Post Job Free

Resume

Sign in

Civil Engineer Construction

Location:
Tokat, Turkey
Posted:
May 11, 2021

Contact this candidate

Resume:

Hakan ŞIKTAR

Civil Engineer

*

Name and surname HAKAN ŞIKTAR

Summary

HAKAN ŞIKTAR has 20 years of work experience, with 4 years of management experience, including a high-level position. Mr.Hakan ŞIKTAR is well expertise in construction industry near to 20 years specializing especially in management and control services for wide variety of projects. High experienced by working with international companies, suppliers - consultancy groups where have gained in different countries as like: TURKEY, LIBYA, KSA,MOROCCO, and IRAQ which has

developed under concept of international best practices with procedures such as: FIDIC, Purchasing – subcontractors - JV agreements.He has been reserved his professional experiences staying by organize and proficient with details via good interpersonal and team skills and being able to work and think independently under pressure for critical deadlines. Also, actual sites monitoring–control activities, quality – safety contractual assurances, high level meetings, continuous reporting in details via needful coordination to success. Advanced knowledge of US & British, European, Libyan, Morocco, and KSA codes – norms- standards.

Education & Profession

1989 – 1994 Civil Engineer_ Istanbul Technical University,Civil Engineering Faculty Technical Skills & Software

Microsoft Project Management,Microsoft Office Applications,Autocad for Drawing Language

Turkish Native Language

English Advanced 3 years of English courses training at Turkish British Cultural Association in Ankara.

French Advanced 3 years of French courses training at French Culture Center in Ankara. Arabic Advanced Speaking and reading

Personel Information

Nationality: Turkish

Birth Date and Place 29.03.1972 / Reşadiye-Tokat

Military Service Done_Ankara 247. Short Term & 1996 Marital Status Married (have 3 children)

Contact :+905**-***-**-** (Mobile)

+905**-***-**-** (Mobile)

+903**-***-**-** (Home)

Email Adress admbbs@r.postjobfree.com

Hakan ŞIKTAR

Civil Engineer

2

Relevant Work Experiences

03/2018- Process Control Engineer

INECO - UBM INTERNATIONAL UNITED CONSULTANCY SERVICES INC. Artvin-TURKEY

Republic of Turkey General Directorate of State Railways Administration Ankara-İstanbul High Speed Train Project_T26 Tunnel Improvement Project.

Supervision and consultancy work for construction of roads and tunnels in Yusufeli Artvin. In consequence of Yusufeli Dam Construction, current Yusufeli area will be under the water after after the completion of Yusufeli Dam Lake .So that it will be deplaced in its new location. In order to make the connection for its new area construction of ; 55600 m. tunnel (40 pieces), 4 pieces technological bridges, 22 pieces culvert are to be done.

06/2016-

12/2017

Site Manager

MC MEHMET ÖZCAN YÜK. MÜH. SAN. TİC. LTD. ŞTİ._Mersin-TURKEY

Anamur/Mersin 150-bed State Hospıtal Construction Project.

Tarsus/Mersin Municipality Berdan River Environmental Regulation and Social Facilities Construction Work 08/2016-

04/2017

Site Manager

TAŞKINLAR İNŞAAT TAAHHÜT VE TİCARET A.Ş._Kocaeli-TURKEY Worked at 138 houses built in Kocaeli Derince. Houses constructed by the Prime Ministry Housing Development Administration (TOKİ) in the Derince district of Kocaeli. Within the scope of the tender held on February 23, 2016; "138 houses, 1 mosque, 1 commercial center construction and infrastructure and environmental management work". Houses to be built in Çınarlı Quarter constructed on 2 + 1 floor, and 3 + 1 floor, a wide landscape, play and social spaces were designed.

02/2014-

08/2015

Senior Infrastructure Engineer_NKY Arhitects and Engineerings Consultancy Company Riyadh_ Kingdom of Saudi Arabia

CLIENT_ Ministry of Interior_ King Abdullah Bin Abdulaziz’s Project 2 (KAP2) The King Abdullah Bin Abdulaziz’s Project (KAP2) was launched in 2013 to develop security facilities across Saudi Arabia in order to upgrade the military standards of the Kingdom. This ‘program’ is spread over 44 sites among 5 zones in the country with a total construction area of over 3,5 million square-meters. Although fundamentally a ‘public security’ project; KAP2 consists of a variety of building types including medical centers, training facilities, shooting ranges, clinics & forensic laboratories, recreational facilities, auditoriums and congregational facilities, mosques, shops, sports buildings and other institutional facilities.

●Design,evaluation and execution of infrastructure projects issues.

●Supervision of the contractors and subcontractors during construction. 11/2012–

05/2013

Infrastructure Works Manager

TEFIROM Construction Energy Industry &Trade Co. Inc.SULEYMANIYE IRON-STEEL PLANT _Iraq Interested infrastructure, environmental works, road connections, and landscape works under FIDIC conditions.

• Suleymaniye Iron and Steel Plant Project is an investment of MASS Holding, which is the greatest investment and industry group in Northern Iraq, has an annual 1 million capacity and it will be the largest iron and steel processing and manufacturing establishment of not only Northern Iraq but the entire region as well.• The area allocated for the Project by the Investor is 750.000 m2.

• It will have an annual capacity of 650.000 tons and additional capacity of 350.000 tons of profile manufacture capacity.

Hakan ŞIKTAR

Civil Engineer

3

03/2011–

03/2012

Deputy Project Manager_ATK Company, 400-bed Hospıtal Project Basra-Iraq Scope of work consist construction of hospital.Preparation of proposals in accordance with the principles of Engineering Department and tender specifications; quality control of tender packages; updating work experience, ongoing projects, updating man-month and cost analysis documents; following the new tenders and informing Engineering Department; collecting all the information related to projects subject to the tender, searching for materials, construction method and work schedule, collecting price offers of subcontractors, updating man-power, machine, equipment and subcontractor information; preparation of report related to site management cost, general cost, mobilization cost and tax calculation .

12/2009–

01/2011

Site Manager_Ersaa Company for construction and real estate investment., Tripoli-Libya Worked at construction site of “Tripoli 800 housing units” Project: Scope of work consist in addition of housing units; interested infrastructure, environmental works, road connections, retaining walls and landscape works. Determining milestones of projects between client and contractor; reporting any anomalies or potential schedule delays, preparation of Bar Chart showing planned and actual progress based upon physical achievement for the project to highlight project finish date and overall situation; preparation of manpower reports. 03/2008–

09/2008

Site Engineer_Nesma & Eser_Onur JV. Jeddah-Saudia Arabia Worked at construction site of King Abdullah University Project in SaudiaArabia :Scope of work consist construction of infrastructure of King Abdullah University including sanitary sewer, storm, potable water lines and bridge construction. Excavation and filling of potable, sanitary sewer, storm pipes lines after that laying pipes and backfilling.At every progress submission the work to the QC engineers according to the specifications.

07/2005–

01/2008

Site Structure Engineer

Polat Yol Yapı A.Ş., (Tanger - Ras Rmell Railroad Construction) Tanger-Morocco This work is the construction of railway infrastructure with a total length of 17 km. Within the scope of the project, 9.000.000 m3 excavation and backfilling was completed in conjunction with 1 railway bridge, 5 highway bridges and 18 culverts. 09/1997–

07/2005

Control Engineer_T. Vakıflar Bank Head Office, Ankara-Turkey Worked as a civil engineer at several branch offices constructions in various cities in Turkey.: Scope of work consist construction of bank branch offices ;school buildings according to the agreement between the Bank and Ministry of Education; hospital buildings according to the agreement between the bank and Mınıstry of Health;.Engaged in the preparation of document of hand over the site after tender, the contract plans,monitoring the building at every stage, checking steel bars and quality of concrete before casting the concrete according to the specifications,project study report, cost estimates,monitoring the building while the construction progress, including engineering calculations and application of computer work station for the design of vertical and horizontal alignment, finally preparation of the claim of the subcontractor at every stage. 08/1994–

07/1995

Site Engineer_Garanti Koza Company, Istanbul -Turkey Worked as a civil engineer at housing units project in Turkey. Scope of work consist finishing work for the buildings before submission to the owner of the houses.



Contact this candidate