Foy Preston Hodge

**** ****** **. *. 239-***-**** Home

Lehigh Acres, FL. 33973 573-***-**** Cell

admpkt@r.postjobfree.com

Goal:

Provide leadership to the younger folks coming into the mechanical/industrial piping

field. With my 40 plus years of experience, I want to help pass on my experience to

the new folks coming because we need hands on training along with education. I were

semi-retired and discovered retirement in both boring and non-productive.

Education:

Graduated from Innis High School, Innis, LA. 1965

Honorable Discharged from U.S. Army, 1968

Completed Boilermaker Apprentice, 1973

Completed Steam Heat Boiler School, 1988

Completed Blueprint & Design, A.B.C. School, 1990

Completed Rigging & Rigging Safety, A.B.C. School, 1990

Occupational and Personal Betterment Training, 1994

OSHA Safety for Management 1994

Industrial Safety 1994

Safety for Supervisor Training 1995

Association of Reciprocal Safety Councils 1991 thru 2009

HAZWOPER Twenty-five Hour Course, 2001

NCCER - Industrial Pipefitter, 2006

PADI - Advanced Open Water Scuba Diver, Deep Diver, Night Diver

TWIC - Card issued 02/2008

Passport 12/2005 (U.S. Dept. of State)

V T Level II Visual Inspector 1/13/2011

P T Level I Liquid Penetrant 10/05/2012

OSHA 10 07/15/2018

Work History:

03/11/2019 – current Maintenance Manager

Geo Secure Services

Moore Haven Correctional Facility

In charge of the physical plant. Everything other than the

human personal .Everything that comprise of buildings including

vehicles, mowers, forklift, A/C unit, boilers, etc.

04/02/2018-07/13/2018 Material Foreman

Robinson Mechanical Construction

Southern LNG – Kinder Morgan

Savanah, GA.

08/15/2016-04/01/2018 Estimator / Building Material Sales

Menards Home Improvement Center

1230 Maple St.

Farmington, MO. 63640

04/27/2016-06/08/2016 Mechanical Superintendent.

Plant Maintenance Construction

Prairie State Power Plant

Marissa, ILL.

Short Outage – Contract Position

09/28/14 - 01/02/15 Sub-Contractor Superintendent

Bilfinger/Westcon Industries

Contract under Aerotek

Dakota Prairie Refinery, Dickinson, ND

My duties was to manage the sub-contractors in the construction of a

of a crude oil refinery. Under my direction were painters, electricans,

Insulators, Tray Tower Boilermakers, and Scaffold Builders. I was

night superintendent over 138 employees.

07/14/14 - 09/17/14 Weekend Piping Supervisor

BAE Systems – Commercial Boat Division

Contract under NSC Tech Services

My duties were to supervise the Pipe Department on the weekend shift.

BAE Systems were building 4 oil well supply boats. These boats used the

latest technology. Total electric propulsion and bow thrusters.

All powered by 2-1000 HP Rolls Royce generators

03/16/14 - 07/05/14 Mechanical Field Engineer

TATA Consulting Engineer, Mumbi, India

Contract under TSC Personal, Atlanta, GA

Proctor & Gamble, Cape Girardeau, MO.

Under The direction of the TATA offshore team,

My duties were to Photo 105 fans used to remove

air from the product lines. Field draw ISO’s and equipment

location diagrams. ISO’s were of the ducts.

The Plant has 35 product supply fans providing the product

the lines. They had pumps supplying glue and AGM to the diaper

lines. This engineering was being done across the globe at all P&G

plants. All plants were working toward ISO 9000.

07/29/13 - 10/02/13 Mechanical Package Turnover Lead

Wanzek Construction- Aerotek

Cushing, OK. Keystone XL Pipeline

My duties was to oversee the building of mechanical

turnover package for the third party client, Bechtel.

We received documents from construction via QC/QA dept.

We checked for sign offs, then put ISO, P & ID, mechanical

vendor documents, pipe support info, paint and underground

coating inspection records, flange and equipment torque report etc.

09/04/12 – 11/14/12 Boiler Superintendent

ProEnergy Services (Field Services)

Holland Energy Generating Station

Holland, IL.

Cut out and replaced 30 plus valves, Refabbed

3 spool pieces, and replaced 3 P-91 chrome valves.

Inspected tube in header welds in 2 HSRG’s. (P.T. Inspections)

05/17/12 – 08/17/12 Piping Superintendent (ProEnergy Craft Services)

SNC – Lavalin Constructors Inc.

South Central Power Project

Anchorage, AK.

Superintendent over the night shift, Project was a Three on One,

(3 on 1). Natural gas fueled. Installed the piping on three OTSG’s,

CTG’s and STG along with BOP piping. Night shift doesn’t have any

warehouse support. We have to write and fill our own material

request. Write RFI’ and FCCR’s

04/07/11-05/17/12 Mechanical Craft Instructor (Aerotek)

BP – Husky Refining LLC

Oregon, Ohio (Toledo)

I was the mechanical (boilermaker) trainer. BP Refinery was

needing their in-house maintenance trained to take over the

maintenance being handled by outside contractors. My job

was to train their people

11/12/09 -04/04/11 Pipefitter Supervisor

Austal USA

JHSV # 1

Mobile, AL

6/2/08 - 11/12/09 Piping Superintendent

Critical Path Piping

Bechtel Corp. Power Div.

Trimble County Project, KY

Duties involved overseeing critical path piping and related equipment on 750 MW coal-fired. Systems included are main steam, auxiliary steam, cold reheat, hot reheat, boiler feed, turbine lube oil, oil cooling, and turbine sealing oil.

4/2/08 - 5/29/08 General Foreman - Steam Turbine

Black & Veatch - Zachry

West County Power Partners

Loxahatchee, FL.

Responsibility- Supervisor over steam turbine piping

and piping from the three HSGR Yee Valve header.

Prior to that I had the chrome fab yard

2/25/08 - 3/28/08 Mechanical Turnaround Coordinator

Pro Tech Engineering

Delaware City, DE

Contract position term of turnaround.

This was Lockwood – Green a union contractor.

Responsible for heat exchanges and furnaces. Six heat exchanges had to have the bundles pulled, jet cleaned, tested, reassembled, and pressure tested. One heat exchanger had to have the bundles pulled, tubes jet cleaned. Shell was UT/MT test and reassembled, tested, and recertified. Six overhead heat exchanges had all plugs removed and IRIS test on tubes. Plugs replaced and tested. One furnace had the burners replaced

and several leaking tubes had to be repaired.

10/30/07 - 2/5/08 Project Superintendent

Project Services Inc.

Atlas Pipeline Gas Plant, Sweetwater, OK.

Contract position term of project.

Over punch-out and package turnover at gas plant. In charge of P.S.I. employees plus sub-contract painters, E&I contractor, and site landscaping. Assist in equipment flushing and then assist with start-up.

7/2/07 - 2/15/07 General Foreman – Pipe

Total – Western Inc.

Paramount, CA.

Contract position term of project.

G.F. over Unit 2 for IEEC Power Plant in Romoland, CA.

My duty were overseeing four fitter supvs., one welding

supv., two rigging supvs. Plus progress bill packages.

2/8/07 - 7/17/06 Piping Superintendent

Casey Industrial

Norfolk, VA.

Responsibilities include fab pipe supports and all the pipe spool pieces, installing all hangers and supports. Design, install 17800 feet of pipe which transfers compressed air, natural gas, city water, chilled water, fuel, oil, and waste water thought out the entire plant.

11/14/03 - 1/15/06 Foreman – Pipe

Northrop Grumman Ship Systems (now Huntington Ingalls)

Pascagoula, MS. / Avondale, LA.

2003 Leave of absence due to the construction

of my new house and moving in.

10/19/02 - 3/02 H.R.S.G. Foreman

Black & Veatch - Zachry

French Camp, MS.

Responsibilities consist of overseeing 45 employees

on the erection of three Alstom HSRG ‘s (boilers).

3/02 - 3/01 Asst. Project Superintendent

Certified Power Systems

Middleboro, MA.

Contract position

Responsible for safety, Q.C., production,

and coordinating our subs as well as C.P.S.'s

pipefitters, millwrights, boilermakers, tube

and pipewelders, scaffold-builders, etc.

3/01 - 1/00 Mechanical Foreman

Volks Constructors Inc.

Prairieville, Louisiana

225-***-**** Phillip Morgan

Coordinate capital and maintenance

projects at various work sites.

1/00 - 9/99 Foreman/Mechanical

Shell Chemical Company

J.E. Merit, Lakeland, FL

941-***-**** Larry Smith

8/99 - 10/97 Piping Superintendent

Black & Veatch, Agawam, MA

413-***-**** Jerry Baptist

Supervised all piping, pumps, instruments

Inside the generation building and pipe racks.

10/97 - 8/97 Mechanical Subcontract Facilitator

Black & Veatch, Charleston, SC

919-***-**** Tim Driscoll- Chief Engineer

B.V. rep. to T.I.C. over the mechanical at a COGEN.

1997 - 1996 Site Superintendent

Amerchol Chemical, Greensberg, LA

J. E. Merit, Baton Rouge, LA - Mike Phelps, Const Mgr.

Oversaw all phases of construction at chemical plant.



Contact this candidate