ERIC A. CORDERO
Block ** lot * Section ** Phase II Pabahay Muzon, San Jose del Monte, Bulacan
Contact No.: 092********
Position: Pipe Fitter / Fruit Farm Laborer
PERSONAL DATA:
Date of Birth : April 12, 1968
Place of Birth : Gen. Mc Arthur Eastern Samar
Religion : Roman Catholic
Civil Status : Married
Citizenship : Filipino
Height : 5’5”
Weight : 120 lbs.
Languages or Dialect : English, Tagalog and Waray
Person to notify
In case of Emergency : Lilia R. Cordero
Address : Blk 13 L 6 Sec. 16 Ph II Pabahay,
Muzon CSJDM Bulacan
Contact No. : 0916 - 4788 – 411
EDUCATIONAL ATTAINMENT:
Elementary : Gen. Mc Arthur Elementary School 1981
Secondary : Our Lady of Fatima Academy 1985
College : Eastern Samar State University 1992
WORK EXPERIENCE:
1.Company : Hyundai Engineering and Construction Co. LTD
Position : Pipe Fitter
Project Name : Satah Al Razboot (SARB) Plant Facilities
(Package 4)
Date : December 1, 2016 – November 28, 2018
Address : Satah Al Razboot (SARB) Plant Facilities
(Package 4) P.O. Box 95016 Abu Dhabi City, UAE
Job Description
1.Measure and cut the desired length of the pipe according to the drawing.
2.Clean and level the pipes after cutting
3.Start fit up and aligns the pipe fitting.
4.Square and level the fitting before tacking
5.After alignment fit up and fabricate the spool and fittings.
6.Cut and fabricate small sizes of pipes to suit field erection.
7.Install different kinds of valves and fittings.
8.Layout various sizes of pipes.
9.Fabricate different kinds and sizes of pipes as per drawing specification.
2. Company : Hyundai Engineering and Construction Co. LTD
Position : Pipe Fitter
Date : October 9, 2013 – November 13, 2014
Project Name : Ma’aden Alumina Refinery Project (SAMA)
Address : P.O box 77249 Al-Kobar 31952 KSA
Job Description
1. Line check if all equipment and piping connections are in good connection
Before starting the pressure test, leak test and inspection of all piping connection during pressure test.
2. Check and monitor condition temperature, pressure gauge, oxygen content, oil
tank level both receiving and washing tank.
3. Hydro testing of pipelines according to piping class, their limits and required
pressure.
4. Check the correct piping material based in isometric drawing as per requirements
and alignment as well.
5. Prepare schedule of valve testing.
6. Monitor production to ensure compliance with quality control and assurance
Standard.Supervision of all types of testing such as hydro test and pneumatic
test, pressure testing for pipeline system etc.
7. Fabrication and Installation of pipes,
8. Fabricate different kinds and sizes of pipes as per drawing specification.
9. Assigned on the installation of spools in refinery.
10. Install different kinds of valves and fittings.
11. Layout various sizes of pipes.
12. Cut and fabricate small sizes of pipes to suit field erection.
13. Assigned in shop to fabricate different sizes of pipes as per drawing.
14. Prepare and installation of different kinds and sizes of pipes for finish products in
the pipeline used in process area as well as the tank.
15. A team leader of the group.
3. Company : Daelim and Sazeh Construction Team
Position : Pipe Fitter
Date : March 8, 2012 – March 7, 2013
Project Name : South Pars Gas Development Phase 12, EPC 2
Address : Tombak Ghadim, 15 km to Kangan, Busher
Province, Islamic Republic of Iran
Job Description
1.Fabrication and Installation of pipes
2.Fabricate different kinds and sizes of pipes as per drawing specification.
3.Assigned on the installation of spools in refinery.
4.Install different kinds of valves and fittings.
5.Layout various sizes of pipes.
6.Cut and fabricate small sizes of pipes to suit field erection.
7.Assigned in shop to fabricate different sizes of pipes as per drawing.
8.Prepare and installation of different kinds and sizes of pipes for finish products in the pipeline used in process area as well as the tank.
9.A team leader of the group.
4. Company : Hyundai Engineering and Construction Co. LTD
Position : Pipe Fitter
Date : April 10, 2010 – November 15, 2011
Project Name : Qatar Fertilizer Company (QAFCO) 5 Expansion
Address : Project Mesaieed Industrial City, Doha Qatar
Job Description
1.Fabrication and Installation of pipes
2.Fabricate different kinds and sizes of pipes as per drawing specification.
3.Assigned on the installation of spools in refinery.
4.Install different kinds of valves and fittings.
5.Layout various sizes of pipes.
6.Cut and fabricate small sizes of pipes to suit field erection.
7.Assigned in shop to fabricate different sizes of pipes as per drawing.
8.Prepare and installation of different kinds and sizes of pipes for finish products in the pipeline used in process area as well as the tank.
9.A team leader of the group.
5. Company : Consolidated Contractor Company (C.C.C)
Position : Pipe Fabricator
Date : August 28, 2008 – October 17, 2009
Project Name : Khursaniyah Gas Plant Project (KGPP)
Address : Khursaniyah Jubail Kingdom of Saudi Arabia
Job Description
1.Fabrication and Installation of pipes
2.Fabricate different kinds and sizes of pipes as per drawing specification.
3.Assigned on the installation of spools in refinery.
4.Install different kinds of valves and fittings.
5.Layout various sizes of pipes.
6.Cut and fabricate small sizes of pipes to suit field erection.
7.Assigned in shop to fabricate different sizes of pipes as per drawing.
8.Prepare and installation of different kinds and sizes of pipes for finish products in the pipeline used in process area as well as the tank.
9.A team leader of the group.
6. Company : Consolidated Contractor Company (C.C.C)
Position : Pipe Fabricator
Date : September 28, 2007 – August 28, 2008
Project Name : Rabigh Olefin Plants Project (ROPP)
Address : Rabigh, Jeddah Kingdom of Saudi Arabia
Job Description
1.Fabrication and Installation of pipes
2.Fabricate different kinds and sizes of pipes as per drawing specification.
3.Assigned on the installation of spools in refinery.
4.Install different kinds of valves and fittings.
5.Layout various sizes of pipes.
6.Cut and fabricate small sizes of pipes to suit field erection.
7.Assigned in shop to fabricate different sizes of pipes as per drawing.
8.Prepare and installation of different kinds and sizes of pipes for finish products in the pipeline used in process area as well as the tank.
9.A team leader of the group.
7. Company : PC Valencia Construction
Position : Pipe Fabricator
Date : March 14, 2004 – December 16, 2006
Job Description
1.Responsible for set-up, lay-out and tack-up of various precision frame weldments and
brackets.
2.Ability to tack up structure to tight tolerance.
3.Ability to hold final required cosmetic finish with angle grinders and senders. Use five
ton crane in a safe manner. Essential “rigging” knowledge is necessary.
4.Install different kinds of valves and fittings.
5.Layout various sizes of pipes.
6.Cut and fabricate small sizes of pipes to suit field erection.
7.Assigned in shop to fabricate different sizes of pipes as per drawing.
8.Prepare and installation of different kinds and sizes of pipes for finish products in the pipeline used in process area as well as the tank.
9.A team leader of the group.
8. Company : Asian Rolovoc Construction
Position : Pipe Fitter
Date : October 7, 1992 – October 28, 1994
Address : Blk. 5 Lot 3 Richtown Samal Subd. Lalawigan
Bataan
Job Description
1. Clean and level the pipes after cutting
2. Measure and cut the desired length of the pipe according to the drawing.
3. Start fit up and aligns the pipe fitting.
4. Square and level the fitting before tacking
5. After alignment fit up and fabricate the spool and fittings.
6. Cut and fabricate small sizes of pipes to suit field erection.
7. Assigned in shop to fabricate different sizes of pipes as per drawing.
8. Preparation and installation of different kinds and sizes of pipes for finish
products in the pipeline used in process area as well as the tank
9. A team leader of the group.