RESUME

R.DIVAKAR

**/**, ************* ****,

Townstation, Trichy-620002

Mobile no: 770-***-**** E-mail: adltl2@r.postjobfree.com

OBJECTIVE:

To work in a competitive environment that gives growth to the organization and

individual.

EDUCATIONAL QUALIFICATION:

Course Name Name of the institution Year of Passing Percentage

J.J.COLLEGE OF ENGINEERING

APRIL 2014

B.E.(EEE) AND TECHNOLOGY 7.4

TRICHY

SHANMUGA POLYTECHNIC

DEEE COLLEGE APRIL 2011 92

THANJAVUR

E.R.HIGHER SEC. SCHOOL

HSC APRIL 2009 79.58

TRICHY - 2

E.R.HIGHER SEC. SCHOOL

SSLC April 2007 88.6

TRICHY - 2

EXPERIENCE:

Working as Maintenance Engineer at Kelin India Pvt Lt. From Apr-2018 to

present.

Worked as execution and commissioning engineer in MEL Systems & Services

From June 2014 to Feb 2018.

Skills:

Assist and deliver improvement projects to assist with reduction of breakdowns and

short stops.

Monitor Preventive/Predictive maintenance program and ensure timely resolution of

all identified issues.

Assist in Corrective-maintenance, Preventive-maintenance and/or Project cost

estimation.

Assisting with incident management and subsequent investigation to establish root

cause

Develop long and short term plans for equipment improvements

Work individually and within a team to minimize mean time to repair (MTTR). Work

effectively on prioritized automation and related breakdowns and issues

Working closely with colleagues to deliver against the customer requirement.

Oversee the junior engineers according the shift plan and also give training to them in

their respective fields.

Experience on UPS, Battery charger, VFD.

Experience with installation and troubleshooting of electrical equipment such as

low/medium/high voltage switchgear, transformers, motors and distribution systems.

Knowledge of reliability methodologies and strategies such as TPM, Spare Parts

Management, Planning & Scheduling.

Modify existing PLC programs for increased efficiency and performance.

Write basic PLC programs for projects as needed.

Experience with computer use specifically in Word, Excel, PowerPoint, and

AutoCAD.

Assist and partner with management representatives on implementation of process

improvement (Six Sigma / Lean, Kaizen, 5S), including leading change initiatives,

planning, and facilitation.

ISO documentation, Quality Circle formation for detecting problems and solving from

shop floor employees.

Conducting Safety audits within the department and ensuring the compliance from all

the employees and updating the checklists and audit reports.

Energy Management Skills knowledge of Carbon Emission Reduction Initiatives.

Excellent written / oral communication skills.

Awareness on factory EHS, site environment, health and safety policy.

Awareness on Hazardous area classifications and selection of electrical equipment.

Software Exposure:

RX Logix 5000 basic trouble shooting

Vigor PLC ladder diagram.

Delta DVP series

Electrical Auto CAD Diagram basics

C,C++, MS Office

Projects handled:

Zircar Crucibles Pvt. Ltd, Mehsana, Gujarat

Worked as a Project coordinator for the whole project and to handle all the

electrical works including cable scheduling, wiring, testing and commissioning.

This project is about auto batching system, which contains 900 I/Os & 38 silos

and about 1 ton per hr capacity.

ROLE: To execute the cable schedule for whole plant. To lay and terminate all the

wiring in both panel and field terminals.

1) This project contains 28 NOs 1HP motor, 28 nos 3kw vibrator motor.

2) 7 AB power flex drive

3) For weighing system 6 weigh hoppers, 24 load cells, two mobile weigh

hopper trolley and 8 Metler Toledo indicators.

Installed and commissioned all the above with the team of three members and

successfully commissioned.

Thirunelveli Water distribution board

1) Handled instruments like Pressure transmitter, Ph sensor, Flow

transmitter, Level sensor and level transmitter both service and

installation.

Tube Products of India Avadi

Load cell jumbo indicator installation

MIDAS Golden Distilleries Ltd Padappai .

Load cell Service

ABB, Mysore weigh bridge installation.

Jamkhandi sugars, Karnataka Weigh bridge installation.

JK Tyres- Mysore Weigh Bridge Installation

Asian Paints Chennai Rope hoist automation installation and commissioning.

ROCA Bathroom Products

1) This Projects consists of 150 IOs, which is a batching system used for glaze

coating.

2) Scope of work is to execute the cable schedule, meet the requirements of

the projects.

3) To commission the project in the customer side.

SOFTWARE EXPOSURE:

RX Logix 5000 basic trouble shooting

Electrical Auto CAD Diagram basics

C,C++, MS Office

Instruments Handled:

Load Cell

Weigh Indicator

Level Sensor

Level Transmitter

Pressure Transmitter

Flow Transmitter

Band Heater

Load cell summing box etc.

Electrical Exposure:

PLC Panel Wiring

Electrical IO testing.

Drives Configuration( AB Power flex 40, Power flex 525)

Signal Isolators,

Reed & Magnetic Switches.

Photo Electric Sensors,

Proximity sensors.

Motor Configuration.

Screw Compressors

Diesel Generators

LEADERSHIP POTENTIAL:

Currently working as Maintenance Head in the current position, leading a team of

three engineers.

Lead a group of labors for erecting a new plant.

Served as Class Representative in my College

Organized Department day function as a co-ordinator

PERSONAL

INFORMATION:

DATE OF BIRTH : 31.12.1991

FATHERS NAME : T.RAVEENDRAN

FATHERS OCCUPATION : Working in a private consent

RELIGION : HINDU

NATIONALITY : INDIAN

MOTHER TONGUE : TAMIL

LANGUAGES KNOWN : TAMIL, ENGLISH, AND HINDI

DECLARATION:

I hereby acknowledge that all the information given above is true to the best of my

knowledge.

Place: Trichy. SIGNATURE