Post Job Free

Resume

Sign in

Pipe Fitter

Location:
Bulacan, Philippines
Posted:
June 01, 2021

Contact this candidate

Resume:

ERIC A. CORDERO

Block ** lot * Section ** Phase II Pabahay Muzon, San Jose del Monte, Bulacan

Contact No.: 092********

Position: Pipe Fitter / Fruit Farm Laborer

PERSONAL DATA:

Date of Birth : April 12, 1968

Place of Birth : Gen. Mc Arthur Eastern Samar

Religion : Roman Catholic

Civil Status : Married

Citizenship : Filipino

Height : 5’5”

Weight : 120 lbs.

Languages or Dialect : English, Tagalog and Waray

Person to notify

In case of Emergency : Lilia R. Cordero

Address : Blk 13 L 6 Sec. 16 Ph II Pabahay,

Muzon CSJDM Bulacan

Contact No. : 0916 - 4788 – 411

EDUCATIONAL ATTAINMENT:

Elementary : Gen. Mc Arthur Elementary School 1981

Secondary : Our Lady of Fatima Academy 1985

College : Eastern Samar State University 1992

WORK EXPERIENCE:

1.Company : Hyundai Engineering and Construction Co. LTD

Position : Pipe Fitter

Project Name : Satah Al Razboot (SARB) Plant Facilities

(Package 4)

Date : December 1, 2016 – November 28, 2018

Address : Satah Al Razboot (SARB) Plant Facilities

(Package 4) P.O. Box 95016 Abu Dhabi City, UAE

Job Description

1.Measure and cut the desired length of the pipe according to the drawing.

2.Clean and level the pipes after cutting

3.Start fit up and aligns the pipe fitting.

4.Square and level the fitting before tacking

5.After alignment fit up and fabricate the spool and fittings.

6.Cut and fabricate small sizes of pipes to suit field erection.

7.Install different kinds of valves and fittings.

8.Layout various sizes of pipes.

9.Fabricate different kinds and sizes of pipes as per drawing specification.

2. Company : Hyundai Engineering and Construction Co. LTD

Position : Pipe Fitter

Date : October 9, 2013 – November 13, 2014

Project Name : Ma’aden Alumina Refinery Project (SAMA)

Address : P.O box 77249 Al-Kobar 31952 KSA

Job Description

1. Line check if all equipment and piping connections are in good connection

Before starting the pressure test, leak test and inspection of all piping connection during pressure test.

2. Check and monitor condition temperature, pressure gauge, oxygen content, oil

tank level both receiving and washing tank.

3. Hydro testing of pipelines according to piping class, their limits and required

pressure.

4. Check the correct piping material based in isometric drawing as per requirements

and alignment as well.

5. Prepare schedule of valve testing.

6. Monitor production to ensure compliance with quality control and assurance

Standard.Supervision of all types of testing such as hydro test and pneumatic

test, pressure testing for pipeline system etc.

7. Fabrication and Installation of pipes,

8. Fabricate different kinds and sizes of pipes as per drawing specification.

9. Assigned on the installation of spools in refinery.

10. Install different kinds of valves and fittings.

11. Layout various sizes of pipes.

12. Cut and fabricate small sizes of pipes to suit field erection.

13. Assigned in shop to fabricate different sizes of pipes as per drawing.

14. Prepare and installation of different kinds and sizes of pipes for finish products in

the pipeline used in process area as well as the tank.

15. A team leader of the group.

3. Company : Daelim and Sazeh Construction Team

Position : Pipe Fitter

Date : March 8, 2012 – March 7, 2013

Project Name : South Pars Gas Development Phase 12, EPC 2

Address : Tombak Ghadim, 15 km to Kangan, Busher

Province, Islamic Republic of Iran

Job Description

1.Fabrication and Installation of pipes

2.Fabricate different kinds and sizes of pipes as per drawing specification.

3.Assigned on the installation of spools in refinery.

4.Install different kinds of valves and fittings.

5.Layout various sizes of pipes.

6.Cut and fabricate small sizes of pipes to suit field erection.

7.Assigned in shop to fabricate different sizes of pipes as per drawing.

8.Prepare and installation of different kinds and sizes of pipes for finish products in the pipeline used in process area as well as the tank.

9.A team leader of the group.

4. Company : Hyundai Engineering and Construction Co. LTD

Position : Pipe Fitter

Date : April 10, 2010 – November 15, 2011

Project Name : Qatar Fertilizer Company (QAFCO) 5 Expansion

Address : Project Mesaieed Industrial City, Doha Qatar

Job Description

1.Fabrication and Installation of pipes

2.Fabricate different kinds and sizes of pipes as per drawing specification.

3.Assigned on the installation of spools in refinery.

4.Install different kinds of valves and fittings.

5.Layout various sizes of pipes.

6.Cut and fabricate small sizes of pipes to suit field erection.

7.Assigned in shop to fabricate different sizes of pipes as per drawing.

8.Prepare and installation of different kinds and sizes of pipes for finish products in the pipeline used in process area as well as the tank.

9.A team leader of the group.

5. Company : Consolidated Contractor Company (C.C.C)

Position : Pipe Fabricator

Date : August 28, 2008 – October 17, 2009

Project Name : Khursaniyah Gas Plant Project (KGPP)

Address : Khursaniyah Jubail Kingdom of Saudi Arabia

Job Description

1.Fabrication and Installation of pipes

2.Fabricate different kinds and sizes of pipes as per drawing specification.

3.Assigned on the installation of spools in refinery.

4.Install different kinds of valves and fittings.

5.Layout various sizes of pipes.

6.Cut and fabricate small sizes of pipes to suit field erection.

7.Assigned in shop to fabricate different sizes of pipes as per drawing.

8.Prepare and installation of different kinds and sizes of pipes for finish products in the pipeline used in process area as well as the tank.

9.A team leader of the group.

6. Company : Consolidated Contractor Company (C.C.C)

Position : Pipe Fabricator

Date : September 28, 2007 – August 28, 2008

Project Name : Rabigh Olefin Plants Project (ROPP)

Address : Rabigh, Jeddah Kingdom of Saudi Arabia

Job Description

1.Fabrication and Installation of pipes

2.Fabricate different kinds and sizes of pipes as per drawing specification.

3.Assigned on the installation of spools in refinery.

4.Install different kinds of valves and fittings.

5.Layout various sizes of pipes.

6.Cut and fabricate small sizes of pipes to suit field erection.

7.Assigned in shop to fabricate different sizes of pipes as per drawing.

8.Prepare and installation of different kinds and sizes of pipes for finish products in the pipeline used in process area as well as the tank.

9.A team leader of the group.

7. Company : PC Valencia Construction

Position : Pipe Fabricator

Date : March 14, 2004 – December 16, 2006

Job Description

1.Responsible for set-up, lay-out and tack-up of various precision frame weldments and

brackets.

2.Ability to tack up structure to tight tolerance.

3.Ability to hold final required cosmetic finish with angle grinders and senders. Use five

ton crane in a safe manner. Essential “rigging” knowledge is necessary.

4.Install different kinds of valves and fittings.

5.Layout various sizes of pipes.

6.Cut and fabricate small sizes of pipes to suit field erection.

7.Assigned in shop to fabricate different sizes of pipes as per drawing.

8.Prepare and installation of different kinds and sizes of pipes for finish products in the pipeline used in process area as well as the tank.

9.A team leader of the group.

8. Company : Asian Rolovoc Construction

Position : Pipe Fitter

Date : October 7, 1992 – October 28, 1994

Address : Blk. 5 Lot 3 Richtown Samal Subd. Lalawigan

Bataan

Job Description

1. Clean and level the pipes after cutting

2. Measure and cut the desired length of the pipe according to the drawing.

3. Start fit up and aligns the pipe fitting.

4. Square and level the fitting before tacking

5. After alignment fit up and fabricate the spool and fittings.

6. Cut and fabricate small sizes of pipes to suit field erection.

7. Assigned in shop to fabricate different sizes of pipes as per drawing.

8. Preparation and installation of different kinds and sizes of pipes for finish

products in the pipeline used in process area as well as the tank

9. A team leader of the group.

“I hereby certify that the above statements are true and correct to the best of my ability, knowledge and belief.”

ERIC A. CORDERO

Applicant



Contact this candidate