO S/S Uravakonda, andhra pradesh
400/220 KV PGCIL S/S, Tirunelveli, Tamilnadu
Bathia coke division 110/11KV,Chennai
NTPC 3*500 MW power plant, chennai
J.R . Steels 110/33KV,Chennai
Loyal Textile 33/11KV,Andhra Pradesh
.
CERTIFIED COURSE:
ETAP COURSE IN POWER SYSTEM ANALYSIS,
TESTING KITS USED:
Secondary injection kit such as Omicron 356,Doble (FS600), ISA Test Unit, Sverker 750 Programma, Freja series
C.T Analyser Omicron, CPC 100 Omicron, VANgard, Breaker analyzer scope
Contact Resistance Meter – Scope 100Amps, Single Pole Timer – Scope l.
High Pot Kit – 40Kv, ODEN Primary injection.
DECLARATION:
I hereby declare that all the information mentioned above is true to the best of my knowledge.
Yours Sincerely,
Date:
(Narendran.P)