Post Job Free

Resume

Sign in

Mechanical Engineer Piping

Location:
Kolkata, West Bengal, India
Posted:
May 16, 2021

Contact this candidate

Resume:

RESUME

AVIJIT BALA

P

Piping Execution Engineer

QUALIFICATION

West Bengal Council of Technical Education

Diploma in Mechanical Engineer - 2008

Percentage of Marks- 67%

CAREER OBJECTIVE

To take up the responsibilities of a Mechanical Engineer where I can make effective use of my mechanical knowledge in a highly and efficient manner.

Pro Mach Technics

ASNT LEVEL-II - 2014

Class of Marks- 1ST Class

West Bengal Council of Higher Secondary Education

12th Standard - 2002

Percentage of Marks- Pass

CONTACT

admgwd@r.postjobfree.com

ADDITIONAL QUALIFICATION

+91-790*******

Basic Knowledge in AUTO CAD

Basic Knowledge in Compute like MS Office, Internet, E-mail Application etc.

VILL: KASHIPUR; P.O.: BERBARI;

P.S.: BAGDAH; DIST: NORTH 24 PARGANS;

PIN: 743270

PROFESSIONAL EXPERIENCE

Over all more than 09 Years’ Experience in Execution & Inspection of Piping work in different field like Oil Refinery, Water System and Utility System in different Construction Project.

PERSONAL DETAILS

PROFESSIONAL STRENGTHS

Possess excellent decision -making and time management skills.

Ability to solve complex problems by using scientific rules and methods.

Extensive knowledge of designing techniques, tools, and principles involved in production technical plans, blueprints, drawings, and models.

Familiar with quality control, production processes, costs, and techniques for increasing effective manufacture and distribution of goods.

Ability to work under pressure and handle multiple tasks.

Gender : Male

Date of Birth : 05th-Feb-1983

Nationality : Indian

Marital Status : Married

Passport Number : U9672953

Place of Issue : Kolkata

Date of Issue : 26th February-2021

Date of Expiry : 25th February-2031

Home Phone : +91-973*******

Language : Bengali, Hindi & English

JOB RESPONSIBILITIES

Coordinate the workers.

Preparation of daily fabrication report.

List out the materials requirements for the job.

Check the welding quality fabrication.

Co-ordinate between piping and hydro test to ensure unit construction, installation and pre-commissioning progresses to the approved manufacturing plans, erection plans.

Ensure that drawings are correctly interpreted and carried out including field inspection testing requirements to ensure quality of works meets Quality and specifications.

Review latest revision of isometric drawings, plot plans, general arrangement and mechanical/equipment.

Review latest fabrication isometric drawings, pipe supports, general arrangement including plot plans and other documentations.

Monitoring the work progress in pre-fabrication shop and clearing the technical issues.

Raising the technical queries from pre-fabrication part as well as from the execution side and clearing those issues by coordinating with the Clients Design & Engineering Division.

Attending the daily and weekly progress review meeting with the Client and discussing the various issues and constraints affecting the work progress.

Monitoring the work progress in pre-fabrication shop and clearing the technical issues

Conduct safety walk through. In the site in coordination with the safety department on weekly basis.

CAREER HISTORY

Declaration:

Hereby I declare that all the details furnished above are true to my knowledge and belief.

Place: Kashipur Signature

Date: Avijit Bala

PRESENT JOB: Currently Associating with BLUE STAR LIMITED

Since March 2019 to Till Date

Project: - ATL AP Green Field Project, Andhrapradesh

CLIENT:-Apollo Tyres

CONSULTANT: - L & T Technology Services

PREVIOUS EXPERIENCE:

Before Working at BLUE STAR LIMITED I was associated with STAR TRACE PVT.LTD, Since Dec 19 2017 To Till Date, Project :-Installation Of 3.29 Mtpa Copper Ore Tailing Beneficiation Plant, CLIENT:-Hindustan Copper Limited, CONSULTANT:- Mn Dastur& Company Limited.

Before Working at STAR TRACE PVT.LTD I was associated with GILLANDERS ARBUTHNOT & CO. LT Kothari Group (MICCO DIVISION) Since August 2013.

Associating with Revamping of 592 cum E -Blast Furnace at TATA STEEL, Jamshedpur Since May, 2016 with Consulting Partner TATA CUNSULTING ENGINEERS (TCE).

Looking after total Execution & Inspection of piping work for Water system, Utility System.

Fabrication & Erection of Pipe & Pipe Support structure.

Involved in Relining of Blast furnace-1 at JINDAL SOUTH WEST (JSW), Bellary since May, 2015 as Site Engineer (Piping).

Associated with fabrication, Erection & Inspection of piping work for Water system, Utility System of 2307 cum Blast furnace.

Involved in Shut Down Project of FCC Unit at Gujarat IOCL as a Third Party Inspector since March, 2015 under TUV Engineering Pvt. Ltd as Inspection Engineer.

Inspection of Piping (Gas Line, Oil line, High Pressure Line) work in different sector of FCC Unit like CO Boiler, Heat Exchanger.

Involved in Capital Repair of 3800 cum Blast Furnace-1 at VIZAG STEEL PLANT, Vishakhapatnam since February, 2014 with Consulting Partner MN DASTUR CO & Design Partner SIMENs VAI as Asst. Engineer (Piping)

Associated in Fabrication & Erection of Cooling System, Utility System of Blast Furnace Proper and Gas Cleaning Plant.

Associated in fabrication & erection of of new COAL GASIFICAPION PLANT Water System & Gas Piping.

Before working at GACL (MICCO) I was associated with INDIA INDUSTRIAL ENTERPRISE PVT. LTD. since November 2010.Involved

In Piping fabrication & Erection at I.O.C.L Refinery Projects, Paradeep under ESSAR projects Paradeep.



Contact this candidate