FULL NAME: ABATI OMOFOYE OLALEKAN
PLACE OF BIRTH: LAGOS
DATE OF BIRTH: 14/05/1976
NATIONALITY: NIGERIA
STATE OF ORIGIN: OGUN STATE
LOCAL GOVERNMENT AREA: ABEOKUTA NORTH
RELIGION: CHRISTANITY
PERMANENT HOME ADDRESS: BLOCK 13 FLAT 5, ABESAN HOUSING ESTATE, IPAJA, LAGOS STATE
PRESENT AND POSTAL ADDRESS: BLOCK 13 FLAT 5, ABESAN HOUSING ESTATE, IPAJA, LAGOS STATE
GSM NUMBERS: 080********, 080********
E-MAIL ADDRESS: adm7e9@r.postjobfree.com
MARITAL STATUS: MARRIED
NUMBER AND AGES OF CHILDERN: ABATI AYOMIDE ENIOLA 13 YEARS
ABATI AYOBAMI OLUWASEMILORE 11 YEARS
ABATI AYOMIPO OLALEKAN 10 YEARS
ABATI AYODEJI 4 YEARS
INSTITUTION(S) ATTENDED WITH DATES
1998 –2004 UNIVERSITY OF LAGOS, AKOKA, YABA, LAGOS STATE.
1996 –1998 THE FEDERAL POLYTECHNIC ILARO, OGUN STATE
1989 –1995 YEWA HIGH SCHOOL, ORILE-AGEGE, LAGOS STATE
1984 –1989 ABESAN PRIMARY SCHOOL ABESAN HOUSING ESTATE, IPAJA, LAGOS.
DEGREE(S) OBTAINED WITH DATES
2003 B.Sc. in CIVIL ENGINEERING. (Second Class Lower Division)
1998 N.D in BUILDING TECHNOLOGY & QUANTITIES SURVEYING
1996 SENIOR SECONDARY SCHOOL CERTIFICATE
1991 PRIMARY SCHOOL LEAVING CERTIFICATE
PROFESSIONAL QUALIFICATION(S) OBTAINED WITH DATES
2012 COREN REGISTERED ENGINEER (R.22,105).
2011 THE NIGERIAN SOCIETY OF ENGINEERS (MEMBER 25530)
WORKING EXPERIENCE
OYINDO & OYINDO LIMITED (PROJECT ENGINEER)
14 IBB WAY, LOKOJA KOGI STATE. MAY.2018 – TILL DATE
oSupervisor and offers advice in the planning, co- ordination of technical aspects of construction projects of 5-storey building from the substructure, Superstructure electrical installation, Elevator Construction, Fabrication of the Steel Warehouse, and Supervision of block, responsibilities including solving technical issues, providing advice, management and preparing reports.
Makes field visit during construction phase, and interfaces with contractors around project schedule, interpretation of project document, codes etc. and prepares periodic status report to Line Manager.
Perform Quality Assurance, Quality Control and Audits
oReview Civil Designs & specifications, supervise and execution. Pilling works for BTS sites,, Ensure all Civil Work (CW) at dedicated sites are done to specifications, on schedule and at optimum cost and compliance with protect specifications, which includes foundation of tower, shelter, generator, building fence, etc., Ensure that all facilities are installed according to the specification which include shelter, tower, generator and telecom equipments, Acceptance of civil,electrical and tower works.
•Attend coordination and progress meeting.
o•Civil works problem solving as required during the project.
o•Coordinates site activities and assures that all disciplines directly involved in the project
•Drive schedule activities and trouble-shooting results
•Ensure all documents, Federal, Local, and customer safety guidelines and construction procedures are enforced during the entire Civil Works phase of the project-
• Supervision of substructure, utilities buildings, A Superstructure, electrical installation, air conditional work, finishes and external works
GLOBACOM LIMITED (ROLLOUT ENGINEER)
25 SAKA TINUBU VICTORIA ISLAND LAGOS. SEPTEMBER.2009 – MAY 2018
PROPOSED GLOBACOM TELECOMMUNICATION MAST AT KOGI STATE.
• Asses and control charges to the agreed site design.
•Agreed Civil Works guidelines and schedules are followed and enforced.
• Attend coordination and progress meeting.
•Civil works problem solving as required during the project.
•Coordinates site activities and assures that all disciplines directly involved in the project
• Ensure all Globacom, Federal, Local, and customer safety guidelines and construction procedures are enforced during the entire Civil Works phase of the project
• Perform the following tasks: Site pre-inspections and coordinate post-construction audits
• Site verification
• Visual inspection of quality on site
• Prepares regular interval progress reports as required by the project
• Provide accurate status information on the progress to project management
• Reject wrong deliveries of material to site
• Report bad performance and quality on site
•Responsible for the proper interpretation and compliance of the civil design plans
• Supervise, coordinate and monitor works with the Contractors and other disciplines that have an interface with the Civil Works part of the project
• Team leadership focusing on quality and results
• Write claims, order and return materials
HUAWEI TECHNOLOGIES NIG.LTD. PROJECT ENGINEER
98 ADEOLA ODEKU V/I, LAGOS. NOVEMBER, 2007 - AUGUST.2009
THE PROPOSED MTN TELECOMMUNICATION BTS
AT YOLA, ADAMAWA STATE
Alignment of MW antennas till we achieve required receive level, BTS troubleshooting and commissioning, Grouting the equipment rack and inserting all required modules, Interconnection with appropriate cables/jumpers, Grounding, weather proofing and labeling all cables in both ends, Inspecting all Civil work and Telecom Building work done by the Subcontractor, Ensure all Civil Work (CW) at dedicated sites are done to specifications, on schedule and at optimum cost and compliance with protect specifications, which includes foundation of tower, shelter, generator, building fence, etc., Ensure that all facilities are installed according to the specification which include shelter, tower, generator and telecom equipments, Acceptance of civil,electrical and tower works.
FORSITE NIGERIA LIMITED SITE ENGINEER
11, ALHAJI LATEEF JAKANDE RD, AGIDINGBI, MARCH 2007 – OCTOBER 2007
IKEJA, LAGOS, NIGERIA.
.,
THE PROPOSED MTN TELECOMMUNICATION BTS AT KEBBI STATE.
Inspecting all Civil work and Telecom Building work done by the Subcontractor, Ensure all Civil Work (CW) at dedicated sites are done to specifications, on schedule and at optimum cost and compliance with protect specifications, which includes foundation of tower, shelter, generator, building fence, etc., Ensure that all facilities are installed according to the specification which include shelter, tower, generator and telecom equipment, Acceptance of civil, electrical and tower works, Coordinate with telecom vendors, planning and engineering team, installation and commissioning of equipment.
BOFILL INTERNATIONAL LIMITED DESIGN – BUILD (PROJECT ENGINEER)
13, CATHOLIC MISSION STREET, LAGOS. NOVEMBER 2006 – FEBRUARY 2007
INEH-MIC AUTO MOTOR
Head Office at Igbo – Efon, Ajah, Lagos.
Supervisor of 5-storey building from the substructure, Superstructure electrical installation, Elevator Construction, Fabrication of the Steel Warehouse, and Supervision of block,
BTS (CELTEL) SITE LAG630F AT FEDERAL SCIENCE COLLEGE YABA. Inspecting all Civil work and Telecom Building work done by the Subcontractor, Ensure all Civil Work (CW) at dedicated sites are done to specifications, on schedule and at optimum cost and compliance with protect specifications, which includes foundation of tower, shelter, generator, building fence, etc.
MULTITECHNIES GLOBAL SERVICE LIMITED SITE ENGINEER
{BUILDING CONTRACTORS, ENGINEERS, PROJECT ENGINEERS} MAY 2005 – OCTOBER 2006
15 OYELEKE STREET, OFF KUDIRAT ABIOLA WAY’
ALAUSA, IKEJA, LAGOS.
PROJECTS: Zenith Bank Plc, Ottaru Road, Auchi Township, Edo state. May 2005- supervision of substructure, utilities buildings, Superstructure, electrical installation, air conditional work, finishes and external works.
- Guinness Nigeria Plc. Ogba Brewery.
June 2005. (Driver Amenities, Packaging Offices And
Associated works) supervision of Architecture Drawing
Drawn by Godwin Hopwood kuye GHK, Tillyard Nigeria
Quantities Surveyor, and Structural drawing drawn to specification by Ove Arup and Partners Nigeria (consulting Engineers)
-Zenith Bank Plc.
11Grace Bill Eket, Akwa-Ibom State.
- Oceanic International Bank Plc. Hammaruwa way, Jalingo, Taraba State.
November, 2005- supervision of substructure, utilities buildings, Superstructure, electrical installation, air conditional work, finishes and external works.
-Oceanic International Bank Plc. Olu Obasanjo Road.
Port Harcourt, Rivers State.
March, 2006- supervision of substructure, utilities buildings, Superstructure, electrical installation, air conditional work, finishes and external works.
-Mts1 Communicate, First wireless.
17 May 2006, Renovation of switch site for MTS First Wireless at Port-Harcourt GS TELECOM Premises
PERSONAL AND TECHNICAL KNOWLEDGE/SKILLS
Good Cooperative Attitude and high performance
Good with Microsoft Office suites.
AutoCAD / STAAD PRO Literate
Project Management skills
Civil engineering reinforced concrete and steel detailed design knowledge and experience
Interpersonal, networking and people management skills with ability to build and maintain effective working relationships with stakeholders
Project management abilities with demonstrated full life cycle project engineering experience
Proactive team player with a strong sense of initiative
Familiarity with industry and regulatory standards, procedures and practices with the ability to ensure execution of work in a safe and methodological manner
Awareness of Planning, Cost Reporting, Estimating and Change Control techniques.
Good planning and organizational skills, along with a high degree of detail orientation
Proven ability to work independently, as part of a team and with initiatives to meet tight deadlines
EXTRA CURRICULUM ACTIVITIES:
READING, FOOTBALL,
MEETING PEOPLE
REFEREES:
MR MOHAMMED ANKPA
STATE MANAGER,
GLOBACOM LIMITED,
64, IBB WAY, LOKOJA, KOGI STATE. 080********.
MR OLUCHI GANIYU
PROJECT MANAGER
HUAWEI TECHNOLOGIES NIG.LTD.
98 ADEOLA ODEKU V/I, LAGOS. 080********
ENGR OBASAN OLUKAYODE
PROJECT MANAGER,
OPTIMUM RESOURCES CONVERSION CONCENCEPT,
BLOCK 90 FLAT 4 ABESAN IPAJA, LAGOS STATE. 080********