Post Job Free

Resume

Sign in

Strategic Project Electrical Engineer

Location:
Cairo, Cairo Governorate, Egypt
Posted:
June 06, 2021

Contact this candidate

Resume:

DIALUX For lighting

calculations

ECODIAL For Electrical

Loads calculations

ACONEX for Constructions Data

documentation & Logs.

Micro Soft Office Package

AutoCAD

Soft Skills

Education

https://www.linkedin.com/in/

ahmed-raslan-a2ba7981/

admysv@r.postjobfree.com

002-***-**-*** 996

CONTACT INFO

Professional Experience

About 16 years broad experience in medium to large Scale & high rise buildings and infrastructure projects, covering the spectrum of design, Supervising, Implementations, procurement (Site & Technical office) of Electrical constructions & Infrastructure particularly in Egypt & KSA. Date: - SEP 2016 – AUG 2020 (47 months)

Position: - Team leader - Electrical engineer (site & technical office) Employer: - Fisia Italimpianti SpA - water treatment and desalination plants-KSA Date: - APRIL 2014 – AUG 2016 (28 MONTHS)

Position: - Senior Electrical Site Engineer (Supervising consultant) Employer: - DAR AL-RIYADH Engineering & Architectural Group – KSA Date: - OCT 2009 – FEB 2014 (52 months)

Position: - Site Electrical Engineer (Supervising consultant) Employer: - ALNAEEM Engineering & Architectural – KSA Date: - MAR 2008 – SEP 2009 (18 months)

Position: - Electrical Site Engineer (Contractor engineer) Employer: - JARIR Contracting Company – KSA

• Degree :- Bachelor of Electrical

engineering

• Institution :- Higher Technological

Institute (HTI)- 10th Ramadan city –

EGYPT

• Date :- Jan 2005

. Grade :- Good

. Percentage :- 70.3 %

. GPA :- 2.4 /4

Date: - AUG 2006 – MAR 2008 (19 months)

Position: - Site Electrical Engineer (Contractor engineer) Employer: - ALTERAIS Contracting Company – KSA

Date: - JAN 2005 – JUNE 2006 (19 month)

Position: - Site Electrical Engineer (Contractor engineer) Employer: - CAMPASH contracting Co – EGYPT

1 - MV/LV power network distribution (Cables & Distribution panels etc.) including (Calculations & Selection criteria)

2 - Internal/External lighting and power outlets

3 - Roads and Landscape lighting

4 - Earthing & lightning protection.

5 - HVAC system Power supplying network.

6 - Power Control (Generators, substation, transformers, UPS …etc.) 7 - Low current systems piping, Boxing and wiring (BMS, IP, Fire Alarm… etc.) 8 - Testing & Commissioning Of installed Electrical systems These include but are not necessarily limited to

PROFILE

B) - Experience history

A) - Area of Expertise

Ahmed Fawzi Raslan

Electrical constructions engineer

100%

100%

100%

100%

90%

Design

Photography Pc Game

HOBBY

Trevelling Chess

• SHOIABA sea water treatment plant– 65 Megawatt power network – Jeddah -KSA

(2005-2006)

• Private high rise Housing Towers- EGYPT – 0.3 Megawatt power network

(2006-2008)

• Patriot Battalion aviation Military Base – TABUK – Ministry of Defence – KSA – (25 Megawatt Power network)

(2008)

• Air forces strategic project – King Khalid Air base – Tabuk – KSA- 0.5 Megawatt power network

(2007)

• V.I.P Guest Palace – King Khaled Air base - Tabuk – KSA 1.2 Megawatt power network

(2008-2009)

• Youth housing project Infrastructure works (450 villas / 11 Megawatt Power network) – New Borg Alarb city – Egypt• New Borg Alarb city – Alex city Highway lighting – Egypt

(2009)

(2007-2008)

• Girls school complex – King ABD ALAZIZ military city – Tabuk – KSA-

(3 Megawatt Power network)

• Designing Electrical

construction works for

Ministry of Higher

Education – KSA: -

• ARAR university

infrastructure

• BAHA university

hospital

• Jouf Medical science

faculty

• ABHA medicine faculty

• Girls education faculty

at Onizah

• Tabuk business college)

• ARAR Housing project (615 Villas) –Ministry of Housing

– KSA- – 2.2 Megawatt power network

• Science college - King Saud university (West Riyadh branch-Muzahmiya)- Ministry of Higher Education – KSA

– 4.5 Megawatt power network

• Infrastructure works for Colleges complex - King Saud university (West Riyadh-Muzahmiya)- Ministry of Higher Education – KSA-(2012-2014)