RAGHAV JHA
***,***** ***, ***** ******,bhestan, Surat,Gujarat-395023
+916********* admf3e@r.postjobfree.com
CAREER OBJECTIVE
To take a challenging role and make significant contributions in the multiple disciplines of Petroleum Engineering including well operation and production, completions, formation evaluation and reservoir engineering
EXPERIENCE
Kingstone oil feild service pvt ltd
Trainee petroleum engineer
The workover begins by killing the well then removing the wellhead and possibly the flow line, then installing a B.O.P commonly known as a blowout preventer, then lifting the tubing hanger from the casing head, thus beginning to pull the completion out of the well.i worked as roustabout,floorman and trainee asst.drilller.I have learn to operate various equipment such as mud
pump,accumulator,brake etc.I have got good experience on workover rig.
Naithani oil and gas service pvt ltd
Feild engineer
Experienced with a demonstrated history of working the oil and gs energy sector.skilled in slicklune job,working In echometer,SRP optimization,GLV optimization,pen paper graph study,GLV designing operated slickline unit and do various well intervention jobs like scraping, hole probe, bottom tagging, fish recovery,PT survey. Data acquisition and interpretation with FEKETE
Liquid level sirvey
Dyna card analysis
Valve leakage test of SRP
CBE yest on SRP WELL
Corelated raw data gather with TWM software wity stimulation software with QROD. EDUCATION
G.S.H.E.B
10th
75%
2011
G.S.H.E.B
12
60%
2013
Uttarakhand technical university
B.tech
74%
2019
30 days
TECHNICAL SKILLS
Fekete software
Emg tools software
TWM (Total well management)
TAM (Total assest management )
Workover rig operations
Operation operated woth slickline unit
PROJECTS
Artificial lifts
Artificial lift is a process used on oil wells to increase pressure within the reservoir and encourage oil to the surface. When the natural drive energy of the reservoir is not strong enough to push the oil to the surface, artificial lift is employed to recover more production.
Artifical lifts are Sucker-rod (beam) pumping,Electrical submersible pumping (ESP)
Gas lift and intermittent gas lift,Reciprocating and jet hydraulic pumping systems,Plunger lift,Progressive cavity pumps
(PCP).Mainly my project is on Sucker rod pump.
ACHIEVEMENTS & AWARDS
Represented college in Seminar held in IIP Dehradun on topic CBM Represented College in ONGC Dehradun in Drilling Equipment Represented Gujarat state in nationals for skating Runner up of College Cricket Tournament
Excellent work in various science and maths olympaid Bagged 1st Position in Inter college Kabaddi Tournament INDUSTRIAL EXPOSURE
Naraya energy (4 weeks) The basic aim of the project was the study of the methods which used in refinery industries to covert CRUDE Oil in gasoline,Kerosene, Naphtha etc.There are various chemical operation like cracking,catalytic reforming,hydrocracker,alkylation etc. INTERESTS
Reservior Engineering
Well logging
Drilling engineering
Slickline jobs
PERSONAL STRENGTHS
Commitment and Loyalty
Self-confidence
Creative
Good in communication
Polite and kind
Effectiveness to laziness
RAGHAV JHA
PERSONAL PROFILE
Date of Birth : 04/30/1996
Marital Status : Single
Nationality : Indian
Known Languages : Hindi,English,bengali,maithali,gujarati Hobby : Travelling Book reading