Post Job Free

Resume

Sign in

Civil Engineer Site

Location:
Riyadh, Saudi Arabia
Salary:
10,000
Posted:
May 19, 2021

Contact this candidate

Resume:

ALLAN P. GABIOLA

Mobile No. : +966-*********

Address: No. 139 Bocboc East

Aguilar, Pangasinan

Philippines

E-mail Address: admjfb@r.postjobfree.com

To apply the skills, knowledge and values gained from my previous working experience as a Civil Engineer. I envision myself as part of a company that promotes professionalism, equal opportunity, continuous learning, professional development, teamwork, and financial growth.

POSITION : QUANTITY SURVEYOR / SENIOR SITE ENGINEER (CIVIL)

Date of Birth : June 11,1969

Place of Birth : Jiabong, Western Samar

Gender : Male

Religion : Islam

Civil Status : Married

Citizenship : Filipino

Height : 170 cm

Weight : 78 kg.

Passport No. : EB6312753

Language Spoken : Tagalog, English & Arabic

1986-1992 Eastern Visayas State University

1982-1986

B.S. in Civil Engineering

High School Diploma, Samar National School, Catbalogan, Samar 1976-1982 Elementary Diploma, Jiabong Elem. School, Jiabong, Samar PERSONAL INFORMATION

ACADEMIC BACKGROUND

SUMMARY:

I am a professional civil engineer with 25years experience in civil engineering and construction with different engineering discipline as site engineer, land surveyor, civil work inspector, Quantity Surveyor and project engineer for water treatment plant project, roads, utilities such as storm water drainage, Sewer lines, water lines, telecommunication, pipelines for oil and gas, site development and buildings.

Quantity Surveyor, SAUDI COMPANY FOR PRE-FABRICATED BUILDINGS LLC. P.O. Box 58645, Riyadh 11515

Saudi Arabia

Tel no. (01) 4643945, 2174404

August 15, 2014 – Present Riyadh, KSA

- Preparation of material take off (BOQ) prior to purchasing of materials as per project requirements.

- Check materials specification as per client requirements.

- Updates BOQ as per changes of materials in revision of shop drawings.

- Preparation of monthly progress billing.

- Evaluation of additional works for variation of claims to the client.

- Coordinate with engineering department regarding with shop drawings details.

- Coordinate with quality control department regarding materials specification prior to preparation of purchase order.

- Updates available materials on hand in the warehouse.

- Coordinate with project manager with regards to material requirements in every project site.

- Help estimation department in calculation and preparation of documents prior to submission of bids.

Quantity Surveyor, DAEWOO E&C (Groupement de Daewoo) Kumho Asiana First Tower 57

Sinmunno 1-ga, Jongno-gu

Seoul 110-713, Korea

March 04, 2013 – March 04, 2014 Boughezoul New Town Development Project Client: EPIC (Algeria Government)

Algeria, Africa

WORK EXPERIENCE:

- Estimate earthworks quantity for Road works, Gallery Technic, Used and Rain Water, Potable and Non Potable Water.

- Check As-built quantity.

- Updates approved plans drawings checklist.

- Evaluation of subcontractor monthly billing.

- Gather all monthly accomplishment report from

construction team and prepare all documents of monthly billing and submit to clients for approval.

- Preparation of design drawings for approval to be submitted to the client.

- CCTV works of Used and Rain water pipelines as required by the clients.

- Estimates of Bill Quantity of Materials.

- Site visit for any additional quantity to be added in monthly billing.

- Prepare new quantity for Variation of works.

Senior Site Engineer, (Waterline & Sewer line), MACE Co. P.O. Box 2307, Abu Dhabi, UAE

November, 2009 – May, 2012 Contract No. 3/1/180/1-1 Upgrading of Al-Salam St. Abu Dhabi, UAE

Client: SSBD JV / ADSSC / TRANSCO / ADDC

Contract No. 0-1792 Rehabilitation and Replacement of Existing Sewerage line in Abu Dhabi Island Category D Client; ADSSC / DORSCH GRUPE

`

- Supervise manual excavation of trial pit for waterline and sewer line prior to start excavation works and locating existing utilities crossing and along the line.

- Supervise excavation works, shoring and fixing of support or protection of existing utilities crossing along the line for water line & sewer line.

- Supervise pipe laying works and fixing of fittings for water line and sewer line.

- Check IFC drawing for construction.

- Supervise construction of chambers and manholes for water line and sewer line.

- Preparation of bar bending schedule for manholes and chambers.

- Preparation RFI and site instruction drawing due to construction constraints at site.

- Supervise backfilling works and follow up compaction test in every layer for water line and sewer line

- Prepare bill of quantity of materials and equipment needed at site.

- Coordinate with the client representative engineers and consultants.

- Report to the Project Manager for any constraint, obstruction and problem at site.

- Prepare daily site progress report and daily work ahead schedule.

- Prepare inspection request and submit to QC personnel.

- Approved Transco competent person for working near or crossing waterlines and electrical existing lines.

- Preparation and execute shutdown connection to existing waterlines of TRANSCO and ADDC.

Project Engineer (civil), Kharafi National Co. LLC P.O. Box 26831, Abu Dhabi, UAE

October 2008 – September 2009 ISTP1 ADWEA Water Treatment Plant BOOT Project Al-Wathba, UAE

Client: ADSSC

- Overseeing all site requirements such as following up IFC drawings, shop drawings and their approval.

- Following up submission such as method of statement and working permits.

- Obtaining approval from clients and authorities.

- Following up of work schedule, work progress and all execution of site works.

- Prepare method of statement for every work prior to commencement of work upon approval by clients.

- Prepare inspection request for work and materials on sight prior to the next work activity.

- Responsible for materials submittal, approvals, orders and arrival at site.

- Coordinating with materials supplier for deliveries.

- Following up with subcontractors, attending site meetings, and client/consultants site inspection.

- Prepare bar bending schedule and estimates of materials per structure.

- Overseeing safety matters on site and other ad hoc on site.

- Prepare daily and weekly progress report and submit to the construction manager.

Civil Engineer / Quantity Surveyor, AL HUDA ENGINEERING WORKS P.O. Box 17015, Doha, Qatar

July 17, 2007 – Aug. 2008 ERC 1416 C5A Salah Al Deen Street Client: ASHGAL

AL-MURAH WEST, Al-Rayyan, Qatar

P020 AL-KHOR INTERNATIONAL SCHOOL

Primary School and 2 Kharamma Sub-station

Client: RASGAS (217 million QR)

- Oversight of the projects in conformity to policies and practices in Billing preparations and Budget monitoring.

- Oversight of the projects Construction schedule.

- Valuation of Monthly Progress Billing.

- Bill of Quantities take off from drawings (AFC & AS- BUILT).

- Evaluation of Subcontractor claims and Monthly Billing.

- Measurements of As-Built quantities.

- Estimates of Bill Quantity of Materials.

- Provide cost analysis (Profit & Loss) of the project.

- Prepare Variation Orders, Price escalation and Claims. Civil Engineer/Quantity Surveyor, Matouq Habib Al-Beladi Establishment and Contracting P.O. Box 5722, Hofuf 31982, Al-Hassa, K.S.A.

June, 2003 – April 2007 Al-Hassa Irrigation Development D2 Project Al-Jubail to Al-Qara

Al-Hassa, K.S.A.

Al-Hassa Waterline and Drainage Project

Al-Mahdood Village

Al-Hassa, K.S.A.

College of Medicine and Pharmacy Building

King Fahd University (w/ Fast Contracting Co.)

Al-Hassa, K.S.A.

Al-Hassa 75 km. Ring Diversion Road

Salwa to Al-Oyoun, Dammam Highway (w/ Al-Enjaz Co.) Al-Hassa, K.S.A.

Shaabiya Sceco Sub-station

Main Contractor: Saudi bin Laden Group

Al-Hassa, KSA

- Oversight of the projects in conformity to policies and practices in Billing preparations and Budget monitoring.

- Oversight of the projects Construction schedule.

- Valuation of Monthly Progress Billing.

- Bill of Quantities take off from drawings (AFC & AS- BUILT).

- Evaluation of Subcontractor claims and Monthly Billing.

- Measurements of As-Built quantities.

- Estimates of Bill Quantity of Materials.

- Provide cost analysis (Profit & Loss) of the project.

- Prepare Variation Orders, Price escalation and Claims.

- Coordinate with the Client regarding reference benchmark and established temporary benchmark around project site for site layout and elevation.

- Supervise excavation work for the foundation and other Building utilities including Fence and Landscaping

- Layout Building Footing and Column and Wall alignment including Elevation as per Design.

- Supervise backfilling work for the foundation and other utilities.

- Supervise Road Embankments laying including Sub-grade and Sub-base.

- Check Road centerline and offset prior to laying of fill materials.

- Layout of Embankments layer elevation.

- Check fill materials mixing at the stock file before transporting to the site.

- Supervise Cut and Fill work in high and low Area along Road alignment.

- Supervise Road preparation prior to spraying of Prime coat and Tack coat at .15 to .38 kg/m2 prior to Asphalt work.

- Supervise Road Asphalt laying.

- Supervise excavation for foundation of Sceco Sub-station.

- Check setting out lay-out.

- Supervise mixing for backfilling materials on foundation.

- Supervise pipes installation for cables.

- Supervise civil work construction.

- Supervise cables installation.

- Coordinate with the Saudi bin Laden group Engineers. QC Inspector (Civil Work), Comsys Philippines Incorporated (Japanese Company) 4th Floor RFM Corporate Centre Pioneer st.

Pasig City, Philippines

June, 2001 – NOV. 2002 Digetel Crossing Broadband Project Cavite Province to Makati City Loop

Philippines

- Performing inspection and coordination for on-going site preparation.

- Coordinates between project management and sub-

contractors to ensure job compliance in accordance with project specification.

- Identifies and reports non-conformance to known standards using various measuring and testing method.

- Generates reports of conditions found during inspection activities.

- Notifies Construction Management of significant problems.

- Completes documentation necessary to attest to satisfactory completion of inspection or test activities.

- Compilation of inspection test result.

Site Engineer, McCONNELL DOWELL PHILIPPINES (Australian Company) Suite 706 Richville Corporate Centre 1314 Commerce Ave. Alabang, Muntinlupa City, Philippines

July, 1999 – May 2000 SHELL REFINERY (Tabangao) to FIRST GAS (Sta.Rita) First Gas Pipeline Project (OFFSHORE)

Batangas City, Philippines

- Check approved planned for construction.

- Coordinate with land surveyor regarding staking survey for pipeline centerline and profile prior to construction works.

- Check all heavy equipment and operators certificates before mobilization to working sites.

- Construction of access roads beside the pipeline centerline and inside the right of way stated on the permits acquired by the PRO.

- Mobilization of heavy equipment and machineries to be used for pipeline construction.

- Supervise excavation works as per pipeline approved centerline coordinate mark by land surveyor and up to approved formation level.

- Coordinate with pipeline and welding supervisor for pipe stringing start and end point as per pipeline welding joints and intersection point schedule.

- Supervise lowering of pipes inside the trench.

- Supervise preparation of working area for welding of joints inside the trench.

- Supervise backfilling works.

- Prepare daily and weekly accomplishment schedule and reports.

- Prepare inspection request for accomplished works.

- Reports to the construction manager regarding on going works progress and problems encountered at sites.

Project Engineer, Netelcomm Incorporated

Ground floor LLANAR BUILDING

Santolan Road, Cubao, Quezon City, Philippines

Jan, 1995 – Dec. 1998 PHILCOM EXPANSION PROJECT

CDO EXCHANGE

Cagayan de Oro City, Mindanao, Philippines

- Prepare Project implementation schedule and arrange manpower and equipment.

- Supervision of construction works.

- Prepare daily and monthly accomplishment report.

- Prepare material estimates and requisition of materials as per weekly schedule activity.

- Coordination to the Client regarding work accomplishment and progress including construction constraints subject for site instruction.

- Prepare monthly valuation progress billing.

- Prepare Monthly progress report financial statement and forwarded to the head office.

- Prepare and Check As-Built drawing at the end of project for handing over.

- Resolve work related problems and recommend measures to improve and develop for quality standards conform to engineering design and specification.

- Supervise rectification work as per Client instruction.

- Reconcile all the materials used and in hand after completion of the project and settlements of accounts and cash spend in the project.

Civil Work Supervisor, Sumitomo Tranche NTP 1-1 Project Rm. 101 Union Square Condominium

15th Ave. Cubao, Quezon City, Philippines

Jan1993 – Dec. 1994 NTP 1-1 PROJECT

Luzon Provinces and Bicol Region

Philippines

- Prepare weekly work schedule.

- Supervise civil works construction.

- Estimates Bill Quantity of Materials.

- Prepare daily, weekly and monthly progress report.

- - Knowledgeable in using Microsoft Office Programs (MS Project, Word and Excel).

- Skill in working independently or as a team leader.

- Skill in Progress Billing preparations and Monthly Accomplishment Reports.

- Knowledge in Auto cad (2000, 2002, 2005, 2007).

- Knowledge in using and operating SOKKIA TOTAL STATION.

- Knowledge in using any brand of DUMPY LEVEL.

SKILLS



Contact this candidate