Post Job Free
Sign in

Industrial Engineering Quality Assurance

Location:
West Haven, CT
Salary:
60000
Posted:
May 27, 2021

Contact this candidate

Resume:

Ashish Prajapati

**** ******** ******,

West Haven, CT-06516

admq1i@r.postjobfree.com 203-***-**** https://www.linkedin.com/in/prajapati-ashish-207339114/

Graduate Industrial engineering student passionate about Quality Assurance and Quality Control and proficient using techniques like Minitab, R-studio, ARENA, Microsoft Word, Excel, and PowerPoint and experienced in lean Six Sigma, Supply chain, Quality Analysis, Design of Experiments and Manufacturing processes seeking a full-time opportunity that can enhance my quality, manufacturing, and analytical skills in Quality Engineering position for my future role.

EDUCATION

University of New Haven, West Haven, CT May 2021

Tagliatela College of Engineering

Master of Science, Industrial Engineering (Cumulative GPA: 3.37)

Descript & Inferential Statistics, Quality Analysis, Design of Experiment, Supply chain Analysis, Data Analytics

Leelaben Dashrathbhai Ramdas Patel-Institute of Technology & Research, India May 2019

Mechanical Engineering Department

Bachelor of Science, Mechanical engineering (Cumulative GPA: 3.3)

Mechanical Engineering

SKILLS

Computer skills: Microsoft Word, Excel, and PowerPoint

Technical skills: Minitab, R-studio, ARENA, Statistical Process Control, Root Cause Analysis, Quality Control, Failure Mode and Effect Analysis (FMEA), 5S

WORK EXPERIENCE

Technical Intern, Indian Farmers Fertilizers Co-operative Limited, Gujarat, India May 2018

Experience working with Turbines, Pumps, Boilers and Cooling systems and provided technical assistance as a leader of the group which involved using CNC machines, Surface Finishing processes, Lathe machines and Press machines used in the Production Industries. Handled major manufacturing and quality activities involving batch testing, validation of the processes, lot-to-lot verification and quality data analysis and management.

ACADEMIC PROJECTS

1.Airless Pump May 2018

Designed a novel pump to alleviate the time for deburring in some areas of pump. Identification of the defects in the working mechanism of the pump in some parts like motor, to improve and enhance the functioning of the pump which is less prone to errors. Rebuilding and validating the critical burr occurring areas of the vacuum pumps to shorten the deburring time.

2.Vella Flow Machine May 2017

Investigation of the application of glaze with different velocities on different tiles and ensure the function of machine practically and to augment the efficiency of the machine. Analysed several methods and increased the efficiency of the machine by 5%. Insinuation of the lean principles was found to improve the productivity of the machine by 20%.



Contact this candidate