ABIKELEGBA AWOROKE OVOKE
**, ********, ****, ***** ****, LAGOS STATE.
E MAIL ADDRESS: *******@*****.***
TEL: 090********,070********
PERSONAL DATA:
Date of Birth: 14th February, 1981
Sex: Male
Place of Birth: Ozoro
Marital Status: Married
Local Govt. Area: Isoko north
State of Origin: Delta
Nationality: Nigeria
Religion: Christianity
SCHOOLS ATTENDED WTH DATES
Enugu State University of Science and Technology 2002-2007
General Certificate of Education (GCE) 1999&2000
Egware Primary School, Ozoro 1988-19931988-1993
QUALIFICATIONS OBTAINED WITH DATES:
B. Eng Electrical/Electronic Engineering 2007
General Certificate of Education (GCE) 1999&20001999&2000
First School Leaving Certificate 1986-1992
WORK EXPERIENCE:
POSITION: ElECTRICAL AND INSTRUMENTATION ENGINEER.
COMPANY:DUFIL. 2020 Til Date
PROJECT:COMMISSIONING OF CASSAVA TO FLOUR PLANT
JOB DESCRIPTION
Cable sizes identification and corresponding Ampares.
Implementation of Block diagrams.
Laying of cable using your blueprint.
Installation of a control room at Milling zone, Drying zone and Process zone.
PLC used at various control room.
Dryer: Mobox commiunication protocol Profitbus.
Milling zone: Siemens S7, commiunication protocol Profitbus.
Process zone: Siemens S7 commiunication protocol Profitbus.
Installation of MCC panels motor control center.MCC1,MCC2,MCC3,MCC4 and MCC5
Installation of OCC panel: operational control center.
Operation of PRMS 3000 Plant for supply of Methane gas to Gas GENERTOR 2000kva and Dryer 450kw.
PRMS include low pressure line and Siemens control panel, Siemens controller S7 24v.
Maintenance of a Boiler 120kw to raise the temperature of gas without freezing.
Implementation of circuit diagram at the Dryer 250kw
Operation and maintenance of a 2000kva gas generator.
Commiunication protocol for Gas generator is CANBUS
Controller Siemens.
Ensure M panel commiunicate with the control module.
Installation of pneumatic gate valves at the fermentation zone.
Installation of electric AC Motors(Induction Motors) and several conveyors and linking them to control panels, MCC1,MCC2,MCC3,MCC4 and MCC5 (milling zone and Process zone respectively).
Direct Online starters and VFD Starters.
WORK EXPERIENCE: 2017 TILL DATE
POSITION: Team Lead
COMPANY: BISWAL
PROJECT: IHS POWER PROJECT
JOB DESCRIPTION
Servicing of AC and DC Generators at every 250 HOURS.
Installation of DC Generators with a power bank of 16 batteries of 200amps, 12v.
Installation of AC Generators and RECTIFIER Panel
Good Troubleshooting aproach to AC and DC Generators.
Ensure a supply of -48DC volts gets to Base transceiver station.
Writing of diesel supply reports & Preventive maintenance report using Excel software package.
Reporting to Regional supervisor, Regional Manager &Maintenance Manager on site Audit.
Good at using AUTOCAD Electrical software for Electrical Engineering design.
Use of Affectli App for site crompliance Audit.
POSITION: Electrial and Instrumentation Engineer. April 2013 TO July 2015- -
COMPANY: Adano Engineering Company Nigeria LTD
PROJECT: Emergency Inspection and Refurbishment of Forcados Terminal Tank 210
CLIENT: SPDC
JOB DESCRIPTION
Implementation of a farm tank monitoring system SCADA supervisory control and data acquisition system.
Implementation of circuit diagrams and reading of blueprints.
Installation of AC and DC panels .
Installation of a Good Earthing system.
Installtion of Field devices
Cable laying Ethics Termination and Glanding
Power planning and distribution round the site.
Repair and maintenance of 3 phase machines
Linking of Field devices to the Siemens controller through the process field bus.
POSITION: Eletrical and Instrumentation Engineer. Jan., 2015 April, 2015.
COMPANY: Adano Engineering Company Nigeria LTD
PROJECT: Revamping of Atlas Cove Depot- Demolition and Reconstruction of PMS Tanks 11 and 21.
CLIENT: NNPC
JOB DESCRIPTION
Installation of a FarmTank Gauging and monitoring system.( SCADA)
Cables sizes identification, instrument position identification.
Implementation of block and circuit diagram.
Installation of AC and DC panels.
Cable laying to various destination.
Installation of Depot Server.
Installation of Depot main controller panel.
Connection of server to HMI to monitor and control instrumented Tanks
Installation of MOVS motor operated valves
Installation of alarm system.
Identification of instrument and extraction of terminals.
Troubleshooting of PLC field devices using loop processor
POSITION: Electrical and Instrumentation Engineer. Oct, 2013 Jan., 2015.
COMPANY: Adano Engineering Company Nigeria LTD
PROJECT: Rehabilitation of Tanks 11, 12, 22 and Reconstruction of Tank 22 Mosimi . Depot, Ogun State
CLIENT: NNPC
JOB DESCRIPTION
Troubleshooting of AC and DC circuit.
Installation and Maintenance of AC and DC controlled machines
Repair and maintenance of single phase machines,
Installation of tank gauging and monitoring system in four tanks.
Repair and maintenance of instruments
.
Implementation of block and circuit diagrams
Identification of instrument and extraction of terminals.
Troubleshooting of PLC field devices using loop processor
Cable laying ethics/termination and Glanding
Use of Siemen PLC as main controller with 64 I/O Count .Installation of a tankhub,3 Instruments and a wireless thumb per tank
Installation of a depot server, depot controller and a gateway in the deport control room.
Mathematics and Physics Teacher (NYSC Program)
Maintenance and Repairs of Air Conditions.i
Katsina State
Industrial Training on Electrical/Electronics Machines 2006
S.G Jones Nig. Ltd., Warri
Repairs, Maintenance and Installations of 3 phase machines.
HUMANITIES, SOCIAL AND POLITICAL ENGAGEMENTS:
Financial Secretary NYSC July, 2008- June, 2009
Malumfashi L.G.A, Kastina State.
MEMBERSHIP/ORGANISATION:
Member, Federal Road Safety Club of Nigeria June, 2008
HOBBIES:
Reading, Sports and listen to Music.
REFEREES:
1. Dr. I.I Eneh
Senior Lecturer,
Electrical /Electronics Dept.
Enugu State University of Science and Technology (ESUT)
2 Dr. James Eke
HOD, Electrical/Electronics Dept
ESUT
3. Engr. Odion
Manager S.G Jones, Warri.
Delta State.
4.
Pastor John