ASHUTOSH OBJECTIVES
TRIPATHI
Engr. EE (degree)
To secure a challenging position where I can effectively contribute my skill as a
Electrical Engineer
Email: PROFESSIONAL SUMMARY
ashutosh.iet@live.
in
Mob: An Electrical Engr. with 07 years experience on Modification of Overhead Power
+91-962*******, Crossing and Arrangement, Traction systems, Fabrication and Erection of OHE
+91-779******* work, High mast foundation, PSI, TSS 132/25KV, 2x25 KV OHE System EE
maintenance,Operation & Maintenance of Thermal Power Plant in different fields
Date of Birth: of electrical supply.
26th-July-1991
WORK EXPERIANCE
Gender:
Male
Currently working in ORIENTAL CONSULTANTS INDIA PVT.LTD. As an
Marital Status:
Single
Languages: OHE Engineer (PMC) Navi Mumbai since FEB 2021
Hindi, English
Project :
Permanent Address: Design, Supply, Installation, Testing and Commissioning of 2x25kV Overhead
289/28b/26a Dwarika Equipments, Traction Sub-stations,
Kunj Allahpur Auxiliary Stations, Switching Stations, Auto Transformer Stations and SCADA
District : Prayagraj, System on Design-Build. Lump Sum Price Basis for JNPT MAKARPURA
State : Uttar Pradesh (Vadodara) Section (Approx. 422 kms) of Western
Dedicated Freight Corridor (Phase-2) (Contract package EMP-16)
Pin :211006
Client : Dedicated Freight Corridor Corporation Of India Ltd.(DFCCIL)
Job Performance:
Assigned for JNPT-VAITARNA (100km) Section for Inspection of
Contractors work as a Project management Consultant(PMC)
Material & Equipment Inspection which are going to Used in Project.
Closing RFIs which are raised by Contractor side for Electricals Utilities &
OHE Related work in assigned
Currently deployed for Package EMP-16& CTP -11 Related work
Checking of all Utilities work like cable shifting of Indian Railways in the
Section
Responsible for OEMs Material & Equipment Inspection and Quality
checking which are Provided by L&T
Interfacing to resolve the issue for all the work related to Electrical.
Responsible for Co-ordination for Contractor and Client (DFCCIL)
Responsible for Surveys and Approvals for cable route plans, OHE
Related Work .
Exposure of Inspection of work, Site Survey, Interface and Quality
Checking of all the Materials, Equipment as a Project management
consultant(PMC) for WDFC(Phase-2) of Indian Railways
Worked in KEC INTERNATIONAL LTD. BHOPAL, As an OHE Engineer.
(EE) from NOV 2017. To FEB 2021
Project : Construction of Road bed, major and minor bridges,
track linking (Excl. supply of rail and main line, PSC sleeper)
out door, S&T works, OHE, TSS and general electrical works
from HABIBGANJ to BARKHEDA (41.42km) in connection
with 3rd Line between
HABIBGANJ to BARKHEDA on Bhopal division of West central Railways in
MP, India.
Client: Rail Vikas Nigam Ltd.
Job Performances :
Engineering OHE of Traction power supply feeding and switching
arrangement for traction systems of conventional 25kv single phase and
25kv traction systems.
Sectioning diagram including selection of location for OHE system,
preparation of SP/SSP/FP DWG. In Viaduct including finalization of
equipment and connector.
knowledge on engineering of OHE which includes preparation of field
survey details, pegging clamp, general power cum sectioning diagram,
OHE layout plan, cross sectional DWG, volume chat for foundation,
Mast & Portal stability calculations, Portal foundation engineering,
Bridge mast engineering, structural erection DWG, dropper schedule,
basic engineering and DWG, OHE clearance study and its profile DWG,
Station working rules etc.
Preparation of project schedules in line with contract agreement.
Planning of day to day work for the smooth execution of the EPC
projects.
Engineering of Traction sub-station (TSS) and Switching station
(SP/SSP/FP/SS) for 25kv traction and conventional 25kv traction
system including selection of location, preparation of TSS/SWS DWG,
equipment, earthling and detail engineering and earthling system.
Selection of appropriate capacity of various equipments and conductor
size, clearance study and selection of structure on that basis.
Inspection material required for execution of project.
Knowledge of electricity rules, electricity act, power line crossing rules,
AC traction manuals of Indian railways, relevant India and international
standers.
Performing regular quality checks, quality assurance at site.
Handling Labour on site, interact with contractor, designer, and project
management teams.
Worked in MACWBER BEEKAY PVT. LTD.
New Delhi (BSBK Group of Company), as an Operations Engineer
(Operation & Maintenance of Ash Handling Plant) since 01 AUG 2015 TO
SEP 2017
COMPANY PROFILE:
MACWBER BEEKAY PVT. LTD. is a New Delhi based ISO: 9001 Certified
EPC company into the business of Dense Phase Pneumatic Conveying Ash
Handling System and High Concentration Slurry disposal (HCSD) System
Client: - M/S RATTANINDIA POWER LIMITED ( 5x270
MW)
Location: - Amravati, Maharashtra
Job Performances :
operation & Maintenance of Complete Ash Handling System. Bottom Ash
system from Boiler to Ash Dyke & Fly Ash System from ESP hopper to Fly
Ash Silo
Operation of Fly ash handling (Dense phase pneumatic conveying)
system.
Operation of Bottom ash handling system.
Operation of Silo unloading (Ash conditioners and unloading
spout) system.
Operations of Pumps & Compressors (HP, LP, Make-up, slurry
discharge, Eco water pumps) & Compressors (Instrument air &
Conveying air Compressors)
Man power handling and proper utilization.
Making Standard operating procedures (SOP) of Ash handling
system.
Root cause failure analysis of system.
Worked in Kailash Electrical Pvt. Ltd., Kanpur,
UP (June, 2014 to June, 2015)- Site Engineer
Project : Supply, Erection, Testing and Commissioning of 132/25KV
Traction sub-station at, SaraiChandi, Allahabad, UP (North
Railway)
132/25kV Traction Substation, Garhi Manikpur, Pratapgarh, UP
(North Railway) Provision of OHE, Modification of overhead power
line crossing, Power supply arrangement,
Client: North Railway.
Job Performances :
Assigned the work for External Electrification (132/25KV) of proposed
traction sub-station of Garhi Manikpur and Saraichandi at Lucknow
Division, High Mast Lighting system, street lighting with associated
cabling works, internal electrification of station room building, control
room and other service buildings with supervision of work, monitoring,
planning, agency bill processing and preparing documents/records as
per contractual bindings.
Supervision of PSI works and TSS (Traction Substation 132/25 KV)
works.
Supervision of Power supply arrangement and also internal
electrification of service buildings of railway stuff. Construction of
Primary Substation and distribution substation and associated HT/LT
lines. Making of cable schedule and laying.
Carrying out Joint Inspection at site with Railways.
Estimation of OHE works Substations and external/internal
electrifications for various projects under this company.
Preparation of deviation statement w.r.t. awarded BOQ as per site
condition in most economically and feasible way and obtaining
approval from competent authorities.
Official documentation works like progress reports, time extension of
Third Party and preparing agenda for review meetings.
SKILL
A good knowledge in Process Improvement, C Language and MS Office. MS
Excel
INDUSTRIAL TRAINING
Technical Exposure on Power generating station at NHPC, Banbassa,
UK
Technical Exposure on Electric locomotives & Energy management,
RDSO, Lucknow, UP
EXTRA CURRICULAR
Adroitly engaged in organizing committee of college & organized
various competition at inter college level
Actively participated in various presentations and extempore
competition at intercollege level
EDUCATION
B.Tech.(Electrical & Electronics Engineering) from Institute of
Engineering & Technology, Sitapur in 2014
12th from GIC Allahabad in 2007
10th from GIC Allahabad in 2005
DECLERATION
I hereby declare that the details furnished above are true to the best of my
knowledge.
The necessary and supporting documents shall be submitted as and when needed
Your Faithfully
Place
(Ashutosh Tripathi)