David Clear
Supervisor v
Qualification Highlights,
Key Achievements and
Experiences
Accident Prevention Training
Mobile Crane Operator Company Trained
Aerial Trained
Basic Rigging
Scaffold Competent Person Trained
Fire Protection Trained
Fall Protection and Prevention
Managing Risk (What Can Hurt Us)
Provide Safe Work Environment
Read Understand and Use Engineer Drawings
Maintain Accountability of tools, Equipment and Materials
Teach and Employ Company Construction Safety Policies and
Procedures
‘And Training High Schoo! Diploma Equivalent
Languages English
2012 -Present Tarsco Construction Corp
2 cPreesn Foreman — New Tank Construction
Trafigura-Buckeye
Built 185 Dia. x 60 ‘API 650 Internal Floating Roof
105' Dia, API 650, LPG API 620 Low Pressure Liquid Storage Tank
Tank 150 Dia. X 68" High Air Raised Dome Roof
180 Dia, X 60" API 650 Tanks
Atec Steel
2010-2012 Pusher! Lead man
Work Performed
Standard Flat Bottom Open Top, Flat Bottom with internal Floating Roof,
Pressure Vessels
Different Procedures of Erecting Tanks
Deck Erection on Scaffold or Stands; Roof Erection with Tugger
2010-2008 Chlesge Bridge & tron Company
Valoro Houston TX
‘API 650 Tank 100 ft. Dia. X 60' Floating Deck, API 650 250 ‘Dia, X 60’
Jonesboro, AR.
Built 7 - API 650 200' Dia. X 60’ Tank with Floating Decks
Channelview Houston TX
300 Dia. X 60’ with Floater, API TES 110 Dia x 150
3- 200 x 60’ Floater API 650 Tank, 180 x 60 ‘API 650 Tanks
f Move to Archive
4 Ee el ci