Post Job Free
Sign in

Engineering Corporation Power Electric

Location:
Batangas City, Batangas, Philippines
Posted:
June 08, 2021

Contact this candidate

Resume:

EDMUNDO JESUS CHARVET ZUÑIGA

AIR CON TECHNICIAN

CONTACT OBJECTIVE

To secure an AC technician position with a successful, well-established organization that will enable me to grow professionally while contributing to the company goals and success. SUMMARY: In-depth knowledge and experience to install, maintain and repair air conditioning units

Email: admzwk@r.postjobfree.com

Phone: +639*********

Address: Bawi, Padre Garcia, Batangas 4224

Philippines

PERSONAL DETAILS

Date of Birth: April 23, 1973

Marital Status: Married

Nationality: Filipino

EDUCATION

Tertiary Level: Three-year

Industrial Technician

Pablo Borbon Memorial Institute

of Technology / Batangas City

1990-1993

EXPERIENCE

High School Level: National

College of Business and

Arts

Taytay, Rizal

1986-1990

Elementary Level: Angono

Elementary School Unit 1

Angono, Rizal

1980-1986

AIR CON TECHNICIAN

Khonaini International Co. Ltd

8612 King Faisal W, 2834, Al Jubail 35514 2834, Saudi Arabia April 18, 2011 – January 30, 2021

• Installed, maintained, and repaired ventilation and air conditioning units

• Diagnosed faulty electrical and mechanical equipment on HVAC systems

• Cleaned, adjusted, and repaired systems

• Performed emergency repairs efficiently and promptly

• Identified maintenance risks on equipment

• Performed warranty services

• Ensured compliance with appliance standards and Occupational Health and Safety Act

DIRECT WORKER (at Wire Preparation Section)

Philippine Kyohritsu, Inc.

Km. 75 Laurel Highway, Bo. Inosloban, Lipa City, Batangas January 11, 1996 – April 30, 1997

• Cut wires to specified lengths using wire cutters ruler or measuring jig

• Stripped insulator from wire ends using a stripping tool

• Twisted wire ends and dipped them into a pot of solder to avoid fraying

• Rolled wires of identical number or color which attaches a tag to roll

• Inserted wire into plastic insulation tubes

• Inserted wires in automatic numbering or color-coding machine to imprint color codes and part numbers

• Applied protective coatings onto wires, using a brush REFERENCE

Ma. Jesusa Z. Corpuz

TGK Asia Consulting

Company

Project Manager – Consultant

Email: admzwk@r.postjobfree.com

Phone: +639*********

PRODUCTION TECHNICIAN

Procter & Gamble Philippines, Inc.

6750 Ayala Ave. Office Tower, Ayala Center, Makati, Metro Manila May 2, 1995 – October 28, 1995

• Performed equipment setup, operation, equipment adjustments

• Delegated minor preventative maintenance tasks for standard safety, quality, and efficiency

• Ran tests on all equipment and assemblies for safety and productivity ELECTRONIC ASSEMBLER

Astron Philippines, Inc.

Makati, Metro Manila

June 1993 – December 29, 1993

• Read and interpreted drawings, diagrams, specifications, blueprints, reports, and work orders

• Cleaned electronic parts and equipment thoroughly

• Inspected wiring installations, circuits, and assemblies

• Assembled electronic components, subassemblies, and products

• Maneuvered hand tools including stakes, crews, bolts, rivets, welds, solders, cements, press fits, and similar hand tools

• Mount assembled components such as resistors, transformers, transistors, capacitors, integrated circuits, and sockets on chassis panels ON-THE-JOB TRAININGS

ELECTRICAL AND INSTRUMENTATION TRAINEE

United Coconut Chemicals, Inc.

Electrical and Instrumentation Section, Engineering Department 923 hours

Aplaya, Bauan, Batangas

October 29, 1992 – March 31, 1993

• Inspected, tested, adjusted, and repaired electric, electronic, mechanical, and pneumatic instruments and systems used to identify, record, and control generating operations in conventional or nuclear power electric plants

• Tested accuracy of flowmeters, pressure gauges, temperature, controllers, radiation, detectors or counters, and other recording, indicating, or controlling instruments to track defective components

• Traced out and tested electronic solid state and vacuum tube circuitry and equipment

• Reassembled instruments and replaced instruments in system

• Calibrated instrument readings in accordance with standards to ensure accuracy and secure function

• Lubricated instruments and replaced defective wires and tubes ELECTRONICS TECHNICIAN TRAINEE

PNOC Dockyard & Engineering Corporation

San Miguel, Bauan, Batangas

April 30, 1992 – June 4, 1992

• Installed and repaired electronic equipment

• Calibrated and aligned cables and wiring

• Monitored and reported on project progress

• Assembled and connected system components

• Built prototype models based on technical guidelines

• Monitored and reported on project development

• Estimated damage and calculated material cost

• Tested system’s functioning level

• Read and analyzed complex manuals and diagrams

• Collaborated with engineers and other professionals on technical tasks



Contact this candidate