Post Job Free

Resume

Sign in

Air Compressor Maintenance Supervisor

Location:
Maharashtra, India
Salary:
9 to 10 lakh per annum
Posted:
May 31, 2021

Contact this candidate

Resume:

Resume

Devi Prasad Yadav

Email id admub7@r.postjobfree.com

Correspondence Address: - C12/504 Sahara city home Lucknow

Phone. Number. 790-***-****

Objectives

To secure a position in a reputed organization with potential for challenge and fulfillment where

there is an opportunity for further advancement and responsibility.

With the zeal to develop my carrier with the company & apply my skills to develop the company.

Educational Qualification details. -

•Passed out Diploma in Electrical Engineering from Board of technical education Uttar

Pradesh securing first division mark. In 2003

•Passed out Intermediate from Govt. inter collage Allahabad. Securing second division in 1999.

•Passed out High school from Govt. inter collage Allahabad securing first division in 1997.

Work Experience Total More than 16 year

1.Presently working with M/S Shapoorji Pallonji & co. Pvt. Ltd. As P&M in charge at Shapoorji Pallonji Vicinia Project Pawai Mumbai.

Previous project details of shapoorji pallonji & co. Pvt. Ltd.

Project name – Avas vikas project – 16 May 2016 to 15 march 2020.

. Project cost- 240 cr

Project completion time- 04 year

Project name -DLF Garden City, Lucknow – 04th July 2012 to 15 may 2016.

. Project cost- 140 cr

Project completion time- 03 year

Tata Motors, Lucknow. – 03rd Nov 2009 to 03rd July 2012

Project cost- 650 cr

Project completion time – 03 year

DLF Cyber City, Gurgaon –17th May 2006 to 02nd Nov 2009.

Project cost-400cr

Completion time-04 year

2.Worked with Reliance Industries Jamnagar from August 2005 to April 2006 as Maintenance supervisor.

3.Completed one year training with M/s Eveready Industries India Limited Phase-II, Sec -82, Noida. from 25th June 2004 to 24th May 2005.

Responsibilities:

All SAP related work.

Installation, commissioning and testing of transformer, D.G. sets, street light poles, cable lying as per drawing, H.T. and L.T. panels, A.P.F.C. panel, H.T. and L.T. Motors, air circuit breakers, Vacuum circuit breakers .fault finding in control panels, electrical panels and automation panels.

● Vendor selection, checking of contractors bills..

● PLC programming and different type sensors setting.

● Makes inventory of spares, maintenance schedule, MIS, PMV status report, etc.

Fault finding in control panel, transformers, H.T. & LT panels, Switch gears, Air circuit breakers, vacuums circuit breakers, H.T. & L.T. motors, D.G. sets, invertors, prepare the maintenance schedule of major & minor equipment.

Makes the inventory plan of spares & indenting the spares in ERP system.

Maintain the ISO documentation for internal and external audit.

Job Profile:

Sound Knowledge of Fault Finding in Automation, control panel construction equipment.

Draw layout plan of power distribution systems according the project.

P.L.C. Programming and different type’ s sensors setting.

Erection and commissioning of H.T, L.T. panels, motors & Transformers.

Repair & maintenance of following electrical, Mechanical & Electronics equipment’ s/instruments – Motor vision rely, Auto voltage regulator, AC Drive, Rectifier welding machines, Proximity sensors, Photo Electric Sensors, Invertors, transformers, Circuit breakers, Electrical Concrete Pump, Vacuum pumps, Water Pump, Batching Plant,D.G Set, ETP,RO plant, Cooling Towers, Compressors, concrete pumps, Tower crane, passenger hoist, hydra crane, transit mixer, RM-800, monkey hoist,Builder hoist, electrical & mechanical earth compactor,air compressor, Bar bending & cutting machine, different type ups, JCB, and other different type construction equipment’s.

Handling contractors, sub-contractors & checking the bills.

Erection and commissioning of Batching plant CP-30, Simen-120 &Tower crane

Key Result Areas

Planning, power distribution, fault finding in electrical control panels, fault finding in Construction major & miner equipment,

.

Site management

Supervising on site construction activities to ensure the operations are carried out smoothly and resource are effectively utilized maximum output.

Visiting the site regularly, during the course of construction to check proper implementation of

Design.

Preparing and reviewing of method statements and work specific quality, control plans.

Resource management

Coordinating with structural, civil Engineers, quality engineers and other service consultants.

Preparing the program of project for successful and timely completion.

Ensuring the complains of site requirement and provide the solution.

Done Leadership & Time Management training

Leading mentoring, monitoring the performance of the team to ensure efficacy in process operations & meeting of individual group targets.

Creating & sustaining a dynamic environment that fosters development opportunities & motivates high performance amongst team members.

Personal Details:

Father’ s Name

: Late Shri Ram Sevak Yadav

Date of Birth

: 15th Aug, 1982

Nationality

: Indian

Religion

: Hindu

Marital Status

:

married

Language Known

: Hindi & English

Hobby

: Swimming,

Date :

Place: DEVI PRASAD YADAV



Contact this candidate