Post Job Free

Resume

Sign in

Electrical Engineer Power Control

Location:
Madurai, Tamil Nadu, India
Posted:
June 14, 2021

Contact this candidate

Resume:

* ****

SHEIK USMAN

UPDA Qatar- Doha Registered Electrical Engineer

Address: India,

Mob:+918*********

Email: adm4lv@r.postjobfree.com

ELECTRICAL ENGINEER

Accomplished, proactive Electrical Engineer with significant experience in high voltage substation projects and in High rise buildings projects. Possess extensive educational qualifications with Bachelor’s degree in Electrical Engineer. Recognized for strong adherence to safety, ability to work well as team member and leader, and exceptional work ethic. Proven technical, interpersonal communication skills. Excellent client management skills with the innate ability to build strong, lasting and mutually beneficial relationships. Core competencies and professional strengths include:

Project

Execution/Planning/Mgmt

Documentation Report Preparation

Design, testing coordination Safety compliance Resource allocation

Material planning Cost controls Purchasing

Operation management Quality control Manpower supervision CAREER SUMMARY:

Total 9 Years of experience in as an Electrical Engineer in Substation and Buildingprojects.

Establishing/revising the requirements on technical specifications and technical contracts, and application of technical standards.

Review on design calculation, drawing layout, materials are submitted byContractors.

Preparation of budget cost along with bill of quantity (BOQ) and man-hour costing, other application works for bids and awards submission.

Project co-ordination meeting with clients, engineers, contractors, preparing correspondence report, works progress and completion report, works quality and updates.

Testing and commissioning on all equipment involved, controls and auxiliaries.

Clearing of defect / Snag lists, remark drawings along with as-built drawings.

Establishing the planned, preventative maintenance (PPM) schedules along with equipment frequencies and feeding to WIMS programs.

ACADEMIC QUALIFICATION:

DegreeinElectricalandElectronicsEngineering,MohammedSathakEngineeringcollege, AnnaUniversity ChennaiWithanaggregateof65%during2007-2011 2 Page

PROFESSIONAL EXPERIENCE:

Designation: PROJECT ENGINEER Oct 2017 – Jan 2020

Company : L&T ELECTRICAL AUTOMATION,QATAR

Projects handled:

- Qatar Rail Project

Project Execution Exposure:

Reviewing of shop drawings and material submittals in line with the contract documents, local authority’s requirements and international standards and regulations.

Conducting surveillance and inspection duties at various stages of the project delivery to ensure compliance to contract requirements and to QA / QC requirements.

Monitor the installation works according to the approved drawing & method statement.

Coordination with the Supervisory Consultant (PMC)to carryout inspection/testing of the completed works.

Ensured compliance with Standard (BS Standard, “QCS 2014” Standard & “KAHRAMAA”standards).

Conduct Quality Control checks at site and ensure that the works fully comply with approved drawings and specifications

Verify that the latest and approved versions of Drawings, Method Statements, ITP's are used at site.

Coordination of Testing & Commissioning for HV&LV Panels, Transformer, Circuit Breakers, Bus duct Unit, Raising main Unit, and HT & LT Cables, All Electrical Systems.

Execute the Indoor and Outdoor installation and co-ordination of Testing & commissioning of HV Panels, Transformers, Diesel Generator and HV/MV cable Laying.

Inspected sub-contractor’s electrical works like installation of cable trays, conduits and cabling in compliance with approved construction drawings and standard specifications.

Efficiently liaised with Client and subcontractor for loop check, logic and function test controlling and guiding sub-contractors for better completion of project.

Raise and coordinate the closure of NCR's in a timely manner.

Assistincontrollingtheworksofsubcontractorstoensurecompliancetoproject specifications.

Conduct Material Approval Inspections as required with the Customer Representatives.

Verify that all materials and equipment being delivered to site for use have the right documentation to ensure conformity to requirements.

Depth Knowledge for Installation of Electrical activities (Cable Containment System, Fire alarm System, BACS System and Telephone & CCTV camera System)

3 Page

Designation: ELECTRICAL & MEP INSPECTOR Feb 2016 –Sep 2017 Company : MOTT MACDONALD,QATAR

Projects handled:

GTC-488B/2012 – Qatar Water and Electricity – Phase 11 Transmission Substation Projects (2016-2017) – 66/11kV Power transformers for Grand Hamad Ave. Substation. GTC-488G/2012 – Qatar Water and Electricity – Phase 11 Transmission Substation Projects (2016-2017) – 66/11kV Power transformers for Wadi South Substation. GTC-488G/2012 – Qatar Water and Electricity – Phase 11 Transmission Substation Projects (2016- present) – 66/11kV Power transformers for EDC-11 Substation. Project Execution Exposure:

Reviewing of shop drawings and material submittals in line with the contract documents, localauthority's requirements and international standards andregulations.

Assist the Project manager in reviewing Electrical, HVAC, Firefighting and Fire Alarm drawings, submittals etc. as per the local authority requirements andapproval.

All site Inspection shall be carried out vide RFI Submitted by the contractor through the properchannels

Physical inspections and supervision of installation and testing of light, power, voice and data, fire alarm, building management, CCTV, lighting control systems in line with approved projectdocuments.

Supervision for the installation of 11/0.4 kV PUs and 60km of 11kV cable laying works including terminations & cable jointing along with associated activities to ensure KAHRAMAA specifications and standards are complied.

Supervision and inspection of testing and commissioning of HV test, primary injection & secondary injection tests for RMU; IR test, Winding Resistance test & all other TR tests; IR test for LV panel, etc.) and 11kV, 3Cx240mm2 Cu XLPE power cables.

Participating during shutdown activities & coordinating with contractor, ensuring successful execution & completion till the energization of the electrical system complying with clients’ rules & regulation.

Testing and commissioning of all HVAC and Firefighting and Fire Alarm systems.

Monitoring and ensuring necessary co-ordination between site and engineering process throughout theproject.

Planning & ensuring the allocation of necessary erection, testing & commissioning resources to meet the requirements

Ensure that all activities carried out by the contractors/service providers used on site are completed in a Safe and Environmentally acceptable manner, as well as understanding and maintaining an up-to-date awareness of the HSE Policy

Issuing Non Conformance Report (NCR) if work not done as per approved methodstatement.

Participate with KAHRAMAA disciplines on reviewing the Close out Report as submitted by Contractor. 4 Page

Company: Southern ElectronicsPvt.Ltd,Bangalore. August, 2011 – Dec,2015 Designation: SITE ELECTRICAL & MEP ENGINEER

Project: FIREPROTECTIONSYSTEMS,SAFETYSYSTEMSANDHVAC Client: G+8 LAKE VIEW APARTMENTS BY SHOBACONSTRUCTIONS,BANGALORE Role played:

Responsible for getting approval for the fire alarm and protection system of the substation area. conduits fittings, Installation of Smoke detector, heat detector, manual push button, bell with strobe, horn withstrobe, Fire signaling and Fire protective panel(FSFP).

Executing the Electrical & Low Current Works installation and Testing of the Fire Alarm, Telephone, CCTV, SMATV, Central Battery System, Access Controlsystem.

Preparation of shop drawings, material submittals forapprovals.

Record all changes on site and review As-Built drawings &Submissions.

Monitoring the project during execution of MEP services with respect to civil structures and ensures works are done as perscheduled.

Effective monitoring of safety regulations and practice for theproject.

Supervision of day to day erection activity of Electrical and Mechanical equipment like 132kV GIS, 11kV Switchgear, IDTs, ETs, capacitor banksetc

Project: ELECTRICAL&MEPRELATEDWORKS

Client: G+12 APARTMENT BUILDING, LAND MARVEL CONSTRUCTIONS Role played:

Responsible for preparing the fire alarm and protection system of the substation area. conduits fittings, Installation of Smoke detector, heat detector, manual push button, bell with strobe, horn with strobe,Fire signaling and Fire protective panel(FSFP).

Installation of Fire detection and alarm system for various panels like Simplex 4100U,4010, GE EST- 3,Honeywell Notified NFS-320,Kidde Aegis, simplex 4004R Gaseous suppression Releasing panel, 4009 IDnet NAC Extender and Aspiring Smoke detection VESDA VLC-600,VLF-500,Code Blue IA4100 Emergency Speaker phone. Testing and commissioning of power control center and motor controlcenter

Involved in Pre -commissioning and Testing of Fire Alarm & Fire suppression system, blow test and Pressure test and Room IntegrityTest.

Involved in final testing and commissioning of Fire and Fire SuppressionSystem. 5 Page

PERSONAL DETAILS:

Date of Birth : 07-12-1989

Gender : Male

Marital status : Single

Nationality : Indian

Languages Known : English, Tamil and Hindi.

Passport No :M2357317

Place of Issue : Madurai, India

Date of Issue : 24-09-2014

Date of Expiry : 24-09-2024

I assure the correctness of the above and request you kind attention in considering my CV for suitable position into Project Engineer.

I wait to hear your kind communication at the earliest and assure you the best of my ability towards the growth of the organization on appointing me.

Warm Regards

SHEIKUSMAN



Contact this candidate