Post Job Free

Resume

Sign in

Mechanical Engineer

Location:
Dubai, United Arab Emirates
Posted:
June 07, 2021

Contact this candidate

Resume:

Nader Mousa

M E C H A N I C A L E N G I N E E R

+971**-*******

A B O U T M E

admzqs@r.postjobfree.com

Abu Dhabi, UAE

Expertise in Building

Construction with hands-on

experience in Hospitals,

Commercial and Hotel buildings

in UAE.

S K I L L S

E X P E R I E N C E

MECHANICAL ENGINEER

BIC CONTRACTING COMPANY

N M

Lifts System Knowledge

HAP, E-20 HVAC Design Programs

McQuay Duct & Pipe sizer

Autocad, Solidworks & MS programs

HVAC System Design Knowledge

Fire Protection System Design Knowledge

Drainage System Design Knowledge

Plumbing System Design Knowledge

Medical Gas System Knowledge

• New Buildings of Armed Forces Officers’ Club and Hotel

(January2019 – Present)

Handing over Catering Facility Building with all functional Mechanical systems such as HVAC, Fire Protection, Plumbing, Drainage and Gas systems. Coordination and management of kitchen special systems of ventilated ceiling, hoods, and kitchen specialist equipment.

Executing and managing mechanical works of various buildings, such as: Banquet Hall, Hotel villas and Beach clubs.

External and Infrastructure works of the project with connecting and interfacing building systems to Authorities networks to obtain successful systems as: Chilled water, Potable water, Sewer, Stormwater, Etc.

Verification of the design to ensure functional coordinated systems according to project specification and international standards.

Preparation of material submittals including material selection in addition to producing shop drawings prior to start installation.

Material Handling supervision, installation works, according to specifications, approved shop drawings, method statements to meet the contact program. Coordination for discrepancies between mechanical drawings with Architectural and structural ones to prevent any conflict.

Supervision of installation of AHUs, FCUs control boxes with all containment work and power cables connections.

Coordinate for discrepancies between mechanical drawings with Architectural and structural ones to prevent any conflict.

Supervision of installation of AHUs, FCUs control boxes with all containment work and power cables connections.

S O F T S K I L L S

Communication

Coordination

Teamwork

Problem Solving

Leadership

E D U C A T I O N

Bachelor of Science in Mechanical

Engineering

Tishreen University, 2016

Safety Training Course

Speed way Safety Training Center, 2018

HVAC Design Course

Arabian Infotech Training Institute,2019

LEED GA Course

Quadra Plus training Institute, 2021

C E R T I F I C A T I O N

IELTS

Test Certificate

LEED GA Certification

USGBC, April 2021

Manage and control subcontractors to achieve the target plan and through a proper coordination of shop drawings and during site installation. Maintain awareness of individual responsibilities for safety and quality to meet company standards in safety, environment, and quality.

Review the contract documents and accordingly prepare request for information/clarification for any conflicts and missing information. Review Engineer’s site instruction, comments on Shop drawings, response to RFI’s and coordinate with commercial department for any changes with cost implications. Assist commercial department’s monthly valuation claim to ensure all MEP works carried out are included in the application.

Drafting letters to all concerned parties of the project to clear issues and to reserve company’ rights in all disciplines.

• Fakeeh University Hospital – Dubai (August 2017- January 2019) Managing and executing mechanical services installation and manpower at site for HVAC, Firefighting, Plumbing, Drainage, and lifts.

The analysis of works preformed (daily report – monthly report) and the assessment of consequences where needed to enhance the productivity. Liaising with the consultant to raise inspections for materials and work to obtain approvals.

Coordination with construction team to create suitable conditions for work and to avoid discrepancies, according to site conditions and site requirements. Coming up with innovative solution to sort out problems on site. Assist commercial department head with monthly valuation claim to ensure all MEP works carried out are included in the application.

• Upgrade of Junctions at Airport Road (March 2017 – August 2017) Installation of irrigation system for the new road facilities. Removing and re-installing of existing drainage network to match with the intended changes and the new constructions.

Removing and re-locating of street light poles and traffic signals according to the road new arrangement.

Prepare for the inspection and the services to obtain approvals.



Contact this candidate