CURRICULUM VITAE
MICHAEL C. PAULIN
Address#** ****** ******* ********** ********, Pasig city
E-mail address: ****************@*****.***
Mobile: Smart-096********
Objective:
Looking for demanding position where my motivation and commitment to excellence
Will be utilized and advanced. I would appreciate the opportunity to put my skill to use in a
Position for the expansion and advancement with a dynamic and challenging work environment.
Position Applied : Surveyor
PERSONAL INFORMATION
Birth Date : September 12, 1971
Place Birth : Marawi City
Gender : Male
Civil Status : Married
Religion : Roman Catholics
Nationality : Filipino
Languages to speak and write : English, Visaya & Tagalog
Nick name: Mike
Passport #: EB0693733
Date issued: August 04, 2010
Valid until: August 03, 2015 issuing authority: PE DOHA
Education Information:
Yr – To School/Address Course
College
1990-1995
Mindanao University of Science and Technology Cagayan De Oro,Misamis Oriental
Bachelor of Science in Geodetic Engineering
High School
1985-1989
Saint Michael’s College Iligan City
Elementary
1979-1985
Iligan City Central School
SKILLS : Computer Literate / Auto Cad 2D and 3D
Employment Information
Company : FODC-FIRST ORIENT DEVELOPMENT AND CONSTRUCTION CORP.
Address : 3880 Santol extension, Barangay 587.Sta Mesa,Manila City
Period : April 8,2018 TO 2021
Position : Senior Surveyor
Company : WoodsfieldConsultants, INC.
Address : Topographic and Hydrographic Survey DPWH
Period : January 20,2015 to March 30, 2018
Position : Land Surveyor
Company : Eagle Cement Corporation
Address : Geothermal Plant Expansion project Cement Plant LINE-2
: Brgy, aklie San Ildefonso Bulacan
: Main office 153 Edsa Mandaluyong City
Period : June 26, 2013 to January 15 2015
Position : Surveyor
Company : Asian Construction& Development Corporation
SKY-ORYX JOINT VENTURE-(TAISIE-TAV)
Address : New Doha International Airport Main Terminal complex
Doha State of Qatar
Period : October 01, 2006 to October 01, 2012
Position : Senior Surveyor
Duties and Responsibilities (Job Description)
(VERTICAL & HORIZONTAL WORKS)
: Conduct feasibility study to find if the location is accurate spot for the construction.
: Create the miniature of the construction plans that would serve as the source of the site plans.
: Perform detailed field survey such as topographic and Hydrographic survey.
Used Total station, RTK, and echo sounder.
: Record the result of survey including the contour, location and elevation.
: Process the data and interpret using AutoCAD and/or civil 3D software.
: Establish control points and benchmarks necessary for the execution of the works.
: Verify the accuracy of survey data.
: Measure the site using surveying instruments and global positioning system (GPS) to have a graphic
Presentation with exact coordinates of the site features and creates photogrammetric records.
: Analyze and interpret data using geographic information systems
: Keep in touch in with the engineering and architectural personnel, clients, and others concerned
With project.
: For hydrographic surveying or mapping and offshore feature, the following task maybe assigned.
: Surveying natural waterways and canals for environmental projects.
: Navigational charts
: To check a lat plan prior the Coordinates, & Dimension of land.
: Check the contour line of its p&s is visible.
: Lay-outing the exact grid marker upon starting the construction.
: make sure the (TCT) in actual site location plan is thoroughly correct.
: Plat the actual site location base on mapping coordinates.
: Lay-outing the exact position of underground pipeline & its correct elevation.
: Established elevation for top of concrete foundation & pedestal.
: Check the plumpness of structural columns.
: Setting out of point for foundation
: To ensure that the pad plates are in exact location, & elevation prior to the erection structural
: Established benchmarks and reference gridline.
: Ensure the plumpness & alignment upon final installation of structural steel
: Make sure the volume Quantities of concrete during pouring is it thoroughly correct.
: Check the properly slope on concrete slab as per design required.
: To established benchmark every six meters applicable so that it can be seen.
: To locate the radius of curved on actual site.
: To be safe & avoid caution, always putting safety signboard after leaving the area.
Company : SUPER ASIA ERECTORS CORPORATION
60tph/ SMFI Feed mill Plant (Chia-tong Phil)
Address : Mariveles, Bataan Philippines
Period : April 15, 2005 to January 15, 2006
Position : Surveyor
Company : Sumitomo
Project : Globe project site telecommunication Phase 10 & 12
Address : Northern part of Luzon, Philippines
Period : August 29, 2003 to April 10, 2005
Position : Surveyor
Company : Polycrete Enterprises
Project : Rio Tuba mining Plant Projects
Address : Palawan Island, Philippines
Period : June 12, 2001 to March 18 2003
Position : Surveyor
Tools and Equipment Used:
: Electronic total station (Nikon DTM 550)
: Electronic total station (Sokkia set 3030R)
: Electronic total station (Topcon NTS-325)
: Mechanical & digital Theodolite transit (Nikon)
: Auto level (Nikon DTM-A510) (Nikon DTM-720)
: Global Positioning System (Sokkia brand)
: GPS-RTK stonex and echo sounder
Seminar/ Training /Achievements / Certification Information
Certificate of Completion: Fire Fighting and Fire Prevention Course (March 30, 1994)
Certificate of Attendance: Firefighting Fire Prevention Orientation Course (February 28, 1998)
Certificate of Completion: First Aide Training (November 23-24, 1998)
Certificate of Achievement: 1 million man hours without a lost time Injury (September 13, 2007)
Certificate of Achievement: 2 million Man hours without a lost time Incident (February 28, 2008)
Certificate of Recognition: Safest Supervisor for the month (August 2010)
Certificate of Appreciation: Job Safety Commitment Program (April 23 to May 16, 2012)
Certificate of training Sonarmite Echosounder January 5, 2017