Post Job Free

Resume

Sign in

General Foreman Site Superintendent

Location:
Qatar
Posted:
May 26, 2021

Contact this candidate

Resume:

Curriculum Vitae

Personal

Nationality Lebanese

Date of Birth: 21 / 01 / 1971 Marital Status: Married

Contact Leb. Residence +961-*-******

Qatar Mobile +974-********

admpnw@r.postjobfree.com

Education

1991 – 1994 TS (Technique Superieur ) in civil engineering

1988 – 1991 BT ( Bac Technique ) Dessin D’Architecture

Ecole Technique De La Sagesse

Languages

Arabic Spoken & Written

French Spoken & Written

English Spoken & Written

Professional Experience

2019 – Present QD – SBG. Doha, Qatar

Project Lusail Plaza (infrastructure/Public car park & Landscape)

Position Held Construction Manager – Infrastructure.

Responsibilities in-charge of the Infrastructure activities (Civil & MEP).

2018 - 2019 QD - SBG. Doha, Qatar.

Project Internal Security Force head quarter.

Position held. Sr. Superint'd Civil.

Responsibilities In-charge 7 general stores.

General Civil works.

General finishing.

2017 – 2018 Consolidated Contractors Company, Kingdom Of Saudi Arabia

Project Riyadh Metro Project

Position Held Sr. Superintendent Civil / Elevated Stations

Responsibilities

General Finishing / Fit out (Gypsum false ceiling / Cladding /

Flooring / Nosing structure / Painting.

General Civil Works.

General utilities (Piping)

2015 – 2017 Consolidated Contractors Company, Kingdom Of Saudi Arabia.

Project Jizan Refinery & terminal Project.

Jizan Refinery Utilities Project (JRUP).

Position Held Sr. Superintendent (Section Head)

Responsibilities

ISBL (Inside Battery Limits).

Buildings turnkey Earthworks / General Concrete/

Finishing (Block works/plastering/painting/Gypsum false

Ceilings/Accessories/Flooring.

OSBL (Outside Battery Limits).

Earthworks:

All kind of Piping Activities + bedding & padding.

Electrical Trenches + Duct Banks

Instrument Trenches (Telecom & CCTV) + Ducting.

Structure:

Culverts, Manholes, V-Ditch, U-Ditch, Duct Banks, Road Crossing and Installing of concrete pipes.

(Shuttering, Reinforcement and Concreting)

Piping:

RC Pipe (Reinforcement Concrete Pipe)

Excavation, Bedding, Installation, Padding & Final

Backfilling.

2014 – 2015 Consolidated Contractors Company, Nigeria Anambra State.

Project Aguleri Road and Bridge for Rig Oil

Position Held Site Superintendent (Section Head)

Responsibilities Mobilization of the Main Offices, PMV,

Site Facilities (Precast, Steel Yard, Cement conveyor and

Batching Plant)

In-charge of the precast yard for the bridge ( I Beam, Parapets

And Cover Slabs) Steel Yard.

Batching Plant (Operational) for the bridge and all Anambra

State projects as delivering ready mix concrete.

2013 – 2015 Consolidated Contractors Company, Nigeria Delta State.

Project OSUBI Int, Airport / EFFURUN FLYOVER.

ASABA FLYOVER support for 3 months of the precast

Position Held Site Superintendent (Section Head)

Responsibilities: precast yard of the Flyover.

Steel Yard / Cutting & Bending for the Airport & the Flyover

Batching Plant Operational for the Airport & flyover

2012 – 2013 Consolidated Contractors Company, Papua New Guinea Project PNG – LNG (Papua New Guinea – Liquid Natural Gas Plant)

Position Held Site Superintendent (Section Head)

Responsibilities: OFF-SITE 30 / BOG (Boil Of Gas)

OFF-SITE 40 / LNG TANKS

OFF- SITE 52 / Retention Pond

Scope Of Work: General construction and supervision.

Activities Sub-structure, underground piping infra-structure.

(Sub-Station, Pipe Rack, Pipe Sleepers, Misc. Found.)

2010 – 2012 Consolidated Contractors Company, Papua New Guinea

Project Komo Airfield Project

Position Held Site Superintendent (Section Head)

Responsibilities: Infra-structure & Under Ground Piping of the

Site facilities (Main Camp, Stores, PMV and workshop)

Construction of the BATCHING, ASPHALT PLANT &

DIESEL FUEL FARM. (General)

2009 – 2010 Consolidated Contractors Company, Kingdom Of Saudi Arabia

Project Princess Noura University for Women / Riyadh (PNUFW)

Position Held Site Superintendent (Section Head)

Responsibilities: Electrical Infra-Structure (Civil Works)

Telecom. Conduits, Medium Voltage, Low Voltage

CCTV & Street Lighting, as well Building structural

(Data Centre, Mosque and Admin, Build.)

Scope of Work: Planning, Split of activities, following the engineering. Activities : Excavation, Bedding, Direct Buried Duct, Concrete

Encased Duct, Padding, Backfilling, Installing Manholes.

Reporting Direct To the Construction Manager.

Manpower : 2 Jr. Engineers, General Foreman, 7 Foremen, 16 Charge Hand.

220 Labours.

2008 – 2009 Consolidated Contractors Company, Kingdom Of Saudi Arabia

Project Khafji Field Development Project / Khafji ( KFDP )

Position Held General Foreman (GF/M Civil / Mech.)

Responsibilities: Under Ground Piping General Services

Excavation, Bedding, Piping, Alignment, Levelling of Fire Water

(RTR) & Drinking / Utility Water (UPVC).

Road Crossing, Duct Bank, Pipe Encasement, Thrust Blocks

Hydro-Testing, Test Packages, Loop Test, Gravity & Leak Test.

2006 – 2008 Consolidated Contractors Company, Kingdom Of Saudi Arabia

Project Hawiya NGL Recovery Plant Project / Hawiya (HNRP)

Position Held General Foreman (GF/M Civil / Mech.)

Responsibilities: 3 industrial build. (Sub-Station, PIB & TMB)

Shuttering, Concreting Works (Walls up to 7m Height + Slab)

Earth Works / Giving Support.

General Concreting, Grouting & Coating.

Water Well 4 Nos. (Sub-Structure, Found. & Fencing)

Under Ground Piping / Hydro-Testing

Above Ground Hydro-Testing SS & CS Pipes.

2005 – 2006 Consolidated Contractors Company, Bahrain

Project Low Sulphur Diesel Plant / Bahrain (LSDP)

Position Held General Foreman (GF/M Civil)

Responsibilities: Project Site Facilities (Fab. Shop 2 Nos. PMV & Site Main Store)

Completed In 40 Calendar Working Days.

Under Ground General Services

General Excavation, Bedding & Back Filling

Concreting, Pipe in-casement, Road Crossing, Electrical Trenches

Installing of Manholes, Marking & Levelling.

Pre-cast Yard / General Foundations.

2003 – 2005 Kappa General Contracting LLC, Abu Dhabi UAE

Project 5 Residents Villas (Abu Dhabi & Al Ain)

Position Held Managing Partner

Responsibilities: Owner of 49% from the company, In-charge of the estimation

& tenders of the projects, Materials, execution of work,

Representative of the company for the consultant, abu dhabi

Private authority loans.

Company’s Employees & Manpower:

2 Site Engineers, Financing Manager, PRO Officer.

2 Foremen, 60 Labours, 2 LD Driver.

2002 – 2003 Amana Steel Buildings Contracting Company ( Zamil Steel )

Abu Dhabi UAE

Project Office Building & 2 Stores for Defence Military

Position Held Project Engineer

Responsibilities: Managing & executing the above projects

2001 – 2002 SODAP UAE (Building Materials, Group LAFARGE)

Position Held Product Manager (Pre-Mix Plaster & Gypsum)

Responsibilities: Following the production @ the factory

Sales & Marketing.

1999 – 2001 Consolidated Contractors Company, Abu Dhabi UAE

Project Gas Development 2 – Gas Gathering System & Trunk Lines

Position Held Site Supervisor (Civil)

Responsibilities: In-Charge of the Pre-Cast Yard, 3 Stations & 20 Gas Well

General Construction.

1998 – 1999 Consolidated Contractors Company, Abu Dhabi UAE

Project Ruwais Refinery Expansion Project (RREP)

Position Held Site Supervisor (Civil)

Responsibilities: Process area (General Civil)

Excavation, Shuttering, Steel Fixing & Concreting of

General foundations & pumps, including the pavement works

1997 – 1998 Consolidated Contractors Company, Kingdom Of Saudi Arabia

Project Saudi Arabia Fertilizer Company Project / Jubeil ( SAFCO 2 )

Position Held Site Supervisor (Civil)

Responsibilities: 2 industrial Buildings (Sub- Station)

General Execution, walls up to 8m height + Slab

1996 – 1997 Consolidated Contractors Company, Lebanon

Project Sibleen Cement Factory, 2nd Production Line / Sibleen

Position Held Site Supervisor (Civil)

Responsibilities: 2 industrial buildings (Bagging & Shipping)

General Execution.

1995 – 1996 Bassam Mattar Architectural Design & Consultancy, Lebanon

Project Notre Dame University New Campus / Zouk Mosbeh

Position Held Senior Site Representative

Responsibilities: General Consultancy @ site with full supervision of the

Work execution

1992 – 1995 Wakim Trading & Commerce, Lebanon

Project 2 Commercial Centres / Mansourieh

Position Held Assistant Architect

Responsibilities: Shop Drawing & Quantity Surveying

Skills: Computer Knowledge (Microsoft Word, Excel)

References available upon request



Contact this candidate