Post Job Free

Resume

Sign in

Pipeline Construction Piping

Location:
Jhelum, Punjab, Pakistan
Posted:
May 25, 2021

Contact this candidate

Resume:

Driving License UAE:

Light duty vehicle Valid Oman/UAE Driving License (ADNOC Safe Driving Course)

Email: admpb4@r.postjobfree.com

Contact Number:

:+971*********

Personal Data:

Date of birth :02-April-1971

Sex : Male

Nationality : Pakistani

Religion : Islam

Passport details:

Passport No : KG 1333492 Place of Issue: Pakistan

Date of Expiry: 09/08/2025

Visa Status:

Work visa

Marital Status:

Married

Languages known:

English, Urdu, Hindi,& Basic Arabic

Current Location:

U.A.E

JAVED IQBAL MUHAMMAD

Applied For job: Survey Engineer

Professional Summary

A seasoned professional with 30 years of experience in the field of construction. Out of 30 years, 04 years in Pakistan, and 26 years in UAE. I worked across a diverse range of construction sectors including Pipelines, Plants, Buildings and Infrastructure. Have worked with different nationalities and levels of management in UAE and Pakistan which gives an edge while working with a team comprising of multinational members.

I am having exposure to work with ADNOC (ADCO, ADMA OPCO, ADGAS, TAKREER, Petrofac, Worley Parson, VECO Engineering Technip, TRANSCO, FLUOR and OMAN GAS Company. A highly motivated team player having proven track record while working in a fast paced challenging environment. I am an Effective Communicator with excellent people management skills, strong analytical, problems solving & organizational skills. I am extremely flexible, result oriented individual and keen to explore every possible opportunity to successfully complete the assignment/Job.

Educational Qualification

Diploma in Civil Engineering.

B Tech in Civil Engineering.

Computer proficiency

AutoCAD

AutoCAD Civil 3D

Liscad Software Version 6.2

Microsoft Office (World, Excel)

Leica Geo Office

HSE/SAFETY Training Courses

Permit to Work from, ADNOC

Task Risk Assessment from ADNOC

Appreciation Certificate from ADNOC

First Aid Training and Fire Fighting Training.

Radio Detection (RD8000)

Expertise and Skills

Having in depth experience in the construction management of Oil & Gas sector projects and especially of PIPELINES.

Good knowledge and understanding of Pipeline construction practices.

Thorough knowledge of pipeline materials to guide and supervise the staff in the preparation of material requisition as per the drawings /specifications and subsequently ensure purchase of the material to required standards for the timely delivery at site.

Supervise and monitor the construction of work as per the global as well as company quality standards and practices.

Supervising the implementation of safety practices and techniques and providing instructions and trainings to site team.

Supervision of the technical staff from the team as well as contractors team involved in the execution of projects and providing directions as needed.

Determine and recommend procedures, techniques and specifications in the execution of work.

Assisting project planners in developing the detailed construction project plans and construction schedules taking cognizance of the resources available.

Having in depth knowledge of all the major & minor Pipeline Construction works.

Resources allocation for all crews such as ROW Construction, Stringing, Welding, Coating, Lowering, Tie INS, Back filling.

Assist and at times give suggestions to the Construction Manager in the day to day running of the site activities.

To ensure that all procedures which are approved for construction drawings, risk assessments, permits, NOC’s, environmental restrictions studies TRA’s and safety reviews are in place and are adhered to during all the phases of the project.

To ensure Company interests are protected through implementation of the contract requirements, regulations, and sound execution/construction practices, as well as following all the HSSE practices and quality norms.

Having thorough experience of the River Crossing pipelines, Open Cut Crossing, Micro-Tunnelling, HDD, Augur Boring method for crossing of the Existing Roads and live pipeline works.

Having in depth experience of Station Civil and piping welding, Installation and erection works.

Detailed experience of Block Valve Station installation and tie-up with pipeline.

Civil/Mechanical Works to facilitate Pig Traps at Launcher and Receiver.

Daily / Weekly and Monthly Progress Reporting.

Facilitating coordination between Subcontractors / Staff / Management.

Coordination with Civil, Structural, Piping, E&I teams for their respective works.

Employment History

Following 10 Years’ Experience of Petrofac Projects.

Project: EPC for Qusahwira Field Development Phase II Abu Dhabi-UAE

Client : Abu Dhabi Company for Onshore Petroleum Operation Ltd (ADNOC Onshore)

Designation: Survey Engineer

Period : Dec 2019 to May 2020.

Project Details;

Project Scope Phase-II facilities will be distributed between the well pads, gathering stations, and existing facilities at CDS and DS-1 as follows: Well pads (24) Gathering Stations (3) Water Injection Clusters (3) The EPC Contractor shall do the complete design for the well pads (as per scope of work). Each drilling pad will have a combination of oil producers and injectors. Chemical injection and OHL power shall be provided on each well pads. Following are the associated facilities involved in each well pad: Oil and WAG injectors well heads & associated piping Manifolds (For Gas Lift, WI, GI and Oil Production) Chemical Injection Skid OHL WHCPs Each gathering station shall be equipped with a production header to gather the gross production from a set of well pads through non-pig gable flow lines from the pads. Testing of all the wells shall be carried out at the gathering stations for which individual test lines from each pad run parallel to the production flow line towards the GS. The test line from each pad will serve for both testing as well for draining/venting the flow line to the GS during depressurization. Following are the associated facilities involved in each of the gathering stations. Production Headers (OIL, GL, GI & WI) Multipurpose Flow Meters (MPFM) Instrument Air System N2 Supply System Chemical Injection skids Flare and Closed Drain System Potable Water System Two (2) transfer lines are provided from gathering stations GS-2 and GS-3 in the northern sides of the field, whereas the transfer lines from gathering station GS-4 in the southern side of the fields are connected to existing DS-1 then exported to CDS through the existing 20 TL. The total oil production from CDS is exported to Asab through the existing 14 MOL. All these transfer lines shall be buried, coated and CP protected.

Project SLPG (Salala Liquefied Petroleum Gas) Project

Client OMAN GAS COMPANY (OGC).

Designation Senior Surveyor

Period : Sept2017 to Dec 2019.

Project Details;

Salalah liquefied petroleum gas (SLPG) project included E&F plant,SLP storage area and 27 km pipeline of 24”16” & 4” dia and 2 BVS stations, SLPG Project is being developed in Dhofar, southern Oman, by Oman Gas Company (OGC), at an estimated cost of $826m.Extraction is expected to have a capacity of 327,000 tons per annum and operate for 25 years. A proposed 10% will be used locally, while the remaining 90% will be exported .OGC plans to extract various components of LPG such as propane, butane and condensate from the existing natural gas pipeline. The extraction plant will be capable of processing approximately 8.8 million standard cubic meters per day (Mscm/d) of gas to produce 800t of LPG a day. The SLPG project will export approximately 300,000t of LPG a year and produce between 700t and 800t of butane and propane a day, which will serve as feed stock for additional petrochemical and plastics projects under development in the country. LPG will be supplied to the local truck loading facilities and thereby support the community with essential services.

Prepare records of the existing state of the site with regards to reinstatement of trees and shrubs.

Establishes / reconfirms all control points coordinates/elevations and benchmarks to confirm

Install temporary benchmark near permanent works as datum.

Establish/reconfirm and double check all control points bearings and benchmarks to confirm

adherence to the construction drawings or design data as applicable.

Mark the Centre line of the trench.

Prepare survey report of the trenching route and submit to Contractor/COMPANY for approval prior to

Trenching activity.

Record Trench levels and submit to Contractor/COMPANY for review and approval.

Record final surface levels.

Prepare shop drawings (if any)

Ensures calibrated instruments are used.

Sets out the works in compliance with the approved drawings and verifies coordinates of the finished

work.

Survey the Pipeline Route as per approved alignment sheets and provide the required markers as per

Specification and the approved Method Statements.

Mark all road and wadi crossings where additional depth required to trench and establish sign boards

Project : Bab Habshan Development Project (Phase 2)

Client : Abu Dhabi Company for Onshore Oil Operations (ADCO).

Designation : Senior Surveyor/Supervisor

Period : January 2016 to August 2017.

Project Details;

The provision of water injection, oil production wells, water injection wells, associated electrical and instrumentation facilities, pipelines (headers and flow lines) and modifications at remote degassing station.

Ensures that all pre construction survey carried out with subcontractor survey team.

Ensures observance of the project specifications.

Ensures that safety and quality standards are respected.

Ensures that production quality and quantity standards are observed.

Attend meetings and advise Subcontractor the priorities to be taken into consideration.

Monitor work progress in accordance with their submitted work schedule.

Attend the production meetings.

Keep daily activity progress record and log any problems that may exist for immediate action.

Measures the works carried out with the works director and sub- contractors'

representatives.

Ensure safety practices on site, report in routine observation reports cases of good or bad practices which might affect the safety on site.

Coordinate piping fabrication activities for shut down activities.

Coordinate piping spools pressure tests.

Attend the hydro tests performed on site, test packages mechanical check and advise the technical punches before reinstatement.

Coordinate piping installation according to the refurbishment schedule.

Check the piping painting and insulation status as per schedule.

Record Engineering Departments solutions: Site Disposition and Non-conformance Report

Observe and resolve Safety problems.

Report specific activities in daily and weekly reports.

Estimate quantities of piping which have to be installed.

Interface with other departments: Engineering, QS, Civil Construction, El C&I Construction, Support Services Construction.

Project : Bab Gas Compression Project.

Client : Abu Dhabi Company for Onshore Oil Operations (ADCO).

Designation : Senior Surveyor

Period : April 2013 to December 2015

PROJECT DETAILS:-

Project Scope includes the provision 27 well head facilities, associated gas pipelines, Flow lines, direct gathering manifold, modifications to remote manifold stations and Overhead power transmission lines.

Main Responsibilities:

Direct & supervise a team of pipeline supervisors providing expertise and ensures the application of correct standards within the parameters of a project schedule.

Responsible for construction, materials requisitioning, and construction of pipelines and related facilities including supervision of inspectors and contractors during construction and start-up.

Responsible for working within the provisions and guidelines of the Quality Assurance systems.

Responsible for personal safety and working within the procedures.

Establish preliminary Pipeline route alignments and carry out necessary Co-ordination with local authorities for its approval. Review/ approve drawings, specifications and other technical documents for Pipeline Engineering for all types of projects.

To supervise the work of EPC Contractor specialists and ensure that quality and standards are maintained and cost effective solutions are adopted. Participate in review / audit of Contractor’s construction work, witness pre-commissioning and commissioning activities.

Carry out review /approve Contractors /Sub Contractors Method Statements of important and critical work activities.

Project : ASAB FULL FEED DEVELOPMENT.

Client : Abu Dhabi Company for Onshore Oil Operations (ADCO).

Designation : Surveyor

Period : Oct 2009 to March 2013

PROJECT DETAILS:

The project is a mega scale development and involves large construction quantities spread over a geographical area of 40 x 20km.Including Well Heads, Extension of RDS, Gas lift Pipelines, Trunk lines,36 inch BAB MOL and CDS(central degassing station).

Ensures that all pre survey carried out with Subcontractor Survey Team.

Ensures that safety and quality standards are respected

Ensures that production quality and quantity standards are observed

Attend meetings and advise Subcontractor the priorities to be taken into consideration.

Monitor work progress in accordance with their submitted work schedule.

Attend the production meetings.

Keep daily activity progress record and log any problems that may exist for immediate action.

Measures the works carried out with the works director and sub- contractors'

representatives.

Ensure safety practices on site, report in routine observation reports cases of good or bad practices which might affect the safety on site.

Coordinate piping fabrication activities for shut down activities.

Coordinate piping spools pressure tests.

Attend the hydro tests performed on site, test packages mechanical check and advise the technical punches before reinstatement.

Coordinate piping installation according to the refurbishment schedule.

Check the piping painting and insulation status as per schedule.

Record Engineering Departments solutions : Site Disposition and Non-conformance Report

Observe and resolve Safety problems.

Report specific activities in daily and weekly reports.

Estimate quantities of piping which have to be installed.

Interface with other departments: Engineering, QS, Civil Construction, El C&I Construction, Support Services Construction.

Assists with the hand - over of completion works Hand over the piping systems to the client.

Experience 30 Years

From September 1990 to September 2009

Worked as Civil Engineer / Surveyor in Mouchel Middle East (Consultant) Abu Dhabi from Nov 2008 to Oct 2009 and executed below projects

Al Ghadeer Grading and Development Project.

Marine project Artificial Island and access channel in Dabbiya ADCO (NEB)

Worked as Chief Surveyor in CAPITAL SURVEY, Abu Dhabi from Mar 2008 to Nov2008 and supervise construction Survey and Topographic Survey projects in UAE.

Worked as Senior Surveyor in Arab Center for Engineering Studies Abu Dhabi from Oct 2003 to Feb 2008 and executed Topographic, Construction &Hydrographical Survey for below projects

Offshore & Onshore Sir Banyans Island, Dalma Island. Oil Refinery and Pipelines Survey for ADCO & GASCO in Ruwais, Jabel Dhana, Habshan, Buhassa, Sahil, Asab, Shah and Das Island for ADMA OPCO & ADGAS.

Worked as Surveyor in HANSA LUFTBILD German Air Survey Dubai from April 2001 to Sep 2003 and supervise Topographic Survey & UAE networking survey Establish Survey Monuments all over UAE.

Worked as Land Surveyor in EMIRATES NORTECH SURVEY, SHARJAH from May 1996 to Mar 2001 and supervise Topographic Survey for water pipeline from Fujairah to Al Ain and other all kind of survey projects.

Worked as Surveyor in MIDFA MACE, Dubai, from Jan 1995 to Mar 1996 and supervise Construction pipeline Project of Jumairah Sewerage & Drainage System in Jumairah (Dubai).

Worked as QAVI ENGINEERING (Pvt) Ltd., Pakistan from Sep 1990 to Jan 1994 at their Construction Project of GIK Institute Topi (N.W.F.P) of setting out of piles layout the foundation and prepare all bill of quantity.

PROJECTS EXECUTED: (Major Projects)

Project: Water Pipeline from Fujairah to Al Ain

Client: Technip

Responsibilities: Topographic Survey & Underground Detection, Establish Bench Marks from Fujairah to Al Ain

Project: Update Ariel Photography and Topographic Survey Project

Client: TPD (Town Planning Department)

Responsibilities: Topographic Survey and Establish Bench Marks of whole Al Ain.

Project: Topographic Survey of Fujairah Airport

Client: Civil Aviation Authority, Fujairah

Responsibilities: Detail Survey of Airport and Measuring heights of building.

Project: Tank Farm Survey Jabel Dhanna

Client: Pan Emirates & ADCO

Responsibilities: Topographic Survey & Underground detection of tank farm area.

Project: Conference Palace Hotel

Client: KEO International Consultants

Responsibilities: As a Survey Inspector for Building Structures & Earth work

Project: Air Field Runway Extension Project JabelDhana

Client: Stanly Consultant (ADNOC)

Responsibilities: Topographic Survey & Bathymetric Survey and Underground Detection.

Project: Bathymetric & Topographic Survey of Mina Zayed & Ras al Khaimah & Delma Island

Client: Dourch Consult

Responsibilities: Topographic Survey & Bathymetric Survey

Project: Feed Services for Replacement of NGL Pipe line Network (Asab, Bab, Buhasa, and Ruwais)

Client: Veco Engineering (Gasco)

Responsibilities: Detail survey of existing Pipelines corridor & underground services

Project: Ruwais Refinery & Jetty

Client: Mutawa Marine & TAKREER

Responsibilities: Topographic Survey & Bathymetric Survey.

Project: Rerouting of Relief Header Line Das Island

Client: Worley Parsons & Adma Opco

Responsibilities: Topographic Survey and Underground detection of Existing Pipelines and cables

Project: Al Ain University &Sorbonne University Abu Dhabi

Client: Oger& GHD Abu Dhabi

Responsibilities: As a civil inspector, Supervision all construction works.

Project: PMF & AGGI Facilities (Batch 3rd) SAS (Sahil, Asab, Shah)

Client: Mott MacDonald, ADCO

Responsibilities: Topographic Survey & Underground Detection of Pipelines Route and Well Heades Area.

Project: Integrated Gas Development Project (Ruwais)

Client: FLUOR (GASCO)

Responsibilities: Detail survey of Pipelines & Plant Area & underground services.

Project: ADCO Asab 90 km Transmission Line

Client: ADCO/MOTMACDONALD

Responsibilities: Topographic survey corridor of Transmission line and Underground detection of and existing Pipelines and cables

Project: GASCO Bu Hassa Upgrade Project

Client: LARSEN & TURBO and GASCO

Responsibilities: Topographic Survey and Underground detection of Existing Pipelines and cables

Project: Zakum Standby Strip Das Island

Client: Worley Parsons & Adma Opco

Responsibilities: Topographic Survey and Underground detection of Existing Pipelines and cables.

Project: Construction of A6 Artificial Island & Navigation Channel at Al Dhabbiya (NEB)

Client: ADCO

Responsibilities: Supervision of dredging works includes Hydro graphical Survey, Construction of island Rock works. Quay wall and Boat Ramp.

(JAVED IQBAL MUHAMMAD)