Post Job Free

Resume

Sign in

Electrical Technician Power Plant

Location:
Lebanon
Posted:
June 06, 2021

Contact this candidate

Resume:

E L I A S K HOURY

Kartboun- Lebanon

Date of birth: 13 - December - 1985

Mobile No: 00961 - 70133240

E-mail: admy1f@r.postjobfree.com

EDUCATION

**** – 2020 Cnam – Paris– France

Master’s degree in Electrical Engineering

2006 – 2008 Dekwaneh – Lebanon

Technical Bachelor's degree in Industrial Electronics 2003 – 2006 Dekwaneh – Lebanon

Technical Diploma in Industrial Electronics

2000 – 2003 Kartboun – Lebanon

Lebanese Technical Baccalaureate in Electrical Industrial IN TRAINING

2018: Master’s degree final project

Study, installation & commissioning of a gasification machine which is transform plastic & RDF waste to a biogas

2008: LT Final project: “SNIPER”

Controlling the sniper mechanical movement & action via PC, using serial port & PIC & using a video-audio cam

2006: TS Final project: “DAILY PROGRAMMER”

Controlling the time to activate & deactivate automatically, the electrical equipments using PIC CAREER PROFILE

October 2014 – Till Present:

Electrical Engineer & Senior team leader Unipak- Tissue Mill

- Design, study & construction of ATS, electrical distribution panels, conveyors Panels.

- Design, study & construction of Synchro Panels.

- SCADA, PLC & VFD programming

- Design the electrical drawings for projects.

- Electrical Team Leader.

- Management Workshop.

- Organization of Team Works.

- Electrical team leader responsible for lot of machines operation October 2006 – August 2014: Team Leader POLYTRONICS S.A.R.L Industrial Automation Engineering

- Panels Commissioning for AL-Hurriya 64MW Power Plant in Baghdad – Iraq The system contained 8 generators 8MW Wartsila, 8 NETCON panels, 3 Synchro panels contained 11 EGCP3, 17 protection relays (8 SR489, 3 SR745, 6 F650), 4 panels for the mechanical I/O & 5 PLC-L62B controllers from Allen Bradley and 1400 I/O points. (With SAKR).

- Design, study & construction of electrical building distribution, distribution panel & ATS panels, synchro panel contain 4 generator caterpillar between 360 & 1000 KVA using comap controller, and electricity installation for Platea Project.

- Design, study & construction of synchro panel contain 2 generator caterpillar 410 & 500 KVA using comap controller for Mersaco.

- Design & study for synchro panel contain 4 generator caterpillar 1000 KVA for KMC Project.

- Design, study & construction of synchro, ATS & electrical distribution panels.

- Design, study & construction of electrical panels for water & fuel level system.

- Design, study & construction of electrical building distribution.

- Configuring Synchronization Controllers

- Programming SCADA, PLC & VFD

- Electrical Team Leader.

- Design the electrical drawings for projects & building.

- Repair some electronics Board ( AVR … )

- Software, hardware, PLC, Controllers

Juin 2005- Juin 2006: Electrical technician Aquatherma Engineering Electrical panels for the water treatment & Swimming pools Additional Works of electrical building installation COMPUTER SKILL

Windows, Word, Excel, Power Point, Visio, Internet

- MPLAB IDE

- C++

- Autocad & Electrical-Cad

- Orcad

- Visual Basic

- Java

- Proteus ISIS & ARES

- Eagle

- RSLogix, RSView

- Servlink

- Modbus Sim

- comap pc suite

- Delta PLC softwares

LANGUAGES

Arabic Mother Tongue

French Advanced

English Advanced



Contact this candidate