Steven Thorn
*** *** **** **. *******, AR. ****1 501-***-****) **********@*****.***
Professional Summary: Management of on-site activities, coordination of all workers on the job site. Reviewed job specifications, blueprints and data to manage projects. Selected, hired, supervised subcontractors as needed and collaborated with all employees to strive for “Zero” accidents. Ensured compliance with all permit requirements, building codes and safety guidelines. Involved in selection of materials, vendors, budgets and scheduling. Provided my expertise in power generating construction projects to start-up high voltage electrical system and substations.
Experience:
Owner Thorn Electric
(11/12-Current) 233 New Home Rd. Quitman, AR. 72131
Manage electrical company for Commercial, residential and industrial work.
1.Residential service calls
2.Commercial work including: McDonald’s, VFW, Sketchers, Funeral Homes, Etc.
3.Sitting utility poles, transformers and transmission lines for Co-op. Inspected poles and transmission lines to insure they were fit for application.
4.Start-up of high and medium voltage electrical system and substation
5.Consulted personnel with transmission lines, inter-connect systems, switchgear installations, electrical circuits, power quality and high voltage collection and distribution systems.
6.High voltage duct bank installation
7.Have managed crews to ensure work was completed correctly, on time and in a safe and secure environment.
Construction Management
(05/10-11/12) Bishop Crites Funeral Services Greenbrier, Ar. 72058
1.Scheduled the project in logical steps and budgeted time required to meet deadlines
2.Determined labor requirements and dispatched workers to construction site
3.Inspected and reviewed project to monitor compliance with building and safety codes
4.Interpreted and explained plans
Project Supervisor
(08/07-05/10) Spears Construction Guy, AR. 72061
1.Coordinated labor needs and trained employees
2.Facilitated the purchase and delivery of resources
3.Made sure the clients’ needs were met.
4.Made sure project was completed on time, on budget and in a safe environment.
General Foreman
(09/00-08/07) Stone & Webster Russellville, AR. 72801
Oversaw and managed steam generator change outs on unit one and two,
Main switch gear change out, 500 KV Transformer change out.
1.Safety
2.Prepared daily job reports and daily job schedules
3.Coordinated and prepared job schedules, civil work and excavation
4.Insured job schedules were met and that my men had the right tools and materials for the project
5.Prepared daily site management reports with Microsoft office program
6.Kept daily inventory of material
7.Monitored employee hours
Apprentice:
(07/95-05/00) NJATC Little Rock, AR. 72203
Assisted journeyman in preparing for daily jobs by gathering materials, etc.
Ran pipe and wire
Education: NSATC
2500 S University Little Rock, AR. 72203
(07/95-05/00)
Master Electrician: Arkansas Masters license # M-8266
Class B CDL
Windows 7, Microsoft office suite 2007 & 2010
Guy-Perkins High School
Guy, AR. 72061
(Graduated 05/95)
References:
Harold Weatherford III-Construction Manager
1866 Colonial Village Lane
Suite 112
Lancaster, PA. 17601
Cell: 479-***-****
************@************.***
Randy Spears-Construction
200 S Bolden Hill Rd.
Greenbrier, AR. 72058
Office: 501-***-****
Robert Smith-Project Manager
269 S Bolden Hill Rd.
Greenbrier, Ar. 72058
Cell: 501-***-****
******.*****@*******.***