CURRICULUM VITAE
Project Engineer
PERSONAL DETAILS:
Name : ABDEL KHALEK EL SAYED ABDEL KHALEK
Nationality : Egyptian Date of Birth: 14/09/1971
Marital Status : Married
Contact DETAILS:
Egypt Address : 364 AlNakl St, SMOUHA – Alexandria – Egypt Egypt: 002 012******** – UAE: 009***********
E-mail: *******@*******.*** & **************@*****.***
Professional Development:
Education: B.SC. Civil Engineering in June 1994, Faculty of Engineering, Alexandria University General Grade “Good”
o Management Certificate: Project Management Institute (PMI) Project Management Professional (PMP) – April 2014, PMP # 1705499 – valid April 2023
Training Risk Management course - RM-PMI course Aug 2016 –PM house
Certificated Welder Fillet Joint F position according AWS.
Primavera P6 Training Course Basic & Advance Jan 2020
Inspection coordinator engineer certificate for marine construction; TWI - 3.4U – UK inspection/coordinator engineer. Certificate Valid till December 2020.
CSWIP – 3.2U- NDT - welding inspector – TWI – UK from Nov 2000 till Nov 2016 Work Classification:
Installation, Maintenance & Inspection of Offshore steel structure Platform - Oil & Gas offshore field (Egypt- KSA – UAE – Qatar) 1998-2009 & 2017 till present as a freelancer Project Engineer
Construction & installation site Project Engineer – constructed of fire system include fire pump – steel protection shade 9 ton – water tanks 135m3 – concrete base – Location Old Alexandria Security Directorate – Alexandria. 2020
Rehabilitation of Yanbu south terminal industrial cities- Port AlMuijz. – steel repair – painting offshore platform - Saudi Aramco from 2015-2017
Restoration for water pumps station. (Consultant engineer- Dr. Osama Al Shafei)-1995
Maintenance of concrete marine harbors – re-construction marine berth - Qatar from 2009 till 2015
Construction site engineer in multi floor building construction- Abou Kier – Alexandria - Army Residence compound – Abou Kier – main contractor Talat Mustafa. Work Skills:-
o Practical, proactive management style with strong interpersonal skills. o Problem solving, work under pressure in both time and Work requirements. o Good knowledge of project management rules obtained mainly from educational background (hold PMP certificate and member in PMI institute), and from work experience. o Excellent communication skills and Liaises with other Joint Ventures with the ability to interact with all levels.
o Ability to understand and implement solutions to satisfy the business objectives. o Plan ahead and analysis all risks to remove or mitigate and prepare the necessary reports o Ensure work quality standards are achieved and completed in safe manner. o Follow up and timely implementation of Main Contractor / Consultant Review comments. o Held regular meeting with department involve ensuring achieve project target and schedule. o Proper execution of all site activities as per time and specifications to ensure full compliance within the contract requirements, review the project in depth for delivery and cost. o Oversee and direct construction projects from conception to completion. COMPUTER SKILLS:
o Professional user of AutoCAD, Microsoft Office, Visio & familiar user of MS Project. Languages:
- Arabic: Mother tongue. - English: Competent User 2/7
Project Engineer
Experience Record:
June 2020- October
2020
Subcontractor – DAR El BENA general contracting - Steel structure fabrication and installation, fire water Tanks installation 135m3 – concrete base for fire pump and tanks.
June 2017-Dec 2019
Free Lance Part
Time
Project Engineer
CCC/UWE Abu Dhabi – Offshore Oil & Gas projects in UAE & KSA – Inspection, Maintenance & Repair (IMR) include Pipelines, steel structure Platforms & Harbor concrete construction)
October 2016-May
2017: Project
Engineer
June 09 till Sept
2015
Construction/Marine
Engineer
Responsibility
Rehabilitation of Yanbu south terminal- Prot Al Muijz— Repair steel structure includes weld patches and painting – new building constructions. Client Saudi Aramco – Contractor Ruwailian General Contracting
Mesaieed /RAS Luffan Ports – Qatar- Client QP – Contractor – SMIT Middle East/Bosakalis – Inspection & Maintenance concrete Harbor includes offshore navigation buoys.
From Jan 09 till Dec 11, Rebuilt Construction for New Service Berth # 4 in Ras Luffan Industrial Area. Main contractor Archirodeon, The works was including a quay wall with a length of 200 meters. The works complies of dredging of the sea bed, placing the leveling layers rock foundations for receiving the pre-cast mass concrete blocks and placing of pre-cast blocks.
Leading the marine construction team and reporting to Construction Manager. Maintenance operation for Mesaieed port Jetties. May 06 – Aug 09
Field construction
Engineer
Construction for New Oil Field - UMM SHEIF OIL FIELD – UAE – Owner ADMA – Client Hyundai company, CCC – Contractor company: Sleeper Installation, Laying Pipelines, Offshore Oil Platform installation Day to day activities progress, liaising with other shift and client.
• Planning ahead to prevent problems on site before they occur, for example, planning the delivery and storage of equipment and materials. Sept 02 – May 03
Site Manager
Responsibility
AGIBA – MPA Offshore Platform Repainting and Shed Installation – Gabl Al Zeit Client: SUCO Badran - Contractor: Maridive Oil Service – Job activities: Repainting MPA P/F 3500m3, replaced grating and steps, Built Shed for existing water injection plant of PMA (20 tons), repair and re-fabricated boat landing for the Platform.
Sep 01 – Aug 02
Site Engineer
Responsibility
Electricity Power Station Oyan Musa – Gulf Of Suze – Client: Egyptian Electricity Authority – Contractor Maridive Oil Service Pipe laying 10” Naphtha P/L 3100m (2400m Offshore& 700m onshore) - manage and follow up the following activities, Post root survey, Pipes welding, sandblasting, painting, trenching, Pipeline Hydrostatic test. Supervision and Liaising with the subcontractor.
March 01- Aug 01
Sec. Project Engineer
Responsibility
Sports Covered Hall & Bowling Hall –Assuit City – Client Army Civil Projects/ Contractor: Continue Built two sports covered hall, one bowling hall, and recreation area. Following a civil work, Ensure that work is done safely, on time and within budget and to the right quality 3/7
standards. Supervision construction activities Follow-up the sub- contractors works on site, manage recourses
Nov 98 – Feb 2001:
Contractor Engineer
Responsibility
17 Multi-Floors building apartments & 4 Floors Mall building Alexandria
- Client Army Civil Projects/ Contractor: EgyGo construction company – Supervision construction activities (from foundation tell finishing)-Follow- up the sub-contractors works on site, manage recourses and Ensure work is done safely, on time under supervision from PM. Keep the Project Manager (PM) and others informed about project status and problem solving for issues that may impact the project or client relation.
July 97 – Sept 98:
Consultant engineer
Responsibility
Maintenance & Restoration Al-Nobari Water Pump Station # 3 Engineering Consultant - Dr. Osama AlShafie Office – Inject the soil with grout cement all around the pump station and repair work for concrete and reinforcement bars.
Jan95 – June 97:
Site Project Engineer
Responsibility
Military Administration Engineering (Army Service) – Owner Egyptian Army – Contractor Talat Mustafa
Client engineer to supervision the construction of 44 apartments building, 5 floors each and include roads & landscape work – Army Officer Residential accommodation AbuKair Alexandria – Phase 3 4/7