Post Job Free
Sign in

Project Engineer Manager

Location:
Houston, TX
Posted:
May 23, 2021

Contact this candidate

Resume:

Houston, TX ***** - 806-***-**** - *********@*****.***

EDUCATION / CREDENTIALS

Bachelor of Science, Mechanical Engineering, Texas Tech University, Lubbock, TX

Professional Engineer (P.E.), State of Texas # 113246 and State of CA # M 37447

Green Belt 6 Sigma

QUALIFICATIONS AND SKILLS

Managed multidiscipline projects from conception to completion: including plant expansions, new equipment installations, piping, retrofits, remediation and equipment and facility refurbishments

Managed and participated in the design of onshore and offshore oil, water and gas separation plants

Managed and prepared budgets and schedules for projects and project execution plans (PEP)

Experienced in Customer relations and employee, contractor and designer management

Ensured projects are designed per code (ASME, API) and company standards

Knowledgeable in multiple software packages including SAP, MS Project, AutoCAD, Chief Architect, MiniTab, MathCAD

EXPERIENCE

Principal Engineer, Subsea Solutions (Blow Out Preventer Verification Firm) Houston, TX

2014-2020

Managed engineering and Gulf of Mexico engineering operations

Produced PE stamped reports for BOP shearing requirements and other reports mandated by 30 CFR

Developed calculation sheets for BOP pipe shear requirements

Verified Drill Rig Accumulator sizing

Verified and calculated required hydraulic shearing pressure and accumulator pressure & volume.

Interactive API SC16 member (attended meetings and worked on API standards development groups)

Met with and worked with BSEE (Bureau of Safety and Environmental Enforcement) representatives

Interfaced with clients directly

Provided field operations support as needed

Project Engineer Lead, Star Engineering Services (EPC Firm) Houston, TX

2013-2014

Reviewed, Created and Changed: MFDs/P&IDs, SFDs, Plot Plans and Measurement Schematics

Attended MOC meetings

Reviewed, Created and Edited Equipment and Instrumentation Specification Sheets

Created/evaluated specifications for Piping, Instrumentation and Equipment

Created Design Basis and System reports

Knowledgeable in interpreting HYSIS reports

Interfaced with clients directly

Project Engineer/Manager Mechanical, BIS TEPSCO (EPC Firm) La Porte, TX

2011-2012

Directly interfaced with customers (i.e. Enterprise Products, Kinder Morgan)

Managed and prepared Mechanical Bid Packages i.e. skid packages, plant piping modifications, compressor and pump stations

Prepared project schedules and budgets

Project Engineer, Sekisui (Specialty Chemicals) Pasadena, TX

2008-2010

Managed Civil, I&E and Piping designers for projects including but not limited too replacing heat exchangers, ground up new equipment installs heat exchangers and mechanical switch automation), small pump installations, flow meters, piping modification and replacement, Storm Water Pollution Prevention Plan required containments, new instrumentation, employee administration and lab HVAC

Attended MOC meetings

Managed schedule, scope and budget for plant waste water tank refurbishments

Mechanical Project Manager for $6 million project to add multiple product washing steps

Managed and created yearly capital budgets

Plant/Project Engineer, Saint-Gobain CertainTeed (Roofing Products Group)

2005-2008

Managed Mechanical, Civil, I&E and Piping designs for projects including / but not limited too hot oil heat transfer system refurbishment, fluidized bed plate heat exchanger modification, shingle packaging, wind seal applicator, asbestos remediation

Identified / Developed process improvement opportunities and implemented prioritized projects

Responsible for evaluating and correcting, troubleshooting and maintaining manufacturing equipment including but not limited too. asphalt and granule mat coaters, product cooling, heat transfer systems, cutters and packaging systems

Construction Administrator, Schmidt & Stacy Consulting Engineers (MEP), Dallas, Texas

2005-2005

Performed pre-design surveys of electrical and mechanical systems within office buildings for tenant finish out designs

Participated in quality inspections of jobs during and after construction.

Worked with engineers to provide timely RFI responses (Developed time tracking spreadsheet)



Contact this candidate