Education and Credentials
August ****- May ** Oak Grove High School San Jose, CA.
GED CERTIFICATE
Objective: Looking for a dynamic position in a construction Company where I can apply all my constructive skills and experience toward an opportunity with professional growth. I have over 13 years in the Oil and Gas Industries within the E & I discipline. I have worked within the heavy industrial market place, where the plant work was 60% new construction and 40% maintenance. When joining a team I am dedicated to providing you a strong support system to ensure our success. I have the leadership and skills to become an immediate impact player.
Work Duties and Responsibilities
I routinely completed maintenance tasks 48% faster than industry average. Comprehensive experience in the repair and maintenance of motors, control panels, and major electrical systems, including circuit breakers, feeders, coils and relays. Maintained and tracked records for quality work and effective project management delivering 90% of projects on time and within budget. Installed major equipment, field devices according to specifications and standards. Meet with customers to determine expectations and followed up to measure satisfaction levels. I have extensive knowledge with NEC 2014, NFPA 70E, and ANSI.
Work History /Summary
Triad Electric & Controls Feb 2019 to Feb 2020 Journeyman
Read Isometric Drawings, One Line Diagrams, Distribution Panel Drawings, Cable Schedule Drawings. Installed cable trays, conduit raceways, and supports Pulled power cables, communication wires, and grounding cables Terminated power, communication wires in Panels and electrical devices, motors, instruments, and start/stops
Install bus ducts for control room and PLC's
Jacobs Aug 2015 to Jan 2019 Journeyman/Electrical Foreman
Discussed with E & I Project Manager the delivery date of next units to be installed and drawings. Responsible for multiple crews, Conduit/Cable Tray installation, installing equipment, Service Panels, Installing/Repair, Motors, Lighting Systems, Electrical Systems Layout, Wire Pulling, Layout/Install Electrical Boxes, Sub Panels, Light Fixtures, Transformer configuration & operate various lifts. Responsible for inspection as well as deep underground installations and slab on grade installations. Hot work Installations and all wire terminations to be according with project standards and specs. Supplied progress and look ahead reports to clients. Arranged with QA/QC leads to finish projects. Arranged for proper safety training for personnel on site, as well take off materials and tools as needed.
WJ Electric April 2011 to July 2015 Electrical Foreman
Responsible for daily progress reports, field materials requirements, update drawing revisions, crew timesheets, troubleshooting/diagnostics, Schedule activities for Safe Operating, QA/QC inspections as needed. Weekly Supervised Meetings, assign activities to Subordinates / Subcontractors and Safety Training. Responsible for multiple crews, Conduit/Cable Tray installation, installing equipment, Service Panels, Installing/Repair, Motors, Lighting Systems, Electrical Systems Layout, Wire Pulling, Layout/Install Electrical Boxes, Sub Panels, Light Fixtures, Transformer configuration & operate various lifts. Responsible for inspection as well as deep underground installations and slab on grade installations
P2S/MMR Jan 2007 to March 2011 Apprentice/I&E Journeyman
Read Isometric Drawings, One Line Diagrams, Distribution Panel Drawings, Cable Schedule Drawings. Installed cable trays, conduit raceways, and supports Pulled power cables, communication wires, and grounding cables Terminated power, communication wires in Panels and electrical devices
Install Electrical Heat Trace, Mineral Insulated Heat Trace and Steam Trace
Assist Electrical Journeyman, with installation of cable trays and grounding. Assist with set up of tools and fabrication table, housekeeping and any other way possible