Engineer, Project Management, Large $20MM Budget Management, Organized

Location:
United States
Posted:
June 21, 2021

Contact this candidate

Resume:

Megan Scudder, PE

**** * **** *******, ** ***** 210-***-**** adm9rv@r.postjobfree.com

Experience

Plains All American Houston, TX

Sr. Integrity Engineer-Corrosion December/2019-Current

Developed internal corrosion database using software from American Innovations and Microsoft PowerBI o Standardized data collection process for three (3) chemical vendors and seven (7) internal divisions o Made processes within the company more efficient using corrosion records, operational history and financial data for a 30% cost reduction on the overall internal corrosion chemical budget o Automated the data transfer process to allow for real time corrosion and financial data to engineers and operations

Managed internal corrosion chemical program for ~9,600 miles of crude pipelines o Reviewed monthly water testing and coupon data to determine adjustments to chemical rates or batch treatments

o Worked with three (3) chemical vendors to write recommendations for program changes to high volume pipelines to reduce internal corrosion threat while remaining within the budget

Reviewed all water testing, coupon, crude testing, operational history and ILI data to determine if internal corrosion is active or passive, if internal corrosion was active, determined action plan to arrest corrosion Pipeline Integrity Supervisor April/2019-December/2019

Supervised three (3) engineers that managed the Pipeline Integrity for the North Region, ~3,500 miles of DOT pipelines

o Trained two (2) engineers that came into the company with no previous integrity experience o Set goals and expectations for the team and held them accountable if necessary o Approved all technical work prior to distributing to upper management or operations

Approved inspection method and ILI tool type for all pipelines in the North Region

Assisted in rewriting several sections of the Company’s Integrity Management Plan (IMP): o Conducting Assessments and Processing Results

o Preventive and Mitigative Measures

o Procedure for Continual Evaluation and Assessment of Pipeline Integrity Pipeline Integrity Engineer June/2017-April/2019

Managed several hundred miles of DOT jurisdictional pipeline in California to ensure compliance with 49 CFR 195 and company’s Integrity Management Plan

Analyzed the following data for each regulated pipeline and conduct weekly meetings to identify preventive and mitigative measures and determine reassessment interval and method: o External Corrosion Data: CIS, Annual Survey, Atmospheric Surveys o Internal Corrosion Data: Acid Gases, Water Chemistry, Chemical Program o Third Party Data: Depth of Cover, Dent Orientation, ILI History o Manufacturing Defects: Seam Type, Pressure Cycling, Hydrotest Records

Calculated and managed (if required):

o MOP validations- based on hydrostatic test pressure, pipe design material or flange rating o Temporary pressure reductions required when repair deadlines are not met o Hydrostatic test pressure for pipelines

o Pressure cycle analysis to determine cycling aggressiveness o Evaluation pressure for ILI assessments

Reviewed ILI data to determine repair location and method based on 49 CFR 195

Created presentations for PHMSA and California State Fire Marshall regarding: o Integrity due diligence on new construction pipelines, Plains All American standard for material selections and Selective Seam Weld Corrosion

Assisted hydraulics engineer on the design and execution of a nitrogen purge for a 72 mile pipeline with 5,000’ elevation difference

Oversaw company’s Waterway Program, API RP 1130

CenterPoint Energy Houston, TX Jackson, MS

Distribution Integrity and Reliability Engineer March/2015-June/2017

Developed decision models using excel, ESRI GIS, SAP and/or leak and asset data o Leak Repair vs. Asset Replace Model based on risk and financials, used for effective leak management, team lead and developer

o Calculated areas of high leak densities using spatial analytics in ESRI GIS, analyzed data to make recommendations for company capital replacement budget, team lead and developer o Leak Prediction Model using ESRI GIS spatial analytics and R to determine high risk replacement projects that maximum leak reduction rates, team member

Created and presented: reports and data statistics for internal and external communications for: o Overall company and state asset risk for executive management o Company and DIMP overview for federal and state regulators for audits o DIMP training for company construction crews

o Various Lunch and Learns: Pipeline Corrosion, Plastic Pipe Failure Modes, ESRI Spatial Analytics

Developed long term replacement plans for assets based on risk data, industry knowledge and 49 CFR 192 advisories

Analyzed data from vendor risk program to set compliance leak survey schedule based on asset risk, wrote justifications for changes in frequencies

Collected ground temperature data and modeled the life span of vintage and modern plastic pipe used in the natural gas industry based on current operating conditions and failure curves

Preformed root cause analysis and wrote reports annually for high frequency and/or high consequence failures experienced in the field

Natural Gas Engineer January/2013-March/2015

Managed the design and construction of a $12MM annual budget for natural gas local distribution system additions and improvement

o Identified ideal pipe replacements using relative risk software and input from local operations o Analyzed gas models and make recommendations to upgrade the system for customer additions utilizing SynerGEE software

o Designed intermediate and high pressure pipeline installations, replacement and integrity tests in accordance with 49 CFR 192 requirements

o Designed natural gas regulation stations by ensuring adequate measurement, flow and regulation control odorization and over pressure protection capacities in accordance with 49 CFR 192 o Researched land rights through county tax maps and plot easements, write and stake proposed easements

o Tracked and forecasted budget throughout the year to remain on target with goals o Created cost estimates and evaluated feasibility for adding potential customers

Assisted in determining high profile areas based on population density, type of business and main feeds into the system

Wrote annual budget based on input from operations, TxDOT and marketing to generate annual project list ranked by priority

Trained two interns and one full time engineer on CenterPoint Energy design standards and best practices Education

Texas A&M University College Station, TX December 2012

Bachelor of Science, Civil Engineering, Cum Laude Training

NACE: Basics of Corrosion

NACE: Basic Internal Corrosion

NACE: Advanced Internal Corrosion

NACE: CP Tester Level 1

Texas Board of Professional Engineers #12342

Skills

Tableau

Power BI

ESRI Arc Map

MS Office Software

Asset Risk Software: Optimain, ESRI, RIPL