CURRICULAUM VITAE
Application for post of "WELDING SUPERVISOR"
RAJKUMAR
E-mail:-adlycu@r.postjobfree.com
Skype Id:- raj.kumar10800
WorkingExperience
Career Objective:
My Objective is to get a challenging position to utilize my knowledge, Experience exchange my skills and demand quick a customization to changing industry needs.
Job Responsibilities: -
Site supervision and distribution ofwork
Manpower distribution and welding progressmonitoring.
Time keeping of ouremployees.
Implement the weldingprocedure.
Collection of material, consumable from warehome.
Implement the piping and weldingprocedure.
Implement the productivity forwelding
Carried number of man power required bythe company.
To plan for daily job as per the weekly jobschedule.
To report the welding progress on dailybasis.
To monitor the quality productivity of wholeteam.
Preparation of daily report and inspectionreport.
To ensure that daily welding reports dailybasis.
To Ensure that daily work isdone.
TECHNICAL QUALIFICATION:
DIPLOMA IN MECHANICAL ENGINEER FROM INTERNATIONAL DISTANCE EDUCATION ACADEMY RAJKOTGUJRAT
PASSED INJULY2010.
Done the NDT level IIcourse from SONAR NDT & WELDING CONSULTANTS NAVI MUMBAI MAHARASHTA.
PASSED IN FEB. 2011
Steel Fabricator (as welder) One Years Course from GOVT I. T. IA K S NIZAMUDDIN NEW DELHI110013.
PASSED IN2003
COMPUTER KNOWLEDGE:
MS Office (Word, Power Point, Excel), HTMLInternet.
EDUCATION QUALIFICATION:
10+2 Passed from National OpenSchool
Working Experience:
Total 16 Years’ experience in Oilfields Various Plants (PIPELAYER BARGE/LNG/LPG/RIG/ LIVE RIG PLATFORM/ CROUSS CUNTRY PIPELINES) Offshore and offshore in INDIA and ABROAD LIKE KAZAKHASTAN/ ANGOLA (WEST AFRICA) / UAE / QATAR/ MALDIVES ONSHORE AND OFFSHORE.
Working in DESCON QATAR AS WELDING SUPERVISOR AT RLOC SHUTDOWN PIPELINE REPLACE PROJECT IN RASLAFFAN OILFIELD. From 14/02/2020 to 22/03/2020( project stopped due to carona pandemic)
Job Responsibilities: -
CONTROL GTAW/SMAW/ FCAW WELDING TEAM, SOLVED THIRD PARTY INSPECTION ISSUSE, CHECK DAILY PROGRESS REPORT, MAINTEND WELDER QUALIFICATION RECORDS AND FULL FILL THE REQUIRMENT CLIENT SIDE.
Worked with DOOSAN BABCOCK ABU DHABI UAE AS WELDING SUPERVISOR EMIRATES STEEL PIPE LINE PROJECT FROM 10/03/2019 TO10/04/2019.
Job Responsibilities: -
ON SITE VISIT AND CHECK SMAW /GTAW/FCAW WELD VISUAL INSPECTION FOR QC DEPARTMENT AND CLIENT.
Working with TECHCELLENT INSPECTORATE PAJPL 18" PIPELINE LHOT TAPPING PROJECT IN JHUGGIAN LUDHIANA PUNJAB, as WELDING ENGINEER FROM 15/12/2018 to28/02/2019
Job Responsibilities: -
ON HOT TAPING JOB SITE VISIT AND INSPECTED FITTING FOR JOB AND SMAW-FCAW WELD VISUAL INSPECTION FOR CLIENT.
WORK WITH CORRTECH INTERNATIONAL LIMITED IN JPNPL PIPELINE PROJECT REWARI/JAIPUR SECTION as a SITE SUPRINTENDENT (WELDING) from 10/04/2018 to21/11/2018.
Job Responsibilities: -
SITE VISIT AND INSPECTED ALL ACTIVITIES LIKE TRUNCH OPENING R O W JOB PROGRESS SPOOL LAINING MAINLINE SMAW- FCAW WELDING ACTIVITIES COATING NDT PROCEDURE ETS.
WELDING SUPERVISOR IN QATAR AT QNFS FOR SHELL SHUTDOWN TA18 FROM 23/01/2018 TO 01/01/2018 (projectcomplete).
Job Responsibilities: -
CONTROL NIGHT SHIF OF GTAW/SMAW/FCAW WELDING TEAM, SOLVED THIRD PARTY INSPECTION ISSUSE, CHECK DAILY PROGRESS REPORT AND FULL FILL THE REQUIREMENT FRON CLIENT SIDE.
WORKED WITH SINGH CONSTRUCTION NEW DELHI (IGL CNG PIPELINE PROJECT) as a SITE ENGINEER(WELDING) from 10/12/2015 to20/01/2018.
Job Responsibilities: -
SITE VISIT IN DELHI NCR CNG PIPELINE AND INPECTED LIKE SPOOL LAINING MAINLINE SMAW-FCAW WELDING ACTIVITIES COATING NDT PROCEDURE ETS.
WORKED WITH SAIPEM PETROMAR ANGOLA(AFRICA) MAFUMEIYA -3 OFFSHORE PROJECT (Deck Extension, Structural, piping installed PIG launcher and receiver) IN SOYO OFFSHORE AT NORTHE PLATEFORM as a WELDING FOREMAN from 10/03/2015 to 01/10/2015.
Job Responsibilities: -
CONDUCT TOOLBOX MEETING BEFORE START JOB, CONTROL GTAW-SMAW WELDERS AND DISTRIBUTION WELDING JOB BY THE REQUIREMENT OF PIPING DEPARTMENT AT DIFFERENT LOCTION IN NORTHE LIVE RIG PLATEFORM OFFSHORE. PREPAIR ALL CONSUMABLE ELECTROD FILLER FIRES ARGON CYLINDERS AND DAILY WELDING REPORT FOR SUPERVISOR AND QC DEPARTMENT.
Worked in ESSAR OFFSHORE SUBSEA LIMITEDC7 FPSO T& 1 PHASE -1 OFFSHORE PROJECT (PIPELINE PROJECT) AT ONGC FIELD MUMBAI OFFSHORE as a WELDER SUPERVISOR from 04/04/2014 to 17/05/2014. (PROJECTCOM.)
Job Responsibilities: - Techcellent Inspectorate
TOOLBOX TALK, DAILY WELDING REPORT, GTAW-SMAW WELDING JOB DISTRIBUTION AT NAND GOURAV BARGE MUMBAI OFFSHORE.
Worked in ENI SAIPEM KAZAKHSTAND ISLAND KASHAGAN OFFSHORE HOOK-UP PROJECT (Piping, Structural, Pipe rack, pipeline and Module Installed) NEAR ATYRAU CITY KAZAKHSTAN as a WELDING FOREMAN from 30/09/2011 TO 25/05/2013. (PROJECTCOM.)
Job Responsibilities: -
CONDUCT TOOLBOX TALK BEFORE START JOB CONTROL GTAW-SMAW/FCAW WELDERS AND DISTRIBUTION WELDING JOB BY THE REQUIREMENT OF PIPING DEPARTMENT AT DIFFERENT LOCTION IN ALL AROUND AREA AT D ISLAND OFFSHORE PREPAIR ALL CONSUMABLE ARGON GAS CYLINDER ELECTROD FILLER FIRES AND DAILY WELDING REPORT FOR SUPERVISOR AND QC DEPARTMENT.
Worked In KALP-PVT LTD.IN DADARI NANGAL PIPELINE ROJECT AT LUDHIYANA CAMP IN PUNJAB as a WELDER SUPERVISOR (Pipeline) from 23/05/2011 to20/09/2011.
Job Responsibilities: -
SITE VISIT AND INSPECTED ALL ACTIVITIES LIKE TRUNCH OPENING R O W JOB PROGRESS SPOOL LAINING MAINLINE SMAW-FCAW WELDING / COTTING NDT PROCEDURE ETS.
Worked with PUNJ LLOYD LTD RELIANC DHABOL BANGLORE PIPELINE PROJECT KHOLAPUR CAMP IN MAHARAST as a WELDER FOREMAN (Pipeline) from 18/02/2011 to18/05/2011.
Job Responsibilities: -
CONTROL FCAW WELDER AND MANPOWER AT MAIN 48” PIPELINE AT SITE. CHECK NDT ACTIVITIES.
Working with FERNAS CONSTRUCTION COMPANY LTD. As a WELDER FOREMAN from 09/09/2010 to 31/01/2011.
Job Responsibilities: -
CONTROL FCAW WELDER AND MANPOWER AT MAIN 48” PIPELINE AT SITE. CHECK NDT ACTIVITIES.
Working as a DOLLY MIX WELDER FOREMAN (5G. 6G, F.C.A.W, S.M.A.W WELDING) With PUNJ LLOYD LTD. D.V.P.L II PROJECT VADODRA (GUJ.) FROM 26/06/2010 to08/09/2010.
Job Responsibilities: -
CONTROL SMAW-FCAW WELDER AND MANPOWER AT MAIN 48” PIPELINE AT SITE. CHECK NDT ACTIVITIES.
Worked with FERNAS CONSTRUCTION COMPANY LTD. As a DOLLY MIX WELDER FOREMAN from 25/10/2009 to25/01/2010.
Job Responsibilities: -
CONTROL SMAW- FCAW WELDER AND MANPOWER AT MAIN 48” PIPELINE AT SITE. CHECK NDT ACTIVITIES.
Working as a WELDER FOREMAN (PIPELINE) With ESSAR PROJECTS V.D.P.L PROJECT IN GUNA (M.P.) FROM 10/01/2009 to 20/09/2009.
Job Responsibilities: -
CONTROL SMAW-FCAW WELDER AND MANPOWER AT MAIN 48” PIPELINE AT SITE. CHECK NDT ACTIVITIES.
Worked in PUNJ LLOYD LTD RELIANC EAST WEST PIPELINE PROJECT VADA CAMP IN MAHARAST As a WELDER FOREMAN rom 28/08/2007 to25/11/2008.
Job Responsibilities: -
CONTROL SMAW-FCAW WELDER AND MANPOWER AT MAIN 48” PIPELINE AT SITE. CHECK NDT ACTIVITIES.
Worked with MATRIX CONSTRUCTION IN ABU DHABI U.A.E as a Down & up (5G 6G) Hill Welder in ADCO PROJECT FROM 10/05/2007 TO23/08/2007.
Job Responsibilities: -
DONE SMAW WELDING JOB AT MAIN 6” PIPELINE AT SITE.
Eight-Month Exp. As a Down (5G. 6G, F.C.A.W, S.M.A.W WELDING) Hill Welder with PUNJ LLOYDLTD.
D.U.P.L PROJECT SHACHIN DISST. SURAT (GUJ.) FROM 23/09/2006 TO 10/04/2007.
Job Responsibilities: -
DONE FCAW WELDING JOB AT MAIN 48” PIPELINE AT SITE.
Five-Month Exp. As a Down & up (5G. 6G, F.C.A.W, S.M.A.W WELDING) Hill Welder with ESSAR CON.LTD.
D.U.P.L PROJECT KILLA PARDI DISST. VALSAD (GUJ.) FROM 29/05/2006 TO 22/09/2006
Job Responsibilities: -
DONE FCAW WELDING JOB AT MAIN 36” PIPELINE AT SITE.
BOSIET SAFETY COURSE: -
BASIC OFFSHORE SAFETY INDUCTION & EMERGENCY TRAINING OPITO APPROVED.
UNIQUE CERTIFICATENUMBER:- 81575700031011007
PASSPORT DETAILS: -
NEWPASSPORTNO: T5617337
PLACEOFISSUE: NEWDELHI
DATE OFEXPIRY: till2029
E.C.N.R.: EMIGRATION CLEARANCE NOTREQUIRED
PERSONAL PROFILE:
Name : RAJKUMAR
Dateof Birth : 03/07/1980
Father'sName : SH. MAHADEV PRASAD Permanentaddress. : NEWDELHI
Contactno. : +918*********
987*******(home)
Religion : Hindu
Gender : Male
Marital Status : Single
Hobbies : Playing Cricket Listing Music andReading
Language : Hindi,English
Place:
Date: (RAJKUMAR)