Michael E. Alderman

**** **** ****** **** *********, Fl. 34208

941-***-****

SUMMARY

My Professional experience includes the Utility and Site Development Industry. My primary responsibilities have included budget preparation, contract estimating, negotiations, site utility design and construction inspections.

EXPERIENCE

2018-2019 Jones Edmunds Engineering

Construction Administrator

Managed Construction for WTP/WWTP and utility construction, constructability reviews/ project designs; prepared progress meetings; reviewed final record drawings.

2015-2018 City of Bradenton

Construction Administrator/Resident Project Representative/ Construction Manager

Managed CIP and TIP projects – WTP/WWTP Construction

Wastewater Certificate, Complete reconstruction and Upgrade replacement of system for Centrifuge operation

Water treatment plant expansion, new ASR well and all associate piping and underground construction

Wastewater treatment plant expansion and complete reconstruction of headworks area and upgrade to aeration channels

Managed all paving, Roadway and new highway construction

2013-2015 City of Palmetto

Supervisor of Water Distribution and Cross Connect Department

Supervision of water distribution, distribution construction, engineering, utility design, surveying, utility maintenance, budget preparation, DEP annual reports, project planning, providing education for water quality to local businesses, storm water management and NPDES requirements, water quality reports, flushing calculations and reports, sanitary sewer spill reports, dewatering design and inspections of all city utilities and drainage facilities. Managed training sessions for employee upgrades.

2009-2013 Astra Group and Astra Grading & Pipe, Inc.

Project Coordinator and General Superintendent

Responsible for all project coordination for multiple large underground pipeline projects, master pump stations, Treatment plant renovations, crews and subcontractor coordination, material coordination, project records, all residential and industrial site development.

Astra Grading & Pipe contact- Tad Swartz 770-***-****

2003-2009 Steele Associates, Inc.

General Manger/Operations Manager

Coordinated all Field crews

Responsible for managing utility construction division and Residential/ Industrial Site Development

Project Estimator, Problem Solver

Produced all Record drawings

Set all progress meetings

1989-2003 Arcadis G&M Engineering Marietta, Ga.

Resident Project Representative

Responsible for constructive PM and inspections, plan reviews, assisted with project schedules, contractor coordination, assisted with progress meetings, reviewed submittals and final contract drawings, problem solver.

LICENSES/CERTIFICATES

Licensed Utility Contractor – Fl, GA, SC, NC

Licensed Utility Manager-Fl, GA, SC, NC

NPDES level JA certified

Member of AWWA

Georgia Utility Contractors Association

Erosion Control Certification level 1A

NUCA Confined Space certification

OSHA Excavation & Competent Person Certificate

PARTIAL PROJECT LIST

Macon Water Authority – Project Coordinator – General Superintendent

Project Scope: Master Wastewater Pump station 15,000 LF-24” DIP force main, 4700 LF -24” fusible PVC Directional Drill

Georgia Dome Site Development and Underground Utilities- Operations and Project Manager Project Scope: Approximately 5,000 LF of 108” diameter reinforced concrete pipe, all sanitary sewer, water, storm drain.

International Concourse “E” Hartsfield International Airport Site Development and underground Utilities-Operation Manager; Designed and installed large de-watering system; coordinated 1,000,000 cy. Excavation for Site Development

Project Scope: Construction of 12 acre underground maintenance facility

Georgia Tech 84” reinforced concrete pipe tunnel replacement-Operations Manager, Project Scope: Replacement of Orme street Tunnel with 84” RCP F_NCASED

City of Manchester Georgia Reservoir and Dam-Operations Manager Project Scope: 180 acre reservoir, dam and pump station. Approximately 1,000,000 cy dam construction.

City of Atlanta Water Transmission Main- Operations Manager Project Scope: 45,000 LF of 48” and 54” DIP water main

City of Atlanta, Harris street Sanitary Sewer replacement- Operations Manger Project Scope: 3,800 LF of 48” RCP Gravity Sewer

Gwinnett County Chattahoochee Interceptor- Operations Manager Project Scope: 26,000 LF of 36” and 42” DIP Gravity Sewer

Muscogee County GA I-185 Sanitary Sewer Bypass-Operations Manager Project Scope: 6,500 LF of 24” RCP Gravity Sewer

Additional Projects available upon request