CAREER SUMMARY

A multi disciplined engineering background and organization skills with over 2.5 years experience, covering a wide variety of ELECTRO MECHANICAL PROJECTS with multinational contractors and clients. Competent in the field of design review, monitoring, co-ordination, evaluation, implementation and direct supervision of turnkey projects. Regarded by previous employers as extremely organized, competent, enthusiastic and conscientious employee.

OBJECTIVE

Aspiring to be a part of Dynamic & fast growing organization having motivational working environment, and looking for responsible and challenging assignments that will foster my advancement and long-term relationship in an organization where my experience, education and talent could make significant contributions towards corporate objectives.

KEY STRENGTH

Track record of dedication and sincerity –3 years hands on/at site locally experience on ELECTRICAL PROJECTS from planning, execution, commissioning and handing over to end user.

Trained in ELECTRICAL PROJECTS by Blue Star Limited, India.

M&E Exposure HVAC, Electrical & Fire Fighting Systems

Ability to collect, organize and evaluate information in written and graphic form.

Ability to resolve site problems at the soonest possible time.

Maintain good relationships with the client, consultant and develop a professional team to establish the company as the contractor of choice.

Ability to assume responsibility in ensuring that the respective contractor/supplier performs their duties diligently and expeditiously with the highest standard of professionalism considering the requirement of client and the conceptual design.

Innovative project management of complex, high value and multi discipline contracts which covers the understanding of the conditions of contract and every clause of the specification to establish quality control & assurance.

Ability to lead the team in the absence of the leader and to coordinate the communication amongst all parties involved in the project.

Ability to foresight and identify problems, missing information and insufficiency of proper constructional detail.

Ability to conduct meetings and prepare the minutes.

Ability to resolve site problems at the soonest possible time.

Very comfortable working within national & multi-cultural environment.

Ongoing professional development in project management and application skills.

BELIEFS

Experience is a hard teacher.There just can’t be big enough a problem that can’t be solved by working together within the organization and with the Client by effective communication.

PROJECT EXPERIENCE SUMMARY

From May-2017 to November 2020 and continues

In M/S Blue Star Limited, Bangalore as an Engineer-Project in Electro-Mechanical projects Division.

Good knowledge in Electrical, HVAC & Fire Fighting systems

ROLES AND RESPONSIBILITY HANDLED

Estimation and Costing

Verification, Understanding of Tender Documents Technical Specifications & drawings. Material take off & preparing item Rate for individual items as per the schedule of items mentioned in tenders by considering necessary Basic Rate, Discount, Excise Duty, Sales Tax, Labor rate and profit etc.

Sending and receiving the enquiries, quotations.

Attending to tender negotiations meetings includes suggestions and reviewing the total Project Costing by offering the discount on quoted rates individually.

Project Planning and execution

Evaluating the Contract documents, verifying the Engineering Design for all the LV & Indoor HV Electrical Systems with respect to Project Specifications, Applicable Standards and Local Regulations.

Reviewing the design drawing, specification and implementing for Preparation of construction drawings by guiding the Auto CAD, REVIT Draftsman for the preparation of ducting/cable tray/plant room/Bus duct/Cable Routing drawings for the consultants’ approval

Preparation of material submittals for the consultant’s approval, along with review of the drawings to ensure confirmatory design as per the obtained quotations from the consultant or client.

Preparation of Transformer Load Calculation, Motor Load Calculation, Bus Duct Load Calculation in accordance to the Building survey following the IS Codes & IEC codes

Selection of Light fixtures according to to be luminated spaces of various size, type and atmosphere, Lumens Matrix calculation, Lux Requirement Studies and Sensor wiring for Light Fixtures.

Selection and Design of Bus Duct and Rising Main including Metering Yard.

External Earth Pit works and standards Related to Earthing.

Lighting Arrester Selection, Design and Short Circuit calculation.

Selection of Cables for the right environment, Cable Sizing, Cable Routing and Cable Termination Technology awareness and ability to handle individually.

ELV Systems Cabling, Switch Architecture, CCTV Camera design considerations, Access Controls Systems & Data Centre installation works .

Attending the project award meeting with Architects/ Clients, negotiate with vendors to choose most economical vendor who meets all the project requirements.

Identifying the Problems with Analytical Solutions if any

Material Planning by the efficient utilization of the available raw material and ordering the required material at regular intervals.

Responsible for initiating on site quality control inspections and ensuring that the quality of material /material installation of work in accordance with the acceptance criteria identified for the project. Liaise with QA/QC department for inspection.

Daily reporting and overseeing the actual progress of construction.

Pre commissioning, Testing and commissioning of all installed Equipments based on the parameters provided by manufacture/supplier.

Making complete system handing over and collecting the final bill.

Project Co-ordination

Co-ordinate with the other Engineering disciplines on all aspects during the development of works to ensure the confirmatory design to other services about our requirement by issuing proper technical content.

Coordination with main contractor’s civil team regarding all aspects and clearance of MEP work at site.

Co-ordinate with electrical engineers for containments, Panel’s for air conditioning equipments and controls/integration with fire alarm system for Building management system.

Main initiator to give clearances to main contractor.

To Manage all site installation and coordination of all MEP works during execution phase, to provide safe working environment and resolving day to day technical issues at site with supervisor/foremen.

Safety

Performing step-by-step guidelines on safety audits during installation and storing of

Equipments materials for avoiding mitigating effect.

Classifying the wok activities by evaluating hazards, risk, tolerable and review control action plan.

Identify the risk through cause consequence and dispersion approach.

Comprehensive review of operating procedure and best safety practice for accident prevention.

Achievements

Have been awarded EMPG Execution Excellence Award continuously Twice as Project Engineer in South Region

Winners of Volleyball South India Level in Inter Blue Star Sports

Successfully participated in PLOG RUN in Jayanagar Area on October 2nd 2019

LIST OF PROJECT HANDLED IN INDIA

Some of the major project in which I was actively involved in

Project no-01

1st Floor Coworks- Electrical & HVAC works( Commercial RenovationBuilding )

Project no-02

SJS Enterprises Pvt Ltd- Electrical Works, ELV Systems ( Industry with Clean Room & Ware House)

Project no-03

Karle Infra Pvt Ltd- MEP Co ordinator, Electrical Package Manager, FA PA systems ( Complete Commercial & Retail with IT Infrastructure Buillding - SEZ)

CURRENT SALARY AND DESIGNATION

8.7 LPA( CTC), Asst Manager ( Electro Mechanical Projects Group)

EDUCATION

B.E : Electrical and Electronics Engineering

MTech : Renewable Energy Technologies

University/College : VTU- Graduation, Amrita University- Post Graduation

Percentage : 8.8 CGPA

CERTIFICATION

Undergone technical training and safety management training from M/s. Blue Star Limited, India.

IEEE member, Publication- 1 No.

COMPUTER PROFICIENCY

Packages : Revit, Auto cad, Dialux

MS Office (word, Excel, Power Point).

PERSONAL DATA

Date of Birth : 12th Feb 1993

Nationality : Indian

Language Known : Konkani, Kannada, Hindi, English

Hobbies : Playing Volley Ball, Kabaddi, Wrestling

REFERENCE

COMPUTER PROFICIENCY

By Request Only

Declaration: This is to certify that the above written information is true to the best of my knowledge and if given opportunity, I assure you that I would work to your entire satisfaction.

Place : Bangalore

Date : 16.09.2019

Signature

Gurudath G Prabhu



Contact this candidate