Post Job Free

Resume

Sign in

Nondestructive Testing Conditioning System

Location:
Howrah, West Bengal, India
Salary:
NEGOTIABLE
Posted:
June 02, 2021

Contact this candidate

Resume:

CV OF SAIKAT BANDOPADHYAY

Name and full particulars

Name: c-Present Posting- Mechanical Execution Engineer in M/S Wellhead Equipment Engineers Pvt Ltd, Vadodara, Gujarat

Father: Pradip Bandopadhyay- Ex-Manager (Logistics)-Oil &Natural Gas Corporation Ltd, Kolkata

Mother: Bhaswati Bandopadhyay-House Wife

Address: Flat –C, 1st Floor, Harendra Apartment, 33 Bajey Shibpur road, Land Mark- Shibtala

Howrah 711102

Email Add: admvog@r.postjobfree.com

Mobile no: 706-***-**** and Alternative Mobile no. 933*******

,

Academic details

1.I have done M.Tech- from UNIVERSITY OF PETROLEUM AND ENERGY STUDIES, Dehradun, UTTRAKHAND w.e.f. 2016-2018 in Pipeline Engineering and achieved 69.50 % -Stood 1st Class

2.I have done B.Tech from Jodhpur Institute of Engineering and Technology, Jodhpur under RAJASTHAN TECHNICAL UNIVERSITY w.e.f. 2008-2012) in Mechanical Engineering and achieved 63.00 % -Stood 1st class

3.I have completed Senior Secondary Examination from Central School, Mehasana, Gujarat under Central Board of Secondary Educationachieved 70.6 %- Stood 1st Division.

4.I have completed Secondary Examination from Central School, Mehasana, Gujarat under Central Board of Secondary Education achieved 71.00 % -Stood 1st Division.

WorkExperience (5 years )

A)Client: Oil and natural Gas corporation

Contractor: TATA projects ltd.

Plant: Uran, Maharashtra

Project name: Fire water Network

Working Period: Oct 2012 to July 2014

Designation: Graduate engineer trainee

Job responsibility:

1. Planning & scheduling of site activities.

2. Maintain daily progress report.

3. To organize the safety toolbox meeting daily.

4. Underground pipes wrapping coating as per standards Ensure hydro test & line clearance as per drawing & standard.

5. Holiday test for underground wrapping coated pipes.

6. Reinforcement Pad test and air leak test of completed loops.

7. Hydro test arrangement for completed loops.

8. Involved in commissioning of High-volume long-range monitor and long-range monitor activities.

9. Follow safety standards as per OHSAS 18001, ISO 9001 (2015), ISO 14001.

10. supervision of welding along with Non-Destructive Testing.

11. familiar with ASME sec IX – welding qualification and sec V Nondestructive testing.

B)Client: TATA steel Ltd.

Contractor: TATA projects ltd.

Plant: Kalinganagar, Orissa

Project name: Underground water pipeline facilities.

Working Period: August 2014 to May 2015

Job responsibility:

1. Underground pipes wrapping coating as per standards Ensure hydro test & line clearance as per drawing &

standards.

2. Holiday test for underground wrapping coated pipes.

3. Various NDT like hydrotesting, Radiography.

4. Follow safety standards as per OHSAS 18001, ISO 9001 (2015), ISO 14001.

5. Erection of pipeline by 180 metric ton crane.

6. familiar with ASME sec IX – welding qualification and sec V Nondestructive testing.

C)Client: PIONEER GAS POWER PLANT

Contractor: TATA projects ltd.

Plant: Mangoan, Maharashtra

Project name: Heat, Ventilation and Air conditioning system.

Working Period: May 2015 to Nov 2015

Designation: Mechanical engineer

Job responsibility:

1. Planning & scheduling of site activities.

2. Isometric drawing Detailed study.

3. Hydro test arrangement for completed loops.

4. Follow safety standards as per OHSAS 18001, ISO 9001 (2015), ISO 14001.

5. supervision of welding along with Non-Destructive Testing.

6. fabrication of pipe support and erection.

7. familiar with ASME sec IX - Welding qualification and sec V-Nondestructive testing.

D) Client: GAIL India Ltd.

Contractor: ACE pipeline contracts pvt ltd.

Project Name:Dhobhi to Durgapur pipeline

Working Period:March 2019 to August 2019

Designation: Management trainee

Job responsibility:

1. Planning & scheduling of site activities.

2. Alignment sheet Detailed study.

3. Welding as per standard.

4. Making weld visual report and giving offer to QC department.

5. Pre hydrotesting of HDD section.

6. Ensure lowering mat for the lowered section before backfilling and restoration.

7. Follow safety standards as per OHSAS 18001, ISO 9001 (2015), ISO 14001.

8. familiar with API 1104 - Welding of pipeline and related facilities.

E) Company name: Wellhead Equipment Engineers Pvt Ltd, Workshop -Vadodara and Site Office-Barmer

Working Period: August 2019 to up till date.

Designation: Mechanical Execution Engineer and Project Coordinator

Job responsibility:

1.Manufacturing of well testing equipment’se.g. Inline bath heater, choke manifold, surface safety valve.

2.Following various process during manufacturing like ss overlay, heat treatment, NDT testing .

3.Making COC for equipment’s (Certificate of compliance).

4.Final hydrotesting in front of client and hand over.

5.Maintenance of equipment during rental period.

6.Coordinate with client.

7.Recertification of equipment’s.

Salary Drawn

Rs 32000 per Month + Accommodation + Flooding

Salary Expected

As per company rules and Regulation

Language known

1.Fluently Speaking and Writing –English

2.Fluently Speaking and writing –Hindi

3.Fluently Speaking –Bengali

Computer Skills

1. Software Packages: SIMSCI PIPEPHASE 9.8, AutoCAD 2d and 3d modelling.

2. MS office

3. Platforms: Windows

In view of above sir, I truly believe that my qualification and experience make me a perfect candidate for the job.

I request you to give me an opportunity to learn and grow at your esteemed firm through this job role.

Best Regards

SAIKAT BANDOPADHYA



Contact this candidate