A growth-oriented professional with an experience of 7 years in Project Planning &

scheduling,MEP Coordination,Installation & commissioning, Site Operations,Project Execution,Mechanical Engineering,Fire Fighting System,HVAC Engineering,PHE system,Site Execution,Manpower Management,Resource Optimization

WORK E XPERIENCE

Arabian

Construction

Company

Jun 2018 - Present

Kolkata

SENIOR MEP ENGINEER

Projects- THE 42(East india’s tallest residential luxury building)

Joined as Senior MEP Engineer in the project .Reporting MEP manager. We had 5 nos members in the MEP

team.

• Reviewing contact documents & scheme of the

project.

• Reviewing of shop drawings for approval.

• Interaction with consultant & client to resolve

technical & execution queries.

• Preparing/Reviewing for BOMs’.

• Review consultant’s design and specification.

• Preparing Water balancing chart & pipe schedule.

• Preparing Inspection test plans.

• Techno-commercial comparison of mechanical items.

• Preparing work progress pictorial.

• Monthly projection for installations

L I N K S

https://www.linkedin.com/in/tanmo

y-das-670b2b22/

Linkedin:

L A N G UAGES

Bengali

English

Hindi

D R I V I N G L I C E N S E

Driving license category

MCWG, LMV-NT

T D

TANMOY D A S

S E N I O R M E P E N G I N E E R

P.O+Vill-Domjur,Dist.-

Howrah,West Bengal,India,

Howrah, 711405

706-***-**** admp12@r.postjobfree.com

• Monitoring progress of execution.

• Attending consultants’ & clients’ kick off meetings.

• Technical evaluations of materials.

• Preparation/review of datasheets of Mechanical

equipment and review of vendor documents.

• Ensure the MEP work carried responsible for

overseeing all HVAC, Plumbing, firefighting, Fire

alarm, Public address system, Elevator work is as per approved shop drawing and within the time frame

and progress of the approved construction program.

• Ensure that the installation, inspection and testing of all the MEP equipment, fittings and work

implemented meets the specification and the

consultant requirements.

• Complete responsibility to decide on day to day work that needs to be carried out by subordinates including: scheduling of activities, assigning task to groups or individuals, accuracy of work conducted, supplying resources and dealing with operational issues and

problems.

• Coordinate with other project personnel to ensure that deadlines, procedures, and other project

requirements are met.

• Prepare shop drawing & material submittals for

consultant’s approval.

• Hand Over the system to Facility Management team with all manual, SOP, Test certificated & relevant documents

Emaar India Pvt

LTD

Apr 2017 - May 2018

Gurugram

ASSISTANT MANAGER MEP

Projects- Digital Greens(Commercial IT hub o ice building project)

Joined as an Assistant Manager in the last stage i.e commissioning & handover of the project.Reporting

MEP manager. Total 6 nos members in the MEP team.

• Manage, coach and develop assigned staff

• Schedule, conduct and document all job meetings

• Tracking of project RFI's, change orders and other pertinent documentation

• Manage project close out, including securing

warranties, guarantees, and acceptance of work,

subcontractor and vendor close, final payment and

records retention

HOBBIES

Swimming

Travelling

Playing Piano

P E R S ONAL

D E TAILS

Date of birth: 15/02/1991

Nationality: Indian

Marital status: Married

• Plan and arrange the training of the in-house

Facilities Management team on various systems prior to the handing/taking over of the project.

• Responsible for commissioning H.V.A.C equipment

like Chillers, Primary & Secondary Pumps, Air washer unit, AHU, & piping.

• Detailed engineering of HVAC systems, Cross-

checking the design for the Final Installation,

• Estimating the Work, Planning the activities within time limits,

• Maintaining log of activities and ensuring them to meet planned completion,

• Cost Control by effective use of Material and Man- power. Commissioning, Testing and Balancing of

Both Water and Air Side for AHUs, FCUs

• Supervising the Erection of G.I Ducting for AHUs, FAHUs, FCUs and Make Up air Fans with accessories

(Motorized Dampers, Volume Control Dampers, Fire

Dampers Final Fixtures).

• Supervising the Water & Air balancing of the HVAC System by Handling the Modern & Traditional Water

& Air Balancing Equipment's.

• Hand Over the system to Facility Management team with all manual, SOP, Test certificated & relevant documents

Larsen & Toubro

construction

Jul 2013 - Apr 2017

Gurugram

SENIOR MECHANICAL ENGINEER

Projects- M3M Merlin( High rise residential project) IREO Victory Valley( High rise residential project) Experion Windchants( High rise residential project) Joined as a MEP trainee in the initial stage of the project.Reporting to a senior engineer and an MEP

manager.Total 7 nos members in the MEP team.

Job includes-

• Monitor the -Planning vs. Progress.

• Coordinating with other trades civil, mechanical, finishing to avoid repetitive work

• Preparing weekly report and submitting to the

manager and highlighting the Problems affecting the progress

• Ensuring internal documentation as per norms and requirements.

• Study & Vetting of drawings and BOQ

After a year promoted to senior mechanical

engineer.Reporting to an MEP manager..Had a team 10 nos MEP

staff(including 2 managers,2 senior Engineers,2

Engineers,4 supervisors)..

Job includes-

• Ordering long lead items in advance to meet the

schedule.

• Always following the updated / revised drawing and submitting the variation report to the contracts dept.

• Ordering the Required material as per Specifications.

• Allocating resources as per the schedule to achieve target.

• Able to review resource reports like manpower

histograms etc. and ascertain adequacy of resources deployed for timely completion of the project.

• Responsible for Installing and Inspection hydrant system (External &Internal).

• Responsible for Installation Sprinkler Piping, Hose Reel Box & other Accessories.

• Executing & Inspecting Plumbing and Sanitary works. Water Distribution Networks, Pumps, Plumbing

• Pipe Works in Trenches, Structures related to

Plumbing/Drainage, Internal/External/Surface

Drainage.

• Executing Water & sewage treatment plants.

• Responsible for Nitrogen Testing for copper piping & Vacuuming for VRFUnit.

• Responsible for Erecting & Inspecting HVAC Duct

and Accessories like VCD, VRV, VRF, Louvers

• Responsible for Installing Condensate Drain Pipes

• Responsible for Installing & Inspecting H.V.A.C Units Like Split & Cassette Unit.

• Witnessed Light & Air testing in ducting to ensure leakage.

• Witnessed hydro & Pneumatic test of Equipment and pipes.

• Responsible for Preparing Method Statement & Hand over Document.

E D U CATION

Prin, L, N,

Welingkar Institute

of Mnagment

development &

research

2017

Mumbai

POST GRADUATE DIPLOMA IN

MANAGEMENT (OPERATIONS

MANAGEMENT)

Kalyani Govt

Engineering College

2013

Kolkata

B.TECH MECHANICAL ENGINEER

Makardah

Bamasundari

Institution

2009

Howrah

10+2

Makardah

Bamasundari

Institution

2007

Howrah

10TH MADHYAMIK

S K I L L S

Team management Project Management

Autocad Drafting HVAC,PHE & Fire protection

system Design

MS office proficiency MEP system

Planning,scheduling,Coordinatio

n

HVAC,Plumbing,Fire

fighting,Fire protection system

installation & testing-

commissioning

Excellent communication

Problem resolution Results-oriented

COURSES

MEP centre,Delhi

Jun 2014 - Aug 2014

HVAC DESIGN & DRAFFTING



Contact this candidate