Post Job Free
Sign in

Engineer Electrical

Location:
Hyderabad, Telangana, India
Salary:
35000
Posted:
April 14, 2021

Contact this candidate

Resume:

MD. KAMRAN Address

Vill – Saidpur, PO- Parsa

Dist – chhapra (saran),

State –Bihar, pin-841219

Email: ************@*****.***

Contact No: 898-***-****

WhatsApp no -898-***-****

Career Objective

To work in a challenging environment using all my skills & efforts to explore in a different fields and seek an opportunity for continuous learning. To be placed in a company in which I can use my technical skills and leadership qualities for uplift of the company and personal growth.

. WORKING EXPERIENCE

1. WORKING AS an “Execution Engineer” in '' Lanarsy infra limited.” Hyderabad.

DURATION: - 10th March 2020. To Continue...

DESCRIPTION: - JOB Responsibility

Subcontractor Bills checking On (Agriculture -Tube well connection) DHBVNL project in Haryana Work.

Checking Bills of Sub-Contractor on Rural Electrification DDUGJY, BSPSCL & RGGVY Project Work.

Preparing work order for subcontractor for all sites of Project.

Given Store Materials Approval for all working Sites.

Maintain all Store Stock Materials of all Circle of DHBVNL Project Haryana.

Issuing Work Order for Subcontractor with all working Sites.

Visiting sites for physical verification when required.

Checking MRN (Material Requisition Note) and issue the Materials for per Estimate providing by S.E/S.D.O. of DHBVNL Haryana.

Checking MIN (Material Issue Note) for daily basis and Issue the material for Subcontractor.

2. WORKING AS a “SITE ENGINEER” in “AK INFRA PROJECT PVT. LTD.”, NOIDA UP.

DURATION: - 16TH FEB 2016. TO 22th Sep 2019.

DESCRIPTION: - JOB Responsibility

*Survey of site & make single line diagram of that site, the survey depends on requirement of people & also we follow all REC standards.

*Pole dumping on various sites for erection.

*Have to give marking of poles to sub cons.

*Ensuring that the pole is erected as per the standard and all the poles are aligned.

*Check that the pole foundation is proper in size & depth.

*Ensures that the stone pad is dumped & concrete mixture is as per the standard.

*Ensuring that the pole phase is correct so that cable laying and stay installation can be done properly.

*To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.

*Making indent of material to sub cons.

*Ensures that DTR structure is being fitted properly as per technical specifications.

*Ensures that after erection of DTR earthing is done in a proper way, sees that all the strips and GI wires are connected with the help of nuts & bolts & chemical bag is used.

*Ensures that when conductor is being laying there should not be any joint, stringing should be done from starting point to the ending point without any cuts in the conductor.

*Checking the oil levels of DTR at the time of erection.

*Ensuring that the cable is pierced properly with a connector on a section pole.

*Ensures that during stringing of cable & conductor no damage has been done on the cable & conductor.

*Ensures that all the works on site has been done with all the safety norms.

*Conducting toolbox talk on site for safety and quality of work.

*Execution of High side & low side Electrical work as per drawing and site condition.

*Ensure that the works are undertaken in a safe manner utilizing a project specific safety plan and adopt safe working culture with help of safety person at site

*Managing the complete planning of the execution and inspection of work along with the completion of report.

*Measurement of village and making as built drawing.

*Making bills of sub-cons.

*Regular meetings with JEs and SDOs for handing over of villages

*Regular inspection of sites for maintaining the quality of work.

3. Work as a SERVICE ENGINEER in DYNAPRO MOTION CONTROL PVT. LTD.NAGPUR

DURATION: - 4rth Nov 2013 to 12th DEC 2015.

DESCRIPTION: - A PROJECT BASED ON UHF, VHF UNDERGROUND Leaky feeder COMMUNICATION SYSTEM IN “HINDUSTAN ZINC LIMITED. ’’

*Installation of leaky feeder communication system in underground mines for run the Radio Frequency.

*Installation of walkies -talkie, vehicle radio, Ethernet communication system.

*Installation of Tag-reader, Traffic light controller.

*Installation of Gas Sensors in Working Areas in Underground.

*Provided Tag to All the workers in underground Mines to locate where the worker is working.

*Installation of DTR for filling substation 11kv/440v/110v.

*Installation of CCTV camera for filling area.

*Installation of AC to DC power supply converter to run the CCTV Camera, Tag Reader, Gas Sensors,

Walkie-Talkies in underground mines working areas.

Educational Qualification

Bachelors of Technology in “Electrical & Electronics Engineering” from Jawaharlal Nehru Technological University Hyderabad, in the Year 2009-2013.

Intermediate (Physics, Chemistry, Mathematics) from BSEB Bihar in 2009.

High School from BSEB Board, Bihar in 2007.

IT Exposure: Basic, Windows, Internet, MS Word/Excel/Power point.

Technical Skills

Familiar with MATLAB and SPICE

Proficient with MS Office, Windows Environment and Internet.

Familiar with Computer Fundamental and C language.

Strength

Self-motivator, Quick learner.

Adaptable personality, Good team player.

Proficient in communication skill.

Dedicated Hard work & responsible.

Main project

Name: Project on “wind farm to weak grid connection using UPQC custom power device”.

Client: Wine yard technologies

Software used: MATLAB

Duration: 12 APRIL TO 23TH MAY 2013.

Description:

This project paper is based on IEEE. Wind farm employing squirrel cage induction generator directly connected to grid which represents wind energy conversion system, but due to variation in load and wind,

grid becomes weak, poor voltage regulation, worsening power quality and instability. So to overcome this problem we are using UPQC compensator, which compensates the voltage and power.

Role: Team leader

Mini project

Name: Mini project on “Solar highway lightning automatically turn OFF during day time”

Client: Wine yard technologies

Duration: 18 may, 2012 to 12 June, 2012

Description:

This project is based on the conversion of solar energy into electrical energy to use for various loads but we used for solar highway lightning system. We also used LDR sensor -to sense the light intensity and accordingly switch ON or OFF the light.

Role: Team member

Personal details

Father’s name : Mr. Md MOKHTAR

Date of Birth : 7th Dec, 1992

Sex : Male

Nationality : Indian

Hobbies : MODELING ELECTRONICS CKT, Reading Books, SINGING SONG and Playing Cricket.

Languages known : English, Hindi & Urdu.

Permanent Address : Saidpur, Po-Parsa, Dist.-Chhapra (Saran)

State: Bihar, PIN: 841219

Declarations

I hereby solemnly declare that the above Furnished Particulars Are True to the best of my knowledge & belief & I bear all responsible for the correctness of the above mentioned particulars.

Date:

Place: (MD KAMRAN)



Contact this candidate