Post Job Free
Sign in

Welder fitter operator sub arc stick mig tank builder

Location:
Baytown, TX
Salary:
Top pay
Posted:
June 20, 2021

Contact this candidate

Resume:

David Clear

Supervisor v

Qualification Highlights,

Key Achievements and

Experiences

Accident Prevention Training

Mobile Crane Operator Company Trained

Aerial Trained

Basic Rigging

Scaffold Competent Person Trained

Fire Protection Trained

Fall Protection and Prevention

Managing Risk (What Can Hurt Us)

Provide Safe Work Environment

Read Understand and Use Engineer Drawings

Maintain Accountability of tools, Equipment and Materials

Teach and Employ Company Construction Safety Policies and

Procedures

‘And Training High Schoo! Diploma Equivalent

Languages English

2012 -Present Tarsco Construction Corp

2 cPreesn Foreman — New Tank Construction

Trafigura-Buckeye

Built 185 Dia. x 60 ‘API 650 Internal Floating Roof

105' Dia, API 650, LPG API 620 Low Pressure Liquid Storage Tank

Tank 150 Dia. X 68" High Air Raised Dome Roof

180 Dia, X 60" API 650 Tanks

Atec Steel

2010-2012 Pusher! Lead man

Work Performed

Standard Flat Bottom Open Top, Flat Bottom with internal Floating Roof,

Pressure Vessels

Different Procedures of Erecting Tanks

Deck Erection on Scaffold or Stands; Roof Erection with Tugger

2010-2008 Chlesge Bridge & tron Company

Valoro Houston TX

‘API 650 Tank 100 ft. Dia. X 60' Floating Deck, API 650 250 ‘Dia, X 60’

Jonesboro, AR.

Built 7 - API 650 200' Dia. X 60’ Tank with Floating Decks

Channelview Houston TX

300 Dia. X 60’ with Floater, API TES 110 Dia x 150

3- 200 x 60’ Floater API 650 Tank, 180 x 60 ‘API 650 Tanks

f Move to Archive

4 Ee el ci



Contact this candidate