P R O F I L E
Washington accord Certified, energetic,
proactive individual proficient in the
enhancement of electrical systems. I am
seeking an electrical engineering position with
a progressive organization to utilize 2+ years of
professional engineering experience in the
research & development of manufacturing
processes for electrical and electronic
components.
S K I L L S
Team Work
Leadership
Innovative
Work Under
Pressure
Enthusiasm
Motivated
Presentation
Organize
Soft Skills
C O M P U T E R
S K I L L S
MS Office
MATLAB
E D U C A T I O N
2017 BEIJING INSTITUTE OF TECHNOLOGY, CHINA
Master of Science (MS) in Engineering
Major: Control Science and Engineering
Result: 88.4%
2014 UNIVERSITY OF ENGINEERING AND TECHNOLOGY (UET) PESHAWAR, PAKISTAN
Bachelor of Science (B.Sc.) in Engineering
Major: Electrical Engineering
CGPA: 3.20/4.00
2008 NISAR SHAHEED INTERMEDIATE COLLEGE RISALPUR
CANTONMENT, NOWSHERA, PAKISTAN
Pre-Engineering (Maths, Physics, and Chemistry)
Result: 1st Division
2006 GOVERNMENT HIGHER SECONDARY SCHOOL TAKKAR,
MARDAN, PAKISTAN
SSC Science (Maths, Physics, Chemistry, and Biology) Result: 1st Division
E X P E R I E N C E
Dec 2014 –
Sep 2015
ELECTRICAL ENGINEER – POWER PLANT, STM –
SWABI, PAKISTAN
I have worked as an Electrical Engineer in the power plant of Saif Textile Mills Limited, situated in Gadoon, Swabi, for almost one year. Where my main accomplishments were below,
Major accomplishments:
Actively Participated in the erection and
commissioning of Caterpillar Gas Gensets G3520C,
G3516A, G3516B, and Diesel Genset D3512, Waste
Heat Recovery Boiler.
Maintain, install, operate, and repair distribution HT
(11kV) and LT (440V) VCBs, OCBs, and other
electrical equipment.
Worked on the layout of the extension design of the plant.
Participated in the testing of Electrical machines. Sep 2014 –
Dec 2014
INTERNSHIP – RAHMAN COTTON MILLS LIMITED –
TAKHT BHAI, PAKISTAN.
I have completed three months internship period in Rahman Cotton Mills (Pvt.) Limited Takht Bhai, where I learned about different types of AC & DC motors caterpillar gensets generators, model G3520E/G3512E.
Major accomplishments:
Worked as an assistant with Electrical Engineer
95%
90%
YASIR ALI
MS ELECTRICAL(CONTROL) ENGINEERING
Gharib Abad, Takht Bhai
Mardan, KP, 23160
********.*******@*****.***
Simulink
Multisim
C++
Python
Photoshop
L a n g u a g e s
English
Urdu
Chinese
R E F E R E N C E S
Dr. Sahib Khan
Professor – UET MARDAN
Dr. Xia Yuanqing
Professor – BEIJING INSTITUTE OF TECHNOLOGY
Writing a weekly report of what I learned to Senior Engineer.
Attending monthly lecture from Senior Engineer.
Aug 2013 –
Oct 2013
INTERNSHIP – MALAKAND HYDRO-POWER COMPLEX
(MALAKAND-III), DARGAI, PAKISTAN
Learned about power plant layout, its equipment and subsystems, operation methodology, and electrical
maintenance techniques.
Jun 2013 –
Aug 2013
INTERNSHIP – PAKISTAN TELECOMMUNICATION
COMPANY LIMITED (PTCL), MARDAN, PAKISTAN
Gained quality-level working experience in operation & maintenance of digital exchanges and OMCs, NMCs of EWSD and ZTE and working of CDAS, trunk booking, and quality assurance of the region's telecommunication systems. Aug 2012 –
Sep 2012
INTERNSHIP – TURBALA HYDRO-POWER STATION,
KP, PAKISTAN
Learned about the Turbines, Electrical Power Production, Controlling, and Transmission. I also have spent some time in different sections, like Maintenance, Mechanical, Electrical, and Protection.
P U B L I C A T I O N S
Jan 2019 Yasir Ali et al., "SOLUTIONS VERIFICATION FOR CLOUD-BASED NETWORKED CONTROL SYSTEM USING KARUSH-KUHN-TUCKER
CONDITIONS" 2018 Chinese Automation Congress (CAC), Xi'an, China, 2018, pp. 1385-1389, doi: 10.1109/CAC.2018.8623109 Jan 2018 Yasir Ali, Xia Yuanqing, and Liang Ma, "A STABILIZING ARCHITECTURE FOR CLOUD CONTROL SYSTEM AGAINST DISTRIBUTED DENIAL OF SERVICE (DDOS) ATTACK," 2017 Chinese Automation Congress (CAC), Jinan, 2017, pp. 3423-3428, doi: 10.1109/CAC.2017.8243372 Jan 2018 Ali Yasir, Xia Yuanqing., Ma Liang, et al. SECURE DESIGN FOR CLOUD CONTROL SYSTEM AGAINST DISTRIBUTED DENIAL OF SERVICE ATTACK. Control Theory, Technol. 16, 14–24 (2018). https://doi.org/10.1007/s11768-018-8002-8
Jul 2017 Liang Ma, Yuanqing Xia, Yasir Ali and Y. Zhan, "ENGINEERING PROBLEMS IN INITIAL PHASE OF CLOUD CONTROL SYSTEM," 2017 36th Chinese Control Conference (CCC), Dalian, 2017, pp. 7892-7896, doi: 10.23919/ChiCC.2017.8028603
Apr 2017 Hammad Ahmad, Xiaolan Yao, M. Muddassir, Javira Chiragh, and Yasir Ali, "HUMANOID ROBOTS OBJECT GRASPING AND MANIPULATION LEARNING BY DEMONSTRATION," 2017 3rd International Conference on Control, Automation, and Robotics (ICCAR), Nagoya, 2017, pp. 158- 161, doi: 10.1109/ICCAR.2017.7942678
I N T E R E S T S
MOVIES MUSIC INTERNET TRAVELLING PAINTING
80%
95%
70%
75%
60%