I have work experience in Residential, Commercial, Civil, Heavy Civil, Mining and Industrial Construction; I have been Project manager, Project Superintendent, Field Superintendent, Safety and QAQC officer for the last 15 years. Projects include Border Wall Construction(Fisher Industries), mining civil, structural, mechanical(Nevada Copper in Yerington, NV; Newmont Mining in Cripple Creek, CO) commercial civil/structural (Furnace Creek Resort), Industrial civil/structural/mechanical(CO2 plants in Cortez, CO; Tri-State Generation in Craig CO; Western Refinery in Gallup, NM; Natural Soda in Rifle, CO; Southern Star Pipeline in Blackwell OK), marine civil (GIWW in New Orleans, Freeport Harbor, Bahamas), heavy civil highway bridge (Cooper river bridge in Charleston, SC and Interchanges; Escambia Bay Bridges in Pensacola, FL), cement plants (Holcium Cement Plant modernizations in Florence, CO and Holly Hill, SC), working with State, Federal, Private, Army Corps of Engineers inspectors, working with MSHA and OSHA inspectors and inspections. I am an advocate of Safety First and have participated in many Safety Programs and believe in better production gained from working safely in a safe environment, I am the Lead Safetyman on most of the projects. I have been the QAQC for projects, overseeing all work is to the specifications, scheduling inspections required; keeping the paperwork and developing and maintaining the Job Turn Over paper work. I have completed OSHA, MSHA, CPR/ First Aid/AED training, HAZWOPPER trained, National Commission for the Certification of Crane Operators trained, I am a Veriforce and Operator Qualification Compliance trainer, I work with Computer programs in Word, Excel, BIM 360, Drop-box and others. I have written Job Work Schedules, Job Hazard Analysis, Job Safety Analysis reports and others for many projects. I have participated in the development of job completion/punch list schedules, Quality Control Inspections, and have completed them. I have been involved in the logistics for material handling and procurement, mobilization and demobilization of projects. I have assembled Metal buildings and structures (Nucor, Siscorp-Global, and Versa-Tube). Installed conveyor systems, compressors, tanks, and vessels, transformers, switch gear, numerous types of automated equipment, boilers, crushers, weigh feeders, drive motors, sand screws, and turbines. Survey work for layout and excavation for installation of concrete works, rebar, equipment and building foundation anchors, formed and placed concrete with many forming systems, from Symons to Peri, I have produced the submittals for project start up. Placed flat work concrete from sidewalks, curb and gutter to bridge decks, worked on mass concrete curing, grouting, post tensioning and many other aspects of concrete construction. I am certified Equipment operator for Dozer’s, Excavators, Frontend Loaders, Backhoe, Extend Boom Forklifts, Man-Lifts. I have driven sheet pile and pipe pile from a barge, pulled pile and have demolition experience. I have structural steel erection experience, (equipment and pipe support systems, buildings, stair towers, sound walls, etc). I am well rounded in experience and have an excellent track record for safety and quality of work. I am healthy non-smoker and work hard. I live in a town (Dove Creek) in Southwest Colorado; I travel for most of projects.

Employment:

Durus Industrial

Start: July 27, 2020 End: February 1, 2021

55 S. 56th Street

Chandler, AZ 85226

602-***-****

Shawn Wilson

Field Services Superintendent; Border wall construction in Sasabe, Az for Fisher industries

Schmueser & Associates

Start: November 5, 2015 End April 1, 2020

811 22 Road

Grand Junction, Colorado 81505

970-***-****

Jay Thompson; Fred Willadson

Project Manager; Project Superintendent, Superintendent

Nevada Copper: (Mine Hoist and Paste Plant Construction, Administration Building Construction) Tim Dake 775-***-****; Larry Brown 571-***-****; Lara Sims 801-***-****

Natural Soda: (New boiler installation, building foundation and piping) John Moffit 970-***-****; Stan Moore 970-***-****

Southern Star Pipeline: ( New Turbine compressor, foundations piping and building) Terry Holybee 970-***-****; Stan Maynes 505-***-****

Marathon Petroleum/Western Refinery: (Structural steel demolition, new foundations and structural steel erection) Joseph Saucedo 505-***-****

Kinder Morgan CO2 ( New inlet header for Hovenweep Compressor station, addition of cooling systems with new and added piping configurations foundations, structural steel and cyclone separator addition at well cluster facility) Jason Romero 970-***-****; Mark Kibel 480-***-****

GE Johnson/Kitchell, JV, Furnace Creek Resort/Xanterra Parks & Resorts: (New Warehouse/Maintenance Building ground up, New Cafeteria construction ground up, New foundations for restaurant, registration center, 11 casitas, remodeling of existing historic buildings, hotel, restaurant, pool, spa) Arron Willing 719-***-****; John Bell 651-***-****; Brent Boneberger 602-***-****; Steve Wilson 602-***-****;

Tri-State Power: (Craig Power Generation, demolition and epoxy grouting for cooling fans, new coal dump foundations) Jim Williams

Newmont Mining:(New ADR Cyanide Leach structural steel and piping and equipment installation, Mill work fan upgrades, filter press rework, winterization of tanks and piping upgrades). Steve Blockovich

Saulsbury Industries

Start: July 2012 End: November 5, 2015

3315 Bloomfield Hwy, Farmington, NM 87401

505-***-****

John Mickel; Stan Maynes, Fred Willadson

Project Superintendent; Superintendent

Kinder Morgan CO2: (Doe Canyon CO2 compressor station additional compressor building compressor install, remove and replace coolers, foundations, structural steel, equipment install, ground up 2 new booster turbo compressors, foundations, building, coolers, piping, electrical equipment; Yellow Jacket CO2 compressor station upgrades structural steel, piping, coolers for existing compressors, holding tanks etc.; ground up, new 4 booster turbo compressors, foundations, electrical, piping structural steel, building, etc.; Cow Canyon CO2 compressor station and cluster buildings, ground up all new including electrical substation. Foundations, building, equipment, coolers, holding tanks, etc.) John Mickel 505-***-**** Jason Romero 970-***-****

Manson Construction Company

Start: November 2008 End: May 2011

5209 E. Marginal Way South

Seattle, WA 98134

206-***-****

Bob

Structures Superintendent

Gulf Intracoastal Water Way Hurricane Diversion Project; New Orleans, Louisiana

As a Shaw subcontractor Manson constructed the foundation for a Barge gate by installing Concrete piling surrounded by a coffer cell, my duties were oversight of the pouring of a 5000 cubic yard tremmie slab, pump out of coffer cell, leveling tremmie concrete the forming, Subcontractor rebar installation, embed placement, forming placing and curing of concrete footings and walls. I planned the logistics for delivery, loading out of material barges implementing best use of limited access to work area. Followed strict guide lines set forth by the Army Corps of Engineers and Shaw inspectors. Wrote and Implemented JSA’S, held progress and design meetings, safety meetings. Held daily safety meetings with crew did Job Hazard Analysis and wrote reports of all activity. I oversaw maintenance, service and repair of cranes, tugs, concrete pumps and associated equipment. I partnered with QAQC to resolve many issues, developed punch lists with Shaw representatives for timely work progress. I was responsible for the implementation of the IIF safety policy of the Company.

Freeport Harbour Cruise Ship Berth Project; Freeport, Grand Bahamas

Wrote JHA’s and JSA’s for work associated with the demolition and replacement of damaged sea wall cruise ship berths, oversaw the work and worked as company QAQC for the placement of all concrete. Held daily safety meetings and implemented the IIF safety plan. Worked with Freeport Aggregates to design a concrete design mix that would pass the chloride levels set forth in the Specifications, oversaw concrete placement, finishing and curing Worked with materials logistics, shipping and receiving and customs for timely deliveries of needed equipment and materials. I worked with coating subcontractor to resolve coating issues on exposed steel components. I oversaw asphalt paving and landscaping for turn over to owner.

Skanska Civil Southeast

Start: November 1999 End: November 2008

295 Bendix Road, suite 400

Virginia Beach, Virginia 23452

Jay Erwin, Jack Carter

Norfolk Light Rail project; Norfolk, Virginia: Duties included organization of crews to perform civil work including demolition of existing curb and gutter, earthwork, relocation of storm drain systems, installation of culverts.

2005-2008 Supervisor Tidewater Skanska Flatiron Pensacola, Florida

Escambia Bay Bridge Replacement,

(Two 2.6 mile Bridges of Interstate 10) Logistic coordinator for all materials into and out of job site organized and set up lay down yard for prefabrication of Rebar cages for footings, caps, columns and piles. Loaded out barges with all required materials, over saw Marine operations. My crews organized removal of demolition materials from old bridge spans, shipments of salvage to scrap yards and cleanup of waterway. Loaded out and shipped all temporary bridge pieces to Florida State storage facility. Demobilized work trestles and shipped all pipe pile to storage area. My crews Demobilized job with delivery of all liquidated equipment and materials to buyers around the Southeast. Loaded out Barges of materials and participated in Barge Surveys with certified surveyor for the return of barges to Norfolk, Virginia. Worked with QAQC to develop punch lists and resolve them and worked with owner’s representatives to solve all issues for turnover of bridge to the State of Florida. I oversaw the repair work of damaged bridge deck from tractor trailer fire and the repair work of a sinking pile under a pile cap.

2003-2005 Supervisor Palmetto Bridge Constructors Charleston, South Carolina,

Cooper River Bridge; Charleston, South Carolina; 600 million dollar project, (largest cable stay bridge in the Americas at the time). My duties began with the bolt up and installation of girder support brackets, unloading 55 ton Girders from barges transporting girders to piers and flying them up for installation. Managing bolt-up crews to install diaphragms and all bolt up connections to specifications, Managing welding crew welding out the pot bearing to the girders. I Worked with QAQC to develop methods for bolt-up, to meet the contract specifications. I managed crews installing pot bearings for curved steel girders doing layout and pouring in the grout for them, installed elastomeric bearing pads and sole plates. Placing Steel and concrete Girders.

Oversaw Rebar Logistics and Rebar subcontractor (National Erectors), approximately 200 tons per week for installation of bridge deck and diaphragm rebar, oversaw rebar discrepancies and Logistics for installation and delivery. Managed a crew of rod busters to do all non-contract rebar work, managed a crew to pull and post tension cables in pile caps, and managed a crew for demolition of existing bridge decks and forming and pouring of new additional bridge decks. Followed schedules for welding rebar for the manufacture of 9’to 11’by 120’ long rebar cages for drilled shafts. Loaded and hauled these monster rebar cages and placed them in drilled cans, Managed a welding crew for rebar welding, splicing column cans and piles. Worked with QAQC to develop and implement punch lists for completion and turn over. Managed crews of point and patch work, paint and clean up. Worked demobilization, remedy of Quality Control Issues and bridge turn over to the owner.

2001-2003 Mechanical Manager Tidewater Skanska

Holcium Cement Plant Modernization Holly Hill, South Carolina; 300 million dollar project

My duties were to oversee a crews of as many as 31 men and women to construct 3’ to 5’conveyors over five miles, install them and turn them to the owner. I was Mechanical Supervisor of the conveyor systems in the plant. My crew of Mill Wrights worked for the finalization of all conveyors, weigh feeders, cement screws, and other equipment. I was in charge of planning and following strict guidelines for grouting all embeds for both mechanical and structural elements with conventional and epoxy grouts. I planned and had crews build structural steel stair towers, structural steel transfer stations and built many structural steel walk ways. I was in charge of welding crews installing steel grating, steel deck plates and many more items. I oversaw crews of painters to paint all structural steel and touch up over the entire plant. I worked with the owner’s representatives to establish Mechanical and Structural punch lists throughout the entire plant and coordinated the work required to resolve them. Assisted in start up, using lock out-tag out safety methods and turnover to the plant to the owners.

1999-2001 Civil General Foreman CDK SKANSKA Farmington, New Mexico

Holnam Cement Plant Modernization

Florence, Colorado; 250 million dollar project, My duties were to oversee the construction for the foundation of an 1100’ by 300’materials storage building, from layout, excavation and backfill. For the installation of foundations and over two miles of conveyor system, crusher foundation, and feeder and diversion structures, including layout, excavation and backfill. Installation of DENSIT wear materials, welding plate, steel wear plates, installing weigh feeders, overseeing grout crews following all ACI rules for all embeds of structural and mechanical equipment both epoxy and conventional grouts, overseeing painting crews for epoxy painting of all structural steel. I worked with the owner’s representatives to establish punch lists for both mechanical and structural components finalizing them for startup, then turn over of the plant to the owner. I managed the crews for the punch list finalization and then demobilization of all company assets.

1991-1999 Self Employed General Contractor Durango, Colorado

Established and ran a successful general contracting business specializing in Concrete work, Remodels home building, public works and commercial structures. My business did public works projects, including curb and gutter sidewalks, storm drain systems, trails and driveways for the cities of Durango, Ignacio, Cortez and Silverton and the U.S. Forest Service. My company did foundations and remodel work for commercial buildings, including airplane hangars, warehouses and office buildings. I was responsible for Permitting, Bidding, Business Administration, QAQC, from Layout and excavation to backfill and landscaping, to completed project turned over to the owner.

1988-1990 Civil General Foreman CDK Contracting Co Farmington, New Mexico

Job site location was Cyprus Serrita, Green Valley, Arizona

Oversaw concrete construction for a 7’ conveyor system with a 15 man crew, from crusher foundation to head works with over 270 different embed placements with head wall retaining system to feed 100 ton discharge feeder over existing conveyor. This conveyor was over a mile long passing thru a manmade tunnel and discharged onto a live conveyor. Sewage Flow Diversion Lakeside, California, San Diego County Oversaw concrete construction of a sewage flow diversion project from layout to rebar installation, form pour and finish, oversaw a 10 man crew. Expanded a 225’ diameter holding tank and built pumping and flow diversion buildings.

1983-1987 General Partner Durango Concrete Company Durango, Colorado

Learned all aspects of residential and commercial concrete work, from design, layout, form, pour finish. Was responsible for Bidding and business administration, permitting.

1980 Core drilled in Silverton, Colorado for Conners Drilling CO. Montrose, Colorado, Summer Job from College

1978-1979 2nd Class Repair Miner AMAX Corp. Empire, Colorado

Drilled and blasted cave-ins, formed and poured concrete stabilization pillars, erected structural steel bracing, cribbed to support mine drifts from cave-ins., Drilled and installed roof bolts.

References:

Mike Scrones: Fisher industries 602-***-****

Fred Willadson Schmueser & Associates 505-***-****

Adam Ferman GE Johnson 303-***-****

John Camp Valshabar 850-***-****

Rusty Campana Colorado Power 208-***-****

Education:

1972-1976 Graduated Durango High School Durango, Colorado

1977-1982 Attended Engineering @ Fort Lewis College, Durango Colorado