Silviu Ioan Badea

Personal Data Age: ** years old

Civil Status: married, two children

Phone: mobile +40-740******; land line +40-21-746****; mobilie Kuwait +965********

Address: **, ****** ***ea str.,Bl.B1, sc.C, et.3 ap.56 Bucharest Romania

Email: admxxt@r.postjobfree.com

Job Objective To work at a company from abroad as electrician, foreman or engineer.

Key Qualifications More then 20 years on the site experience

Took part at big projects of repairing substitution and commissioning of old electrical networks of high and low voltage from Bucharest. Made operation and maintenance, for the transformer posts (terminal transformers) and feeding points for about a quarter of Bucharest. During my more than10 years of abroad experience I was involved in a lot of projects in power and petrochemical plants.

Experience

Oct.01.2019 – Nov.15.2020, Electrical commissioning superintendent with Tecnicas Reunidas Kuwait, Alzoor project.

March.10.2019 – June.30.2019, Electrical Commissioning engineer with Tecnimont RAPID project P7 Malaysia. Followed Commissioning activities for IMCS and ENMCS (Schneider)

Jully.11.2017 – December.06.2018 Commissioning supervisor with Technip at South Tambey LNG, Yamal peninsula Russia. Supervised pre-commissioning and commissioning for EDG’s - 8pcs. 9MW each; coordinated tests for MV and LV cubicles and power transformers. Followed energization for 110kVequipments.

March.10.2017 – May.30.2017 commissioning technician with FIRST QUANTUM at mining project COBRE PANAMA. Performed tests for switchgears and power transformers.

April.16.2015 – December.07.2016 Lead electrical commissioning engineer with Petrofac UAE (UPPER ZAKUM 750 ISLAND SURFACE FACILITIES PROJECT –EPC2 PROJECT No. P7512). Wrote procedures for pre-commissioning, commissioning activities for 132kV ss, LV ss, UPS, VFD. Attended at meetings with client like Petrofac representative in order to give answers regarding status of pre-commissioning and commissioning activities. Prepared strategies for pre-commissioning and commissioning activities. Coordinated and followed the pre-commissioning tests for 132kV ( ABB GIS) ss. Coordinated and followed the pre-commissioning activities for 33kV (GIS Siemens) 6,6kV (Schneider).

Oct.01.2014 – April.01.2015 Electrical commissioning engineer with Petrofac for FPF1 Stella project Gdansk Poland; pre-commissioning and commissioning of the equipment of the marine platform after refurbishment.

Wrote procedures for pre-commissioning and commissioning activities, made the flow chart for commissioning activities; supervised pre-commissioning works.

Oct.01.2013- Sept.30.2014 Electrical commissioning supervisor with Tecnimont Borouge-3 PO/LDPE Project Ruwais - Abu Dhabi.

Supervised commissioning activities for ABB relays, tests for MV and LV cubicles power transformers and emergency generators. Followed pre-commissioning commissioning start up for Ansaldo VFD drives of 1,2MW up to 6MW. Involved in logic modification in order to have the best behavior of the relays during transient events.

Aug.01.2012- Oct.2013 Electrical commissioning engineer with Tecnimont Habshan 5 Gasco project – Abu-Dhabi Emirates.

Supervised the pre-commissioning, commissioning tests, for transformers (135/33kV, up to 11/04kV), breakers, outgoing feeders, ABB cubicles; putted in operation LV-VSD’s (ABB) by adjusting the parameters (programed the VSD). Attended at commissioning of big VSD drive and motor – 15MW. Did trouble shooting. Supervised the tests for ABB relays RET and REM.

Feb.07.2010- May.22.2012 Lead Electrical Commissioning engineer with Bonatti on Kashagan (Eskene) experimental project Atyrau Kazakhstan. Prepared the procedures for commissioning and pre commissioning tests. Conducted electrical commissioning and pre-commissioning team (9 supervisors). Planed commissioning and pre-commissioning activities in order to reach the milestone given by management. Checked G.E. protection relays (MV, LV, Emergency Diesel Generators) by secondary injection (ISA DRTS-6). Supervised the preliminary tests for UPS, L.V. cubicles, main transformers 35/10.5kV, MV cubicles, G.E. relays, and reported to AGIP about the results. Attended at the meetings regarding commissioning activities with AGIP. Involved in protection philosophy and gave solutions to avoid accidentally trips.

Apr.15.2008- Nov.01.2009 Commissioning engineer with Tecnimont on paraxilene aromatics plant Kuwait. I was involved in testing and supervising the tests for all electrical equipment that was installed in this plant like: M.V. substations (33kV/6,6kV Siemens cubicles with Siprotec relay and L.V. cubicles (with Simocode relay), M.V. and L.V. motors with a power up to 2,5MW, power transformers up to 25MVA. Supervised the tests and commissioning for UPS, chargers, and batteries.

Participated for the verification and development for the logic of the automations and protections for electrical switchgear from electrical substations.

Assured technical assistance for performing of prophylactic tests and measurements for the commission of the electrical installations.

Apr.01.2007 – Feb.20.2008 PTW engineer on Dubai Jebel Ali "L" station with Toshiba. Managing permit to work activities during commissioning of this plant in order to secure both safety condition for maintenance staff and reliable operation of the equipment .Responsible for the proper isolation (Lock out and Tagged out ) of the equipment/unit according to electrical diagrams during maintenance/shutdown for safety purposes.

Nov.16.2005- 31.03.2007 Toshiba power plant in Dubai (Jebel Ali "L" station; 3 gas turbine generator and 2 steam turbine generator) Commissioning engineer

Tested:

•Current transformers, voltage transformers for low voltage and for medium voltage (ratio, magnetizing curve, insulation, polarity, winding resistance) checked the CT and VT from the generator till LV substations

•Power transformers of 2,5MVA till 330MVA (transformers from step up 15,75kV/400kV to L.V., excitation )

•L.V. substations (ABB) with change over and emergency change over with more then 200 outgoing feeders (from wiering check till functional test)

•Breakers from 30A to 4000A from L.V. substations (all the tests)

•Sincrocheks, under voltages relays from LV stations

•Transducers, energie meters

•Hi-pot tests

•11kV substations with ABB cubicles (all the tests)

•AC motors from 0,4kV till 11kV (all the test for a motor)

•Wrote test reports for all the tests that I have done

• Used secondary and primary injection kits

Mar.20.2003 – Nov.10.2005 Branch for Electricity Distribution- Bucharest S.D.B. “S.C. Electrica S.A.” b-dul Ion Mihalache nr. 41-43 sect.1 Bucharest

Safety engineer

•Participated at the analyze of work accidents

•Made procedures how to work in places with hard conditions of work (with high risk of electrical and mechanical accidents)

•Took part at the analyze of the reason of start fire at an welding workshop

•Took part in the commission of put in to operation of new objectives like transformer (feeding) points, electrical networks and sign that there are a safety one

Dec.11.2002 – mar.20.2003 Branch for Electricity Distribution- Bucharest S.D.B. “S.C. Electrica S.A.” b-dul Ion Mihalache nr. 41-43 sect.1 Bucharest

Power Engineer Deputy of Head of PA-PT (substations - transformer points) Center on the west part of Bucharest (a quarter of city).

•Managed teams of electricians for emergence situations In order to re-supply the customers in case of power loosing.

•Managing the HSE activities in “VEST Network”

Oct.15.2001-dec.11.2002 Deputy of Construct Manager; Electrical & Instrumentation engineer with “Bonatti” and “SICIM” Kazakhstan branch; Aksay (Kazachstan)

•Managed teams of rusian workers

•Participated at construction of a electrical substation 110/6kV

•Calibrated manometers, pressure transmitters, temperature resistance, thermocouple using Dead Weight Testers, Loop generators, Honeywell registrations, Jofra and Scandura instruments for temperature.

•Used hard communicator

•Mounting trace heater on pipes and connecting it in J.B.

•Managed execution of a project of radar level (worked with relies and big control panels )

•Made maintenance for Jumbo heaters

•Made maintenance for LV generators

Jan.17.1999 – Oct.15.2001 Branch for Electricity Distribution- Bucharest S.D.B. “S.C. Electrica S.A.” b-dul Ion Mihalache nr. 41-43 sect.1 Bucharest

Power Engineer Head of PA-PT (feeding points- transformer points) Center on the west part of the town.

•Supervising the maintenance for about 42 substations and 800 transformer points (terminal transformers) 10/0.4kV and the branch boxes afferent.

•Commissioning and start up of transformer points, 10/0.4kV with SF6 equipment like Merlin Gerin, Siemens, ABB.

•Supervising substitution of low and high voltage network from a big area (a district from Bucharest), substitution of reception equipment of electric energy (branch box, branch terminal) for the subscribers from there area (panels with a lot of circuits who are serving the subscribers from a block of flats).

•Supervisioning all activities regarding the terminations for high voltage power cables (10 KV) – Raychem technology

•Managed the implementation on the computer the low voltage network, and all the database behind, of west part of the Bucharest using ArcView.

Mar.01.1993- 1999 Power Engineer with Branch for Electricity Distribution- Bucharest S.D.B.

•Surveyed important capital repairing works for the underground electric network of Bucharest

•Managed highly skilled small teams of workers (20peoples) in preventive works for low and high voltage cables and energetic equipaments (up to 10kV).

May 24 1990-1993 Technical assistant with Energomontaj, Bucharest Division: Electrical installation and automation.

Replace electrical equipments from MV substation internal services in coal-fired Power Plant Doicesti.

Checking of primary circuits (circuit breakers, current transformers, etc) and checking of the protections of the electrical station for internal services.

Aug.21. 1984-May. 24. 1990 Senior Electrician with A.D.P. (Administration of Public Domain) at a asfalt factory

•Participated in concreting and engine repairing works

•Electrician on low voltage equipment

•Participated at the construction of buildings for offices and near it some worm houses corps for flowers. Here I made the electrical installation for all of them.

Education 1985-1991 Energetic Faculty – Polytechnic University of Bucharest

Electroenergetics concentrations - night courses

1980-1984 “N.Balcescu” High School, Bucharest (Sf. Sava national college)

Autorised electrician to design and erecting works with equipment for medium and low voltage and unlimited power.

Skills and licenses Driving license A. and B. category from 1988 and 1994; clean record

Main skills in construction:

Welding – good

Locksmith – good

General practical skills

Experience in working in bad weather conditions (-38C worked in Aksay Kazakhstan)

Ability to handle tight deadlines

Ability to respond quickly to emergency situations

Ability to cover long distances for completing projects

Ability to handle objects over hundreds of pounds weight without automatic devices

Languages English: good level

Russian: little

Computer: Windows, FoxPro, Word, AutoCAD 14, ArcView GIS



Contact this candidate