MUHAMMAD NADEEM SHAH
(Associate Civil Engineer and Quantity Surveyor)
Cell # 0092-306-1837017, 0092-316-***-****
Email Address: ***************@*****.***
Skype:- muhammad.nadeem818
Postal Address: House No:- 355/Bv, near Golden Cinema, Bagh-o-Bahar road, Fareed Abad, Tehsil Khanpur city, Disttrict. Rahim Yar khan, Punjab, Pakistan.
CODE OF PROFESSIONAL PRACTICE
Uncompromised Honesty and dedication for the Disbursement of my Role as a Professional QS Engineer for the Benefit of the Employer, for the service to community and for self-development and well-being.
OBJECTIVE:
Seeking a challenging and rewarding career in Construction with a dynamic organization that offers me the opportunities to use my experience and knowledge for professional development and personal growth, and enabling me to contribute positively towards the organization’s profitability, goals and objectives.
EDUCATION:
Diploma of Associate Engineer Matriculation
(CIVIL) 1991 1988
Government College of technology, B.I.S.E, Bahawalpur
Bahawalpur.
EXTRA EDUCATION:
Office Management 01 Year Bright Institute of computer science, Khanpur.
Auto CAD 01Year Bright Institute of computer science, Khanpur.
Corel Draw 01Year Bright Institute of computer science, Khanpur.
In Page 01Year Bright Institute of computer science, Khanpur.
RELATED TRAINIG PROGRAMS & CERTIFICATES:
Eight weeks Training of 3D max.
Six Months Training of basic home designing concepts.
Three Moths practical training of Auto CAD.
Certificate in Risks and claims in construction contracts as per FIDIC.
Engineering, Design and Quantity Surveying Skills:
More than 29 years’ experience in the following major Disciplines:
Infrastructure
Sewerage.
Water Supply
Road Works.
Project Management
Concrete Work
Building Works.
Culverts.
Canals.
Commercial, Residential & Industrial building Designing
Over Head Reservoirs.
Engineering, Design and Quantity Surveying Skills
Executing a job as per specification and as per drawings.
To prepare execution plan, cross sections, IPCs, EPCs, claims (Escalation, insurance, idling), bidding document and final bills.
To prepare and submit reports including PMR, ePMR and ePMS on execution plan.
To ensure payments record from the clients and clearance of outstanding dues.
To calculate & ensure quantum of work done as per design.
To conduct & prepare rate analysis for all materials.
To undertake daily visit to project site and ensure progress updates.
To prepare & submit the bar bending (design of steel) schedule to consultants for execution of structures.
To prepare briefings / presentations both for management as well as clients.
To prepare EOT (Extension of Time) cases for submission to consultant / client for approval purpose.
To prepare variation orders (contains variation / enhancement of quotations) for submission to clients.
Any other task as assigned by the Project Manager.
Identifying the extra works as per BOQ.
Compute the Extra Work Quantity as Per BOQ.
Calculation of Quantities as per site and as per drawings.
Highlighting the Technical queries and suggesting reliable solution.
Supervising the Execution jobs and managing the resources as per requirement.
Checking and preparation the bar bending schedule and shop drawings.
Site inspection including shuttering reinforcement water stopper, joint embed items and all civil parts.
To work out the Earth work quantities for different kind of structure.
Cross sectioning of the road for design work.
Design of the House of Dr. Jam Jamil 02 Kanal( Triple Stories)Khanpur.
Design of the house of Khawja Maqsood(Triple stories) 16 Marla .
Design of Honda City at Khanpur (01 Kanal)
Design of the Mehak Hospital, Kasur( 05 Kanal)
Design of the house of MPA, Sardar Ameer Nawaz khan Chandia at Khanbeela.( 08 Kanal)
Design of Khan Plaza at Khanpur (32 Marla)
Design of the house of Dr. ahsan in Khanpur city(02 Kanal)).
Design of the Hassan Hospital at Khanpur(32 Marla)
Design of Batool Rice & Oil Mills at Khanpur( 9.5 Acres).
Design of Emergency Block ( Trauma Center ) for Tehsil Head Quarter Hospital,
Khanpur district Rahim Yar Khan.
Structural and Architectural designing of Aysha Floor Mills, Khanpur district Rahim Yar Khan.
Extra Qualification:
Very Good Work Experience of Auto Cad 2d &3d.
Good Work Experience of Autodesk 3Ds Max.
Basic Knowledge of Archi Cad 06 Building Solutions.
Basic Knowledge of sketch up 6.
Good Work Experience of Microsoft Office.
Good Work Experience of 3D home Architects.
Good Work Experience of inpage (English & Urdu).
Good work Experience of Corel Draw.
Instruments Expertise:
Auto Levels All Kinds.
Levels and Theodolights.
All Types of Computer Applications.
Work Experience
Construction supervision and quantity surveying responsibilities of commercial & residential buildings, Over Head Water Reservoirs, Water Supply, Buss terminal, Roadway construction, water courses and all civil works.
Languages
Urdu
Fluent
English
Fluent
Punjabi
Fluent
Arabic
Good
Professional Career 29 + Years:
Professional Career 29 + Years:
INFRASTRUCTURE DEVELOPMENT AUTHORITY OF THE PUNJAB
Designation: Quantity Surveyor - MEP
Duration: May 2019 to Till Now
Project: Estimation, PC I for new projects
Client: Health Department of The Punjab.
Preparation of engineering estimates, rate analysis, PC – I for new health projects.
Verification of Interim payments certificates.
Verification of variation orders.
Verification of price Escalation.
Technical sanctions of the new projects.
Preparation of Bid evaluation reports of the tenders.
Preparation of tender documentations.
AYAZ BUILDERS( Constructors & Builders).
Designation: Chief Quantity Surveyor/Acting Project Manager
Duration: March 2016 to Feb 2018
Project: Construction of Khawaja Fareed University of Engineering & Information Technology, Rahim Yar Khan.
Client: K.F.U.E & I.T(Government Of Punjab, Pakistan)
Prepare QIR’s for survey validation of quay wall alignment.
Prepare cross sections for road and bar bending schedules.
Putting All Survey Data for Site Surveyors Using AutoCAD & Related Applications.
Prepare cost estimates and construction specifications of the entire proposed construction project assigned.
Compute Extra Quantities Following the BOQ.
Prepare PMR. EMR CFS, and all reports and returns.
Supervise and responsible to check final lay out prior to excavation and construction.
Responsible to coordinate with inspector/consultant.
Make accomplishment reports.
Prepare Rate Analysis of Non Schedule for different items.
Ensures that materials and workmanship are at all times in accordance with the plans and specifications.
Witnesses critical activities of the project especially in concrete pouring and regarding steel fixing.
Prepare reports and scheduling of project as directed by the PM & MD.
Prepare project estimates and material requisition.
Supervise the execution of each activity of the project.
To prepare execution plan, cross sections, IPCs, EPCs, claims (Escalation, insurance), bidding document and final bills.
To prepare and submit reports including PMR, ePMR and ePMS on execution plan.
To ensure payments record from the clients and clearance of outstanding dues.
To calculate & ensure quantum of work done as per design.
To conduct & prepare rate analysis for all materials.
To undertake daily visit to project site and ensure progress updates.
To prepare & submit the bar bending (design of steel) schedule to consultants for execution of structures.
To prepare briefings / presentations both for management as well as for consultant and client.
To prepare EOT (Extension of Time) cases for submission to consultant / client for approval purpose.
To prepare variation orders (contains variation / enhancement of quotations) for submission to clients.
Any other task as assigned by the OC.
AL RABIAH CONSULTING ENGINEERING SURVICES, DAMMAM, SAUDI ARABIA.
Designation: Quantity Surveyor, Civil
Duration: March, 2014 to March, 2016
Project: Al Ruq’ee Border Exit Facility.
Client: Ministry of Finance, Riyadh, Saudi Arabia.
Check and approve all QIR’s submitted by the contractor.
Check and approve all measurement sheets of the work done.
Prepare and submit reports including PMR, ePMR and ePMS on execution plan.
Prepare cost estimates and construction specifications of the entire proposed construction project assigned.
To calculate & ensure quantum of work done as per design.
Compute and verify Extra Quantities Following BOQ.
To check & verify rate analysis for all materials submitted by the contractor.
To prepare briefings / presentations both for management as well as for clients.
To prepare execution plan, cross sections, IPCs, EPCs, claims (Escalation, insurance, idling), bidding document and final bills.
To undertake daily visit to project site and ensure progress updates.
Responsible to coordinate with engineers and all staff of the consultant.
Make accomplishment reports.
Make fortnightly reports for Client and Head Office.
Witnesses critical activities of the project especially in concrete pouring.
Prepare reports and scheduling of project as required by Project Manager.
Check and approve IPC’s submitted by the contractor.
Coordinates with Ministry for any issue.
Any other task assigned by the Project Manager.
Assist the Project Manager in all finance related matters.
ASIAN CONSULTING ENGINEERS.LAHORE
Designation: Quantity Surveyor/Resident Engineer
Duration: May 2008 to Feb 2014.
Project: Extension Improvement of water Supply Scheme Kot Radha Kishen,
Kasur & establishment of women university Multan.
Client: World Bank (Punjab Municipal Development Fund Company, Pakistan)
Check and approve all QIR’s submitted by the contractor.
Check and approve all measurement sheets of the work done.
Prepare and submit reports including PMR, ePMR and ePMS on execution plan.
Prepare cost estimates and construction specifications of the entire proposed construction project assigned.
To calculate & ensure quantum of work done as per design.
Compute and verify Extra Quantities Following the BOQ.
To conduct & prepare rate analysis for all materials.
To prepare briefings / presentations both for management as well as clients.
To varify execution plan, cross sections, IPCs, EPCs, claims (Escalation, insurance, idling), bidding document and final bills.
Supervise and responsible to check final lay out prior to excavation and construction.
Responsible to coordinate with inspectors and ARE of the consultant.
Make accomplishment reports.
Make fortnightly reports for PMDFC and Head Office.
Ensures that materials and workmanship are at all times in accordance with the plans and specifications.
Witnesses critical activities of the project especially in concrete pouring.
Witnesses critical activities of the projects especially in steel fixing.
Prepare reports and scheduling of project as required by PMDFC and as directed by Project Manager.
Prepare project estimates and material requisition.
Supervise the execution of each activity of the project.
Check and approve IPC’s submitted by the contractor.
Coordinates with PMDFC and clients. (HEC)
Any other task as assigned by the Resident Engineer.
NATIONAL LOGESTIC CORPORATION (NLC) BAHAWALPUR.
Designation: Assistant Project Manager/QS
Duration: May, 02 2007 to April, 30 2008
Project: Chief Minister’s programme for providing of missing
Facilities in ESR & HSR projects
Verify and compute Interim Payment Bills from Contractors.
To prepare execution plan, cross sections, IPCs, EPCs, claims (Escalation, insurance, idling), bidding document and final bills.
To prepare and submit reports including PMR, ePMR and ePMS on execution plan for GHQ.
To ensure payments record from the clients and clearance of outstanding dues.
To calculate & ensure quantum of work done as per design.
To conduct & prepare rate analysis for all materials.
To undertake daily visit to project site and ensure progress updates.
To prepare & submit the bar bending (design of steel) schedule to consultants for execution of structures.
To prepare briefings / presentations both for management as well as clients.
To prepare EOT (Extension of Time) cases for submission to consultant / client for approval purpose.
To prepare variation orders (contains variation / enhancement of quotations) for submission to clients.
Prepare detailed estimates for new projects & repair works.
Supervise and responsible to check final lay out prior to excavation and construction.
Make accomplishment reports.
Witnesses critical activities of the project especially in concrete pouring & steel binding.
Prepare reports and scheduling of project as directed by the District Project Manager.
Supervise the execution of each activity of the project through a team of sub engineers and SDO’s.
Supervise and responsible to check final lay out prior to excavation and construction of schools, BHU’s, RHC’S Colleges & Universities.
Any other task as assigned by the district Project Manager.
SARCO (SHIEKH ABDUL RAZZAQ AND CO, MULTAN)
Designation: Quantity Surveyor
Duration: Jan 2007 to April 2007
Project: Rehabilitation and Improvement Shahi Road
Client: Provincial High Way.
Prepare QIR’s for survey validation.
Prepare cross sections for road and bar bending schedules for RCC structures.
Putting All Survey Data for Site Surveyors Using AutoCAD & Related Applications.
Prepare cost estimates and construction specifications of all proposed construction project assigned.
Compute Extra Quantities Following BOQ.
To prepare execution plan, IPCs, EPCs, claims (Escalation, insurance, idling), bidding document and final bills.
To prepare and submit reports including PMR, ePMR and ePMS on execution plan.
To ensure payments record from the clients and clearance of outstanding dues.
To calculate & ensure quantum of work done as per design.
To conduct & prepare rate analysis for all materials.
To undertake daily visit to project site and ensure progress updates.
To prepare & submit the bar bending (design of steel) schedule to consultants for execution of structures.
To prepare briefings / presentations both for management as well as for client.
To prepare EOT (Extension of Time) cases for submission to consultant / client for approval purpose.
To prepare variation orders (contains variation / enhancement of quotations) for submission to clients.
Supervise and responsible to check final lay out prior to excavation and construction.
Responsible to coordinate with inspector/consultant.
Make accomplishment reports.
Ensures that materials and workmanship are at all times in accordance with the plans and specifications.
Witnesses critical activities of the project especially in concrete pouring and regarding steel fixing.
Prepare reports and scheduling of project as directed by the C.E.O
Prepare project estimates and material requisition.
Supervise the execution of each activity of the project.
Any other task as assigned by the C.E.O.
FWO (FRONTIER WORKS ORGANIZATION)” 755 C.T,E(Karachi )
Designation: Quantity Surveyor
Duration: April 2006 to November 2006
Project: Rehabilitation and Improvement of Qayum Abad fly over To
Dawood Chorangi .(Korangi – 8000)
Consultants: A.A Associates Karachi
Prepare QIR’s for survey validation of quay wall alignment.
Prepare cross sections for road and bar bending schedules.
Putting All Survey Data for Site Surveyors Using AutoCAD & Related Applications.
Prepare cost estimates and construction specifications of the entire proposed construction project assigned.
Compute Extra Quantities Following BOQ.
Prepare cross sections of the road.
Supervise and responsible to check final lay out prior to excavation and construction.
Responsible to coordinate with inspector/consultant.
Make accomplishment reports.
Ensures that materials and workmanship are at all times in accordance with the plans and specifications.
Witnesses critical activities of the project especially in concrete pouring and regarding steel fixing.
Prepare reports and scheduling of project as directed by the CO.
Prepare project estimates and material requisition.
Supervise the execution of each activity of the project.
To prepare execution plan, cross sections, IPCs, EPCs, claims (Escalation, insurance, idling), bidding document and final bills.
To prepare and submit reports including PMR, ePMR and ePMS on execution plan.
To ensure payments record from the clients and clearance of outstanding dues.
To calculate & ensure quantum of work done as per design.
To conduct & prepare rate analysis for all materials.
To undertake daily visit to project site and ensure progress updates.
To prepare & submit the bar bending (design of steel) schedule to consultants for execution of structures.
To prepare briefings / presentations both for management as well as clients.
To prepare EOT (Extension of Time) cases for submission to consultant / client for approval purpose.
To prepare variation orders (contains variation / enhancement of quotations) for submission to clients.
Any other task as assigned by the OC.
HUMAN DEVELOPMENT FOUNDATION(HDF), RAHIMYARKAHN.
Designation: Resident Engineer/Quantity Surveyor.
Duration: June 2005 To March 2006
Project: Khushhali Bank Funded different Projects
Client: Khushhali Bank, Pakistan.
Prepare QIR’s for survey validation of quay wall alignment.
Supervise the projects by the team of sub engineers, Engineers and SDO.
Verify cross sections for road and bar bending schedules.
Putting All Survey Data for Site Surveyors Using AutoCAD & Related Applications.
Prepare cost estimates and construction specifications of the entire proposed construction project assigned.
Compute Extra Quantities Following BOQ.
Responsible to check final lay out prior to excavation and construction.
Responsible to coordinate with inspector/consultant and client.
Make accomplishment reports.
Attend meeting with Client Consultant and contractors.
Ensures that materials and workmanship are at all times in accordance with the plans and specifications.
Witnesses critical activities of the project especially in concrete pouring and regarding steel fixing.
Prepare reports and scheduling of project as directed by the Chairman.
Prepare project estimates and material requisition.
Supervise the execution of each activity of the project.
To prepare execution plan, cross sections, IPCs, EPCs, claims (Escalation, insurance, idling), bidding document and final bills.
To prepare and submit reports including PMR, ePMR and ePMS on execution plan.
To ensure payments record from the clients and clearance of outstanding dues.
To calculate & ensure quantum of work done as per design.
To conduct & prepare rate analysis for all materials.
To undertake daily visit to project site and ensure progress updates.
To prepare & submit the bar bending (design of steel) schedule to consultants for execution of structures.
To prepare briefings / presentations both for management as well as clients.
To prepare EOT (Extension of Time) cases for submission to consultant / client for approval purpose.
To prepare variation orders (contains variation / enhancement of quotations) for submission to clients.
Any other task as assigned by the OC.
NRSP (NATIONAL RURAL SUPPORT PROGRAM)RAHIMYARKHAN
Designation: Quantity Surveyor
Duration: Sept, 2004 to May, 2005
Project: Rehabilitation and Improvement of water coarses
Consultants: NESPAk
Prepare QIR’s for all construction activities.
Prepare cross sections for road and bar bending schedules of RCC structures.
Putting All Survey Data from surveyors Using AutoCAD & Related Applications.
Prepare cost estimates and construction specifications of the entire proposed construction project assigned.
Compute Extra Quantities Following BOQ.
Prepare design and detail estimates for all kind of projects i.e water course, brick soling, sewerage, water supply schemes, turbines and tube wells etc.
To prepare execution plan, cross sections, IPCs, EPCs, claims (Escalation, insurance, idling), bidding document and final bills.
To prepare and submit reports including PMR, ePMR and ePMS on monthly basics.
To ensure payments record from the clients and clearance of outstanding dues.
To calculate & ensure quantum of work done as per design.
To conduct & prepare rate analysis for all materials.
To prepare tender documents.
Prepare cash statements and project status reports.
To undertake daily visit to project site and ensure progress updates.
To prepare & submit the bar bending (design of steel) schedule to consultants for execution of structures.
To prepare briefings / presentations both for management as well as clients.
To prepare EOT (Extension of Time) cases for submission to consultant / client for approval purpose.
To prepare variation orders (contains variation / enhancement of quotations) for submission to clients.
Supervise and responsible to check final lay out prior to excavation and construction.
Responsible to coordinate with inspector/consultant.
Make accomplishment reports.
Ensures that materials and workmanship are at all times in accordance with the plans and specifications.
FWO (FRONTIER WORKS ORGANIZATION) 788 C.T.E
Designation: Quantity Surveyor
Duration: June 2003 to September 2004
Project: Rehabilitation and Improvement of N-5
Consultants: NESPAK.
Prepare inspection request for survey validation of quay wall alignment.
Prepare cross sections for road and bar bending schedules.
Prepare QIR’s for work done.
Putting All Survey Data for Site Surveyors Using AutoCAD & Related Applications.
Prepare cost estimates and construction specifications of all the proposed construction project assigned.
Compute Extra Quantities Following BOQ.
Prepare cross sections of the road.
To prepare execution plan, cross sections, IPCs, EPCs, claims (Escalation, insurance, idling), bidding document and final bills.
To prepare and submit reports including PMR, ePMR and ePMS on execution plan.
To ensure payments record from the clients and clearance of outstanding dues.
To calculate & ensure quantum of work done as per design.
To conduct & prepare rate analysis for all materials.
To undertake daily visit to project site and ensure progress updates.
To prepare & submit the bar bending (design of steel) schedule to consultants for execution of structures.
To prepare briefings / presentations both for management as well as clients.
To prepare EOT (Extension of Time) cases for submission to consultant / client for approval purpose.
To prepare variation orders (contains variation / enhancement of quotations) for submission to clients.
Supervise and responsible to check final lay out prior to excavation and construction.
Responsible to coordinate with inspector/consultant.
Make accomplishment reports.
Ensures that materials and workmanship are at all times in accordance with the plans and specifications.
Witnesses critical activities of the project especially in concrete pouring and regarding steel fixing.
Prepare reports and scheduling of project as directed by the CO.
JAMIA ARBIA MAKHZAN-UL-ULOOM” (Khan pur District Rahim Yar Khan)
Designation: Quantity Surveyor/ Site Engineer
Duration: May, 1999 to May 2003
Project: Full Infrastructure of Jamia Arabia Makhzan ul uloom
Consultants: A.A Associates Karachi
Prepare QIR’s for survey validation of quay wall alignment.
Conduct joint survey checking of formworks and steel activities.
Prepare Bar bending schedule and IPC’s.
Setting out base line and responsible to check final lay out prior to installation of pre-cast blocks.
Responsible to coordinate with inspector/consultant/R.E
Make accomplishment reports.
Prepare cost estimates and construction specifications of the entire proposed construction project assigned.
Ensures that materials and workmanship are at all times in accordance with the plans and specifications.
Witnesses critical activities of the project especially in concrete pouring.
Prepare reports and scheduling of project as directed by the section Head.
Prepare project estimates and material requisition.
Execute all civil works with the team of sub engineers.
To ensure payments record from the clients and clearance of outstanding dues.
To calculate & ensure quantum of work done as per design.
To conduct & prepare rate analysis for all materials.
To undertake daily visit to project site and ensure progress updates.
To prepare & submit the bar bending (design of steel) schedule to consultants for execution of structures.
To prepare briefings / presentations both for management as well as clients.
To prepare EOT (Extension of Time) cases for submission to consultant / client for approval purpose.
To prepare variation orders (contains variation / enhancement of quotations) for submission to clients.
Any other task as assigned by the C.E.O.
HAJI MOUSA KHAN AND CO, LAYYAH, PAKISTAN.
Designation: Quantity Surveyor/Site Engineer.
Duration: Aug, 1997 TO April, 1999
Project: Dairah Din Pannah To Layyah Road
Client: Provincial Highway, Layyah
Prepare inspection request & QIR’s.
Conduct joint survey checking of formworks and steel activities.
Prepare Bar bending schedule and IPC’s.
Setting out base line and responsible to check final lay out prior to installation of pre-cast blocks.
Responsible to coordinate with inspector/consultant/R.E
Make accomplishment reports.
Prepare cost estimates and construction specifications of the entire proposed construction project assigned.
Ensures that materials and workmanship are at all times in accordance with the plans and specifications.
Witnesses critical activities of the project especially in concrete pouring.
Prepare reports and scheduling of project as directed by the section Head.
Prepare project estimates and material requisition.
Execute all civil works with the team of sub engineers & SDO’s.
To prepare execution plan, cross sections, IPCs, EPCs, claims (Escalation, insurance, idling), bidding document and final bills.
2. To prepare and submit reports including PMR, ePMR and ePMS on execution plan.
3. To ensure payments record from the clients and clearance of outstanding dues.
4. To calculate & ensure quantum of work done as per design.
5. To conduct & prepare rate analysis for all materials.
6. To undertake daily visit to project site and ensure progress updates.
7. To prepare & submit the bar bending (design of steel) schedule to consultants for execution of structures.
8. To prepare briefings / presentations both for management as well as clients.
9. To prepare EOT (Extension of Time) cases for submission to consultant / client for approval purpose.
10. To prepare variation orders (contains variation / enhancement of quotations) for submission to clients.
Any other task as assigned by the Project Manager.
TOP TRUST INTERNATIONAL, KHANPUR, PAKISTAN
Designation: Quantity Surveyor/Draftsman Civil
Duration: Jan 1995 To Aug 1997
Project: Residential and Commercial projects
Consultants: Tehsil Municipal Administration (TMA).
Prepare all kinds of detail plans for residential, commercial, and industrial projects.
Prepare bar bending schedules of RCC structures.
Prepare all kinds of BOQ for residential, commercial, and industrial projects.
Prepare cost estimates and construction specifications of the entire proposed construction project assigned.
Compute Extra Quantities Following BOQ.
To prepare execution plan, bidding document and bills.
To prepare and submit reports to manager.
To ensure payments record from the TMA and clearance of outstanding dues.
To calculate & ensure quantum of work done as per design.
To conduct & prepare rate analysis for all materials.
To undertake daily visit to project site and ensure progress updates.
To prepare briefings / presentations both for management as well as for TMA.
To prepare variation orders (contains variation / enhancement of quotations) for submission to TMA.
Supervise and responsible to check final lay out prior to excavation and construction.
Responsible to coordinate with contractor and TMA.
Make accomplishment reports.
Ensures that materials and workmanship are at all times in accordance with the plans and specifications.
Witnesses critical activities of the project especially in concrete pouring and regarding steel fixing.
Prepare reports and scheduling of project as directed by the Manager.
AL TARIQ CONTRACTORS, ENGINEERS, BUILDERS(ATL)
Designation: Sub Engineer, Civil
Duration: March, 1992 To December 1994
Project: Full Infrastructure of Jamia Arabia Makhzan ul uloom
Consultants: A.A Associates Karachi
Prepare inspection request & QIR’s for all project activities.
Conduct joint survey checking of formworks and steel activities.
Prepare Bar bending schedule and IPC’s.
Setting out base line and responsible to check final lay out prior to installation of pre-cast blocks.
Responsible to coordinate with inspector/consultant/R.E
Make accomplishment reports.
Ensures that materials and workmanship are at all times in accordance with the plans and specifications.
Witnesses critical activities of the project especially in concrete pouring.
Prepare reports and scheduling of project as directed by the section Head.
Prepare project estimates and material requisition for construction purpose.
Execute all civil works with the team of sub engineers.
To ensure payments record from the clients and clearance of outstanding dues.
To calculate & ensure quantum of work done as per design.
To conduct & prepare rate analysis for all materials.
To undertake daily visit to project site and ensure progress updates.
To prepare & submit for approval, the bar bending