A growth-oriented professional with an experience of 7 years in Project Planning &
scheduling,MEP Coordination,Installation & commissioning, Site Operations,Project Execution,Mechanical Engineering,Fire Fighting System,HVAC Engineering,PHE system,Site Execution,Manpower Management,Resource Optimization
WORK E XPERIENCE
Arabian
Construction
Company
Jun 2018 - Present
Kolkata
SENIOR MEP ENGINEER
Projects- THE 42(East india’s tallest residential luxury building)
Joined as Senior MEP Engineer in the project .Reporting MEP manager. We had 5 nos members in the MEP
team.
• Reviewing contact documents & scheme of the
project.
• Reviewing of shop drawings for approval.
• Interaction with consultant & client to resolve
technical & execution queries.
• Preparing/Reviewing for BOMs’.
• Review consultant’s design and specification.
• Preparing Water balancing chart & pipe schedule.
• Preparing Inspection test plans.
• Techno-commercial comparison of mechanical items.
• Preparing work progress pictorial.
• Monthly projection for installations
L I N K S
https://www.linkedin.com/in/tanmo
y-das-670b2b22/
Linkedin:
L A N G UAGES
Bengali
English
Hindi
D R I V I N G L I C E N S E
Driving license category
MCWG, LMV-NT
T D
TANMOY D A S
S E N I O R M E P E N G I N E E R
P.O+Vill-Domjur,Dist.-
Howrah,West Bengal,India,
Howrah, 711405
706-***-**** admp12@r.postjobfree.com
• Monitoring progress of execution.
• Attending consultants’ & clients’ kick off meetings.
• Technical evaluations of materials.
• Preparation/review of datasheets of Mechanical
equipment and review of vendor documents.
• Ensure the MEP work carried responsible for
overseeing all HVAC, Plumbing, firefighting, Fire
alarm, Public address system, Elevator work is as per approved shop drawing and within the time frame
and progress of the approved construction program.
• Ensure that the installation, inspection and testing of all the MEP equipment, fittings and work
implemented meets the specification and the
consultant requirements.
• Complete responsibility to decide on day to day work that needs to be carried out by subordinates including: scheduling of activities, assigning task to groups or individuals, accuracy of work conducted, supplying resources and dealing with operational issues and
problems.
• Coordinate with other project personnel to ensure that deadlines, procedures, and other project
requirements are met.
• Prepare shop drawing & material submittals for
consultant’s approval.
• Hand Over the system to Facility Management team with all manual, SOP, Test certificated & relevant documents
Emaar India Pvt
LTD
Apr 2017 - May 2018
Gurugram
ASSISTANT MANAGER MEP
Projects- Digital Greens(Commercial IT hub o ice building project)
Joined as an Assistant Manager in the last stage i.e commissioning & handover of the project.Reporting
MEP manager. Total 6 nos members in the MEP team.
• Manage, coach and develop assigned staff
• Schedule, conduct and document all job meetings
• Tracking of project RFI's, change orders and other pertinent documentation
• Manage project close out, including securing
warranties, guarantees, and acceptance of work,
subcontractor and vendor close, final payment and
records retention
HOBBIES
Swimming
Travelling
Playing Piano
P E R S ONAL
D E TAILS
Date of birth: 15/02/1991
Nationality: Indian
Marital status: Married
• Plan and arrange the training of the in-house
Facilities Management team on various systems prior to the handing/taking over of the project.
• Responsible for commissioning H.V.A.C equipment
like Chillers, Primary & Secondary Pumps, Air washer unit, AHU, & piping.
• Detailed engineering of HVAC systems, Cross-
checking the design for the Final Installation,
• Estimating the Work, Planning the activities within time limits,
• Maintaining log of activities and ensuring them to meet planned completion,
• Cost Control by effective use of Material and Man- power. Commissioning, Testing and Balancing of
Both Water and Air Side for AHUs, FCUs
• Supervising the Erection of G.I Ducting for AHUs, FAHUs, FCUs and Make Up air Fans with accessories
(Motorized Dampers, Volume Control Dampers, Fire
Dampers Final Fixtures).
• Supervising the Water & Air balancing of the HVAC System by Handling the Modern & Traditional Water
& Air Balancing Equipment's.
• Hand Over the system to Facility Management team with all manual, SOP, Test certificated & relevant documents
Larsen & Toubro
construction
Jul 2013 - Apr 2017
Gurugram
SENIOR MECHANICAL ENGINEER
Projects- M3M Merlin( High rise residential project) IREO Victory Valley( High rise residential project) Experion Windchants( High rise residential project) Joined as a MEP trainee in the initial stage of the project.Reporting to a senior engineer and an MEP
manager.Total 7 nos members in the MEP team.
Job includes-
• Monitor the -Planning vs. Progress.
• Coordinating with other trades civil, mechanical, finishing to avoid repetitive work
• Preparing weekly report and submitting to the
manager and highlighting the Problems affecting the progress
• Ensuring internal documentation as per norms and requirements.
• Study & Vetting of drawings and BOQ
After a year promoted to senior mechanical
engineer.Reporting to an MEP manager..Had a team 10 nos MEP
staff(including 2 managers,2 senior Engineers,2
Engineers,4 supervisors)..
Job includes-
• Ordering long lead items in advance to meet the
schedule.
• Always following the updated / revised drawing and submitting the variation report to the contracts dept.
• Ordering the Required material as per Specifications.
• Allocating resources as per the schedule to achieve target.
• Able to review resource reports like manpower
histograms etc. and ascertain adequacy of resources deployed for timely completion of the project.
• Responsible for Installing and Inspection hydrant system (External &Internal).
• Responsible for Installation Sprinkler Piping, Hose Reel Box & other Accessories.
• Executing & Inspecting Plumbing and Sanitary works. Water Distribution Networks, Pumps, Plumbing
• Pipe Works in Trenches, Structures related to
Plumbing/Drainage, Internal/External/Surface
Drainage.
• Executing Water & sewage treatment plants.
• Responsible for Nitrogen Testing for copper piping & Vacuuming for VRFUnit.
• Responsible for Erecting & Inspecting HVAC Duct
and Accessories like VCD, VRV, VRF, Louvers
• Responsible for Installing Condensate Drain Pipes
• Responsible for Installing & Inspecting H.V.A.C Units Like Split & Cassette Unit.
• Witnessed Light & Air testing in ducting to ensure leakage.
• Witnessed hydro & Pneumatic test of Equipment and pipes.
• Responsible for Preparing Method Statement & Hand over Document.
E D U CATION
Prin, L, N,
Welingkar Institute
of Mnagment
development &
research
2017
Mumbai
POST GRADUATE DIPLOMA IN
MANAGEMENT (OPERATIONS
MANAGEMENT)
Kalyani Govt
Engineering College
2013
Kolkata
B.TECH MECHANICAL ENGINEER
Makardah
Bamasundari
Institution
2009
Howrah
10+2
Makardah
Bamasundari
Institution
2007
Howrah
10TH MADHYAMIK
S K I L L S
Team management Project Management
Autocad Drafting HVAC,PHE & Fire protection
system Design
MS office proficiency MEP system
Planning,scheduling,Coordinatio
n
HVAC,Plumbing,Fire
fighting,Fire protection system
installation & testing-
commissioning
Excellent communication
Problem resolution Results-oriented
COURSES
MEP centre,Delhi
Jun 2014 - Aug 2014
HVAC DESIGN & DRAFFTING