Rishabh Gupta
Mining Professional
Agile & Enthusiastic mining professional with work experience of about 2 years in mining Industry adluaj@r.postjobfree.com
Balrampur, Uttar Pradesh
07 July, 1998
SOFTWARE
SKILLS
DATAMINE WipFrag
AutoCAD Blastware
ANSYS FLAC
MS-Office
LANGUAGES
English
Full Professional Proficiency
Hindi
Native or Bilingual Proficiency
INTERESTS
Volley ball
Watching Motivational
movies
Chess Music
WORK EXPERIENCE
Assistant Manager
Hindalco Industries Limited
07/2020 - Present, Jharkhand
Planned production planning, manpower distribution and mine planning through DataMine and AutoCAD software.
Developed a safety culture at mines by achieving 100% in safety training to the contractor & company workers and safety interventions.
Achieved 85% CCI (Performance Indicator) in consecutive two quarters in FY 2020-21 as reviewed by WCM
(world class manufacturing-Hindalco Industries Ltd). Worked as an assistant auditor during internal mines audit by SHE (Safety, Health and Environment) audit team.
Graduate Engineer Trainee
Hindalco Industries Limited
07/2019 - 06/2020, Jharkhand
Learned about different manufacturing processes for aluminium production through several inductions at various units of Hindalco.
Worked on a project "Assessment and optimization of blasted size material” using WipFrag software. Continuously monitored and Improvised HEMMs overall operational effectiveness. EDUCATION
Bachelor of Technology
National Institute of Technology Rourkela
07/2015 - 06/2019, GPA : 8.06
Mining Engineering
Intermediate In Science
Janta Inter college, Gonda
2014, Percentage : 92%
Matriculation
City Montessori Inter college, Balrampur
2012, Percentage : 88.5%
PROJECTS
Assessment and optimization of blasted material (2020) Performed Fragmentation analysis of blasted size material using Wipfrag software. Modified blast design parameters and assessed explosive requirements for obtaining desired range of blasted size material (150-200 mm).
Minimized the generation of undersized blasted material by 30 % that has improvised recovery percentage of the ROM by 20 % and reduced overall blasting cost as well. Study of empirical relation for blast induced acceleration (2019) Proposed an empirical relation between peak particle velocity and acceleration of blast induced ground vibration through Instrumentation and analytical approach.
Correlated the data of Blastmate (PPV) and Blastware software (acceleration) through regression analysis. Assessment of blasting AOP(Air overpressure) (2018) Performed regression analysis to correlate the AOP and different blast design parameters. Obtained a set of blast design parameters which influence the prediction of AOP most. Proposed an empirical formula for AOP by multi variate regression analysis. Achievements/Tasks