WAQAR ALI KHAN
Position: Electrical and I&C Engineer Professional Experience: 12 Years
Educational Qualifications: Bachelor of Technology (H) Electrical Location: Al Wajh, Tabuk, Saudi Arabia
Contact: Cell phone +966********* Email: *********@*****.***
Career Summary
Presenting 12 Years diversified experience, within various legendary EPC and Engineering Consultancy industries environments, including Onshore and offshore. Having experience of producing all type of detail engineering design deliverables especially Low voltage, Medium voltage and Low current’s installation design in Power plants, ADDC Substations, See water Desalination plants (Reverse Osmosis and MSF), High rise commercial & residential towers, Airport, Governmental and Military facilities.
Employment History (12 Years of Professional Experience)
Electrical and I&C Engineer
Dar Engineering/ TRACTEBEL Engie (Engineering Consultancy) Jeddah, Saudi Arabi. Client: Saline Water Conversion Corporation SWCC
Oct 2019 to Till Date
MEP Engineer
HILL International (Engineering Consultancy Company) Karachi, Pakistan
Emaar Dubai United Arab Emirates.
APR 2018 to OCT 2019
Electrical Engineer
Proger Engineering & Management (Engineering Consultancy), Riyadh Saudi Arabia. Client: Ministry of Interior Saudi Arabia
JAN 2015 to MAR 2018
Electrical Engineer
Pal Group of Companies L.L.C (EPC Main Contractor & Consultancy), Abu Dhabi, UAE. Client: Ministry of Interior UAE.
NOV 2012 to DEC 2014
E and I Engineer
Al Husam General Contracting L.L.C (EPC Contracting), Abu Dhabi, UAE.
Clients: TAPCO, SEWA, TABREED
OCT 2005 to AUG 2008
Educational Qualifications
Bachelor of Technology (Honors) Major: Electrical Technology
Preston University of Technology & Management sciences Karachi, Pakistan
2012
Diploma of Associate Engineering Major: Electrical Technology
Govt. Poly Technical Institute Nowshera, K.P.K, Pakistan
2005
Key Skills attributes
Medium Voltage systems Design and installation
Testing and Commissioning of MV system, Switch gears, Transformers, Motors, VFD’s, Cables etc.
load flow studies; voltage drop calculations, short circuit and protective device coordination analyses; arc flash calculations by utilizing ETAP
Design and installation of Lightning Protection System for Plants, Highrise Buildings.
Installation and testing commissioning of ELV systems BMS, HVAC, CCTV, Access Control, PAVA, Structure Cabling, Fibreoptic cable, IP Telephone, Master Clock
Conducting site works inspection, Material Inspection.
Witness and Quality assurance of Factory Acceptance tests for Switchgears IEC61439, IEC6227, Cables IEC60502, BS6004, Motors IEC60034, etc.
Review of instruments and control system hook up drawings, P& ID Drawings, complete loop Dwgs.
Site works Quality management, issuing of SORs, NCR, QA QC walk downs and creating punch lists.
MEP Systems Installation (HVAC, Fire Fighting, Drainage, Plumbing) etc.
Low Voltage systems Design and Installation.
Review of Design and shop drawing, Technical material submittal, ITP’s and Method Statements.
Testing and Commissioning of LV system, Switch gears, Transformers, MCC’s, VFDs, Soft Starters Motors, Cables etc.
Preventive maintenance of Instruments and control system.
Troubleshooting of Instruments and control system.
Installation and testing of Fire Alarm and Firefighting systems. FM200, NOVAC.
Communication bus systems PROFIBUS, Modbus and BACnet installation.
Installation and Testing & Commissioning of Instruments control and DCS System for Plants.
Installation and Testing & Calibration of RTDs, Pressure transmitters Level Transmitter Magnet ultrasonic and others Flow Transmitters ACV, AOV,
MOVs etc.
Cold loop and Hot Loop testing of Instruments.
Success Stories / Projects Executed Record
West coast satellite plants Sea Water Reverse Osmosis Plants 25000 m3/day, Al Wajh, Duba and Umluj Tabuk at SWCC existing MSF Desalination plant.
Emaar crescent bay Development 7 number of 25 floor residential and commercial towers including infrastructure
Development and construction of KAP3 and KAP4 Projects (General Headquarters, Passport Offices, Police stations, Civil Defense, Accommodations) of Ministry of Interior.
Emiratis Housing Project west Yas Island Abu Dhabi, UAE; Client Royal Architect and Project Management: The project consists of 500 villas and Infrastructure works including 12 substations, Heat Exchanger, Street lighting.
Police station, Barracks & Civil Defence Buildings at Yas Island, Abu Dhabi. Client: Ministry of Interior Abu Dhabi, Design & Build Project: Project Consist of G+4 Buildings, infra structure works, Heat exchanger, Package substation.
Al Shams Skyscraper 83 Floors Towers Reem Island, Sorouh Real Estate. Electrical installation of East tower
E11 and E8 Abu Dhabi Distribution Company Substation Abu Dhabi, UAE
Tabreed District cooling plant, Yas Island Abu Dhabi, UAE, The Village Hotels and Resorts, Abu Dhabi, UAE.
SIDEM Desalination Plant D10 & D12 Layyah Power House Sharja, UAE, Client SEWA: Project consists of two Desalination plants D10 and D12, 8 Mega Gallon per day.
Al Taweelah Power & Desalination Complex AUH, Al Taweelah New B extension, Client; TAPCO/ADWEA Taweelah Abu Dhabi UAE: The project consists of the installation of 1000 MW set of combined cycle Gas and steam turbines and 160 MIGD Desalination Plants of FISIAITALIMPANTI.
Employment Record
Name of Institution: Dar Engineering, Jeddah, Saudi Arabia, Client: SWCC Saudi Arabia
Job position : Electrical and Instruments Engineer Duration: 16 Oct 2019 to till Date
Dar Engineering consultancy and Tractebel Engie Belgium team up for Sea Water Reverse osmosis projects on west bank around the kingdom client Saline Water Conversion Corporation, currently having 8 main projects of SWRO of up 52 thousand cubic meter of fresh water per hour. Project Consists state of the art Electrical power and control systems, two numbers of 7 MVA, two 3 MVA transformers, Siemen’s NXS Plus C 13.8 and 6.6 KV switchgears, MV 6.6 KV and LV VFD’s, MV 6.6 KV high pressure pumps, LV pumps up to 300KW, Soft Starters etc. Installation and testing of medium voltage and high voltage switchgears (GIS) and transformers, in close coordination with Civil department for designing the foundations for Switchgears and transformers.
Design, Installation and testing and commissioning of plants and substations auxiliary AC and DC low voltage system. BENNING UPS installation and testing, Battery Bank installation and testing.
Installation of Ring Main Units and Remote Terminal Units at SEC Electrical substation rooms.
Installation of high voltage and medium voltage Transformers and their protection systems over current, restricted earth fault, mechanical and differential protection system.
Preventive maintenance of Plant instruments and control system, Troubleshooting of Plant instruments and control system DCS and PCS.
Installation & Testing commissioning of MCC Motor control center, Variable Frequency drives (LV and MV VFD’s), Soft starters, star delta and direct online starters.
Installation and testing commissioning of Siemen’s Process Control System (DCS) system, Instrument
and control systems, including Quality Analyzers of Water (PH, SDI, Turbidity, Chlorine, Oil and other analyzers
Review of instruments and control system hook up drawings, P& ID Drawings, complete loop
drawings, HART and manual calibration of instruments e.g. (RTDs, Pressure, Level, Flow, ACV, AOV,
MOV). Testing and commissioning of close loop control systems and DCS system.
Hot loop and cold loop testing of instruments, Calibration of instruments in field and laboratory.
HAZOP Hazard and Operability Analysis of the plant, identifying potential risk and addressing them with engineering approach.
Review and authenticate the plant (Erection completion, Functional completion, Performance compliance and commissioning compliance certificates during final handover of the plants.
Develop typical Electrical calculations such as: load flow studies; voltage drop calculations; lighting calculations; short circuit and protective device coordination analyses; arc flash calculations by utilizing ETAP.
Supervision and installation of Infrastructure works of e.g. (Street lights, lighting control cabinets, Cable installations for Buildings and Substation, Feeder pillars, Chill water control system, Etisalat Fiber Optic cable installation, coordination of Utilities at site.
Reviewing project design and shop drawings, method statements, inspection test plans. material submittals for adequacy and approval, Supervision and inspections of installation works done by contractor at site.
Installation of low current systems (BMS, Access Control, PA VA, Fire Alarm, CCTV, lightning protection, Structural Cabling, Audio and video intercoms, MATV, Master clock etc. At various specialized facilities.
Well versed in implementing local and international standards, such as (ADDC, DEWA, SABC) BS 7671, IEEE 17th edition, SEC SDMS, NEC, NFPA, IEC etc.
Employment Record
Name of Institution: HILL International Karachi, Pakistan Emaar Dubai, United Arab Emirates
Job position : MEP Engineer Duration: Apr 2018 to Oct 2019
The HILL International is renowned Engineering consultancy, USA based company, Providing Engineering Design and Supervision across USA, Europe, Middle East, Africa and Asia.
The Client, Emaar crescent bay Development 7 number of 25 floor residential and commercial towers including infrastructure; Electrical Installations of the project consists two 2.5 MVA, 1500kva Transformers and its protection system at dedicated substation for development. Bus Duct Power Distribution system for all towers. Emergency Generators etc. Lighting Control System, Structure cabling, CATV system, Fire Alarm system, BMS systems, Lightning Protection system, Public address system, Access control etc. Managing daily site work inspection for MEP services. Raising Site observations and nonconformance of site works being executed in nonconformance of project specifications. Witness factory acceptance tests for power cables, Switchgears, Transformers, Pipes and fittings. Etc.
Employment Record
Name of Institution: Proger Engineering & Management S.P.A Ministry of Interior, Saudi Arabia
Job position : Electrical Engineer Duration: Jan 2015 – Mar 2018
As an Electrical Engineers my duties were to develop Electrical deliverables for all phases of a project including: conceptual design, preliminary design, and detailed design, part of site team provides supervision to site works on daily bases, managed a team of site electrical inspectors. Inspection and approvals for delivered materials at site according to project specifications etc. Perform inspections of Electrical installations and Electrical equipment for conformance with engineering documents, installation of ELV system (BMS, Access Control, CCTV Structure cabling. SEC package substation installation and testing. Reviewing project design and shop drawings, method statements, material submittals for adequacy and approval, Supervision and inspections of installation works done by contractor at site.
Employment Records
Name of Institution: PAL Group of Companies UAE Client: Ministry of Interior United Arab Emirates
Job position : Electrical Engineer Duration : Nov 2012 – Dec 2014
The Pal Group of Companies is a subsidiary of The Prestigious Royal Group of Abu Dhabi, providing Engineering, procurement and construction solutions to various types of governmental and commercial projects owned by the Royal Group, ranging from Royal mansions, Police GHQ’s, District cooling plants, Water Treatment Plant at Yas Island Abu Dhabi, (Buildings and infrastructure of Emirati 500 villas and Police station, Barracks and civil defense.
Installation and Testing commissioning of MV, LV and ELV (BMS, CCTV, Lighting control, Access control, PAVA) Systems. Study tender document along with tender drawings, Specification and Bills of Quantities and specify discrepancies, variations, if any, to the planning team, client / consultant Installation and testing of package substation. Preparation and taking approval of all submittals like Drawings, materials and Technical submittal) from consultant and local authorities. Manage all specialized sub-contractors/suppliers, follow up their activities, material deliveries, manpower etc.
Inspects site for electrical work/installations and ensures that the carried-out works are in compliance with contract drawings and documents as well as according to the contract Specifications. Coordinate with the consultant and carry out the site inspections.
Employment Record
Name of Institution: Al Husam General Contracting L.L.C Abu Dhabi, UAE
Client : TAPCO and SEWA UAE Job position: Site Engineer Electrical
Year : Oct 2005 – Aug 2008
The Al Husam Group of companies is renowned contracting company providing engineering, procurement and construction solution to various types of projects across United Arab Emirates. Including Power Plants, MED and MSF Desalination Plants, District Cooling Plants, Luxury Hotels and Resorts, Residential villas etc.
Being Site Electrical Engineer Responsibilities includes Preparation of preliminary design drawings detailed shop drawings and taking consultants and local authorities’ approval. Managing site installation team consisting Supervisors Forman and Electrician to successfully execute site works according to approved drawings. Managing required materials for site installations, coordination with procurement team for procurement of materials, materials approval from consultant. MEP coordination, utilizing Auto Disk Revit and at site. Quality assurance and Quality control of site works done and taking on time approvals of sites works done form consultant. Installation of Low current systems (Access Control, PA VA, Fire Alarm, CCTV, Structural Cabling, Audio and video intercoms, MATV, Master clock). installation and testing commissioning of MV switchgear, MV cables, MV Seawater pumps for desalination plant, LV Distribution transformers, LV switchgear, LV motors, Tests inducted, (HIPOT test, IR test, Continuity Test, Phase sequence test, contact resistance test, winding resistance tests, current excitation test, Turns Ration test, Ratio test, Polarity test, Burden test, Primary current injection test, magnetization curve test etc. Preventive maintenance of Plant instruments and control system, Troubleshooting of Plant instruments and control system DCS and PCS.
Seminars / Trainings / CO-CURRICULAR ACTIVITIES
SEIMENS DEISGO insight Building Management System Field installation and Automation level, Management level software training at SIEMENS Dubai, UAE
OSHA 30 hours in construction Training, by Proger Engineering and Management. S.p.a Riyadh, Saudi Arabia
Occupational safety and Health Advanced Diploma, From International Association of Safety Professionals (IASP) USA.
Computer Skills/ Software Skills
ETAP 16 (load flow analysis, short circuit analysis, transient stability analysis, harmonics analysis, creating and
assessing one-line diagrams of LV MV and HV systems) etc.
Autodesk REVIT BIM modelling, AutoCAD2012, Revit MEP BIM modelling
Relux, Deluxe, LUX calculations software, ETS (Engineering tools solution) for Home Automations.
Professional license
Registered member of Saudi Council of Engineers, Saudi Arabia, Registration number #196805
References
Mr. Sajeel Durrani, Senior Construction Manager at Tractable Engie Jeddah, Saudi Arabia
Email address: ******.*******@*********.*****.***, Phone: +966*********
Mr. Saud Albalawi, Operation Manager at SWCC (Saline Water Conversation Corporation) Al Wajh Plant, Tabuk, Saudi Arabia, Email: *********@****.***.**, Phone: +966*********
Mr. Afzal Hussain, HR Coordinator at Ms. Hill International Karachi, Pakistan
Email Address: ************@********.*** Phone: +923*********
Mr. Ayaz Ahmed Khan, Senior Electrical Engineer at Ms. Shell Pakistan, Karachi, Pakistan
Email Address: *************@*******.*** Phone: +923********