June SIMPLEX INFRASTRUCTURES LIMITED
2017 - Graduate Engineer Trainee
March2018 Execution of work in structures i.e. -
Pile/Pilecap/Pier/Piercap/deckslab/Cast-in-situ I-Girders.
April 2018 SIMPLEX INFRASTRUCTURES LIMITED
- January Assistant Engineer
2020 EXECUTION : Bored ( DMC/RIG) PILING, BEARINGS: POT PTFE/
GUIDED/METALLIC, I-GIRDERS : PRESTRESSED/CAST-IN-SITU, SLABS :
DECK-SLAB/SOLID-SLAB/RCC-SLAB/APPROACH-SLAB/FRICTION SLAB,
SEISMIC RESTRAINERS,
MISCELLANEOUS ITEMS : CRASH BARRIER/MEDIAN/EXPANSION JOINT /
PIER-SHAFT PROTECTION WALL/ COPING BEAM, RE-PANNELS
:CASTING/ERECTION.
CONDUCTING LOAD TEST OVER SLABS AND PILE.
PLANNING : TRACKING OF WORK IN PROGRESS, PREPARATION OF BBS,
RECONCILIATION OF MATERIALS, PREPARATION OF SCHEDULE OF WORK,
PREPARATION OF MPR/WPR, DELAY ANALYSIS.
QUANTITY SURVEY : Client/ Sub-contractor billing in ERP, Rate Analysis.
COORDINATION AND CONTRACTS : Preparation of CTC, EOT letters, Delay
Analysis, Documentation.
January Hindustan Alcox Limited
2020 - Till Project Engineer Structural
date Specialised Steel Structures I Space Frames I PEB I Solar I Tensile
Structures I ETFE
Preparation of Job Safety Analysis(JSA), Method of
Statement/Methodology, Preparation & Checking of Protocols for foundation,
Preparation of Work Schedule Program/ Base-Line Program in MS-Excel,
Preparation of DPR, WPR and MPR, Preparation & Checking of Bills,
Liaisoning with Clients/Sub-contractors, Monitoring work in progress,
Managing of Resources i.e Manpower/Materials/Machinery,
Responsible for Erection of Structure.
EDUCATION
2017 KALINGA INSTITUTE OF INDUSTRIAL TECHNOLOGY
B.Tech in Civil Engineering
7.51 CGPA or 75.1%
2014 GET GROUP OF INSTITUTION FACULTY OF TECHNOLOGY BAZPUR
Diploma in civil engineering
67.88%
2007 ST. Therasa senior secondary
Matriculation
63.88%
SKILLS
MS-EXCEL
Communication
Alertness
Attitude
Entrepreneur resource planning (ERP) billing
Resource Organization / management / Utilization
Resource organization
Liaisoning with Clients & Sub-contractors
Space framed structure execution & erection specialist
PROJECTS
FLYOVER PROJECT
Srinagar yover project from jehangir Chowk to Rambagh-Natipora 3.9 km length
JSW RMHS-2 Coal Cover Shed
RMHS-2 COVER SHED JETTY YARD DHARMTAR PORT, RAIGARH, MAHARASHTRA, 390M LONG
, 135M WIDE, 53M HEIGHT
SAMRAT CEMENT - Limestone, Coal & Additives shed
SITE INCHARGE
Client = SAMRAT CEMENT
PROJECT VALUE = 14.25CRORE INR
Limestone shed
Length = 4.250*67= 284.75m
Height = 20m
Width = 50m
Coal & Additives shed
Length = 4.250*57 = 242.25m
Height = 21.125m
Width = 75m
Note : Full project successfully completed within 6months( i.e. from 15th September 2020 to 13th
March 2021) without any fatality).
UTKAL ALUMINA INTERNATIONAL LIMITED - Bauxite shed
SITE INCHARGE
Client : Hindalco/ Aditya Birla group
Project value : 13.85Crore
Erection Value : 1 Crore
HEIGHT OF SHED : 45M
LENGTH OF SHED: 200M
WIDTH OF SHED : 80M
LANGUAGE
English
Hindi
PERSONAL DETAILS
Date of Birth : 27/07/1990
Marital Status : Married
Nationality : Indian
Skype : *******@*****.***
Alternate Email id : *******@*****.***
Alternate contact number : 811-***-****
PASSPORT NUMBER
R7557202
CURRENT CTC
5.5 LAKHS PER ANNUM
EXPECTED CTC
Expected CTC
25% More than the previous one & negotiable with the available terms and conditions.
REFERENCE
Hariom Sharma - "APCO INFRATECH PVT. LTD"
Bridge Inspector
************@*****.***
Manoj Kumar Upadhyay - "Oriental structural Engineers"
General Manager
******@*****.***
Bhupendra Pal - "Hindustan Alcox Limited"
PROJECT MANAGER
************@*****.***